--- title: Leesburg Zoning Ordinance, Sec. 3.30. Plan and profile of sanitary sewer collection: local-codes id: local-code:leesburg/zoning/3.30 cite_as: Leesburg, Ga., Zoning Ordinance ยง 3.30 canonical_url: https://georgiacommons.org/code/local/leesburg/zoning/3.30 md_url: https://georgiacommons.org/code/local/leesburg/zoning/3.30.md text_url: https://georgiacommons.org/code/local/leesburg/zoning/3.30/text source_url: https://library.municode.com/ga/leesburg/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:leesburg jurisdiction_name: Leesburg place_fips: "1345768" corpus_version: local-codes-leesburg-12e648c39c4a publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/leesburg/zoning/~appendix-c/~article-iii/~division-3.md previous: https://georgiacommons.org/code/local/leesburg/zoning/3.29.md next: https://georgiacommons.org/code/local/leesburg/zoning/3.31.md index: https://georgiacommons.org/code/local/leesburg.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:leesburg/zoning/3.30@2026-11-11-4f1714f7e6 --- # Leesburg Zoning Ordinance, Sec. 3.30. Plan and profile of sanitary sewer > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix C - LAND DEVELOPMENT REGULATIONS / Article III - LAND DEVELOPMENT PERMITS / Division 3 - CONSTRUCTION PLAN STANDARD AND SPECIFICATIONS (a) Plan view shall show the following: (1) Label and show all existing contours at a maximum two-foot interval; (2) Label and show all proposed contours at a maximum one-foot interval; (3) All grade work to be shown by contours or grade slope indicators; (4) Road pavement and/or curb and gutter edges; (5) Right-of-way limits; (6) Easements, minimum building front and rear setbacks, if applicable; (7) If crossing is made with storm sewer system then show detail construction information about storm system such as inverts, pipe size, grade, type of pipe, number of inlets, amount of rip-rap (length and width dimensions); (8) If crossing water lines and structures show elevations of such; (9) Sewer lines, structures, alignment and related information such as elevations, grades, pipe size and type, inverts, stations of structures, etc.; (10) Station numbers; and (11) Stations display at least at 100-foot intervals. (b) Profile view shall show the following: (1) Existing contour elevations; (2) Sewer line information; (3) Station numbers; (4) Base elevations; (5) Any pipe crossings; (6) Stations display at 100-foot intervals; and (7) Transition locations.