Leesburg · Zoning Ordinance
Appendix A - ZONING / Article XVIII - COMMERCIAL DESIGN STANDARDS
Sec. 18.03. Procedural requirements for approval of permit.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
At the time of submission of building plans for plan review for building permit approval, the applicant shall submit detailed architectural drawings demonstrating compliance with these design standards. No plans shall be accepted without drawings in sufficient detail to allow community development and planning staff to assess compliance. Within ten business days, the planning and development director, or his/her designee shall review the architectural drawings and determine if the proposed design complies with the standards of this section and section 16.05.
If the proposed design does not meet the standards set forth herein, the planning and development director or designee shall submit to the applicant in writing via certified mail with return receipt the standards with which the proposed design does not comply. The applicant shall have ten business days from receipt of the notification to resubmit architectural drawings demonstrating compliance with the standards. Failure to resubmit architectural drawings within the specified time period will result in denial of the application for a building permit. The applicant shall have the right to appeal the decision of the planning and development director, or his/her designee, to the planning commission only after the applicant has resubmitted architectural drawings in accordance with the process above and the planning and development director, or his/her designee, has determined the revised drawings do not comply with the design standards.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.