--- title: Leesburg Zoning Ordinance, Sec. 11.08. Field quality control collection: local-codes id: local-code:leesburg/zoning/11.08 cite_as: Leesburg, Ga., Zoning Ordinance ยง 11.08 canonical_url: https://georgiacommons.org/code/local/leesburg/zoning/11.08 md_url: https://georgiacommons.org/code/local/leesburg/zoning/11.08.md text_url: https://georgiacommons.org/code/local/leesburg/zoning/11.08/text source_url: https://library.municode.com/ga/leesburg/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:leesburg jurisdiction_name: Leesburg place_fips: "1345768" corpus_version: local-codes-leesburg-12e648c39c4a publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/leesburg/zoning/~appendix-c/~article-xi/~division-2.md previous: https://georgiacommons.org/code/local/leesburg/zoning/11.07.md next: https://georgiacommons.org/code/local/leesburg/zoning/11.09.md index: https://georgiacommons.org/code/local/leesburg.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:leesburg/zoning/11.08@2026-11-11-98ce4e55f1 --- # Leesburg Zoning Ordinance, Sec. 11.08. Field quality control > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix C - LAND DEVELOPMENT REGULATIONS / Article XI - SANITARY SEWAGE REQUIREMENTS / Division 2 - SANITARY SEWER STANDARDS AND SPECIFICATIONS (a) Infiltration. (1) Infiltration into the sewer shall not exceed 200 gpm per mile of sewer per inch of inside diameter of pipe per 24 hours in any section between successive manholes. The amount of leakage shall be measured by a weir or other suitable device. This measurement shall be made between 12:00 a.m. and 6:00 a.m., unless line segments are plugged to prevent normal sewage flow or it is a new line that has no taps connected. (2) If the infiltration exceeds the specified amount, necessary corrections shall be made to bring the line septage within the acceptable limit. All visible leaks or points of infiltration shall be repaired even if the infiltration is below the specified limit. (b) General leakage requirements. (1) The entire sewer line system shall be as watertight as possible. Eliminate all visible points of ground water infiltration and any other significant points of leakage which can be located, regardless of test results obtained as hereinafter required. (2) Upon completion of pipe installation and trench backfilling to within one foot of finished grade, perform system infiltration test and piping or joint air test for all work constructed. (3) Infiltration testing is required on all new sewer line segments extending completely from manhole to manhole unless waived by the city. (c) System infiltration testing. (1) Measure infiltration into each major section of sewer during wet weather as requested by the city. Use suitable temporary weirs and depth measuring devices acceptable to the city as giving reasonably accurate flow measurement, to be furnished, installed and removed by the contractor. (2) Take whatever action may be necessary to permanently reduce infiltration from all water sources into all constructed work to rates, as determined by tests witnessed by the city which do not exceed 0.0375 gallons per inch of nominal pipe diameter per foot of pipe per 24 hours. (d) Air testing. (1) Nominal four-inch to 36-inch pipe: After completing backfill of a sewer line section, conduct a low pressure air test using methods and devices acceptable to the city. Perform such tests using the following general procedures. (2) Temporarily plug line segment between two manholes using plugs having airtight fittings through which low pressure air can be introduced into the pipe segment being tested. (3) Introduce low pressure air into the test pipe segment until the internal air pressure reaches 4.0 psi above ground water pressure if any. (4) Wait at least two minutes for air temperature in the test segment to stabilize while internal air pressure remains no less than 3.5 psig above ground pressure. (5) Accurately determine the elapsed time for internal pressure to drop 1.0 psi. (6) The air test is acceptable if elapsed time is no less than shown by the following table: Pipe Diameter (inches) Seconds per 100 Feet of Pipe 4 18 6 42 8 72 10 90 12 108 15 126 18 144 21 180 24 216 27 252 30 324 36 360 (7) Air leakage time is based on pipe being damp. If pipes and joints are dry, dampen line if helpful in meeting air test time requirements. (e) Deflection testing. (1) Conduct internal deflection testing on all installed gravity sewer lines six-inch size and larger, no sooner than 15 days after completion of trench backfilling. Repair or replace all defective pipe found during mandrel testing and conduct another deflection test to determine the extent and necessary repair of any additional deficiencies. After repairing all defects, perform successful mandrel testing in the presence of the city. Mandrel testing is successful when the mandrel device can be pulled through the pipe between manholes in a continuous operation, without interruption. (2) Furnish mandrel test gauges, sized and constructed below: Five Percent Deflection Mandrel (ASTM D 2412) Nominal Size (inches) Mandrel O.D. (inches) Tolerance (inches) Nearest 1 /16-Inch Minimum Runner Length Minimum Number of Mandrel Runners 6 5.45 0.01 57 /16 4 6 8 7.28 0.01 74 /16 4 6 10 9.08 0.01 91 /16 5 8 12 10.79 0.01 1013/16 6 8 (f) Certification. Upon request of the manager of development services, the contractor shall certify the accuracy of the mandrel test gauges by use of proving rings to an accuracy of 0.05 inches. Use proving rings complying with ASTM F 679 and ASTM D 3034.