--- title: Leesburg Zoning Ordinance, Sec. 5.15. Route clearing collection: local-codes id: local-code:leesburg/zoning/5.15 cite_as: Leesburg, Ga., Zoning Ordinance ยง 5.15 canonical_url: https://georgiacommons.org/code/local/leesburg/zoning/5.15 md_url: https://georgiacommons.org/code/local/leesburg/zoning/5.15.md text_url: https://georgiacommons.org/code/local/leesburg/zoning/5.15/text source_url: https://library.municode.com/ga/leesburg/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:leesburg jurisdiction_name: Leesburg place_fips: "1345768" corpus_version: local-codes-leesburg-12e648c39c4a publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/leesburg/zoning/~appendix-c/~article-v/~division-2.md previous: https://georgiacommons.org/code/local/leesburg/zoning/5.14.md next: https://georgiacommons.org/code/local/leesburg/zoning/5.16.md index: https://georgiacommons.org/code/local/leesburg.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:leesburg/zoning/5.15@2026-11-11-c0e28eebc5 --- # Leesburg Zoning Ordinance, Sec. 5.15. Route clearing > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix C - LAND DEVELOPMENT REGULATIONS / Article V - GENERAL CONSTRUCTION; WORK CONDITIONS / Division 2 - GENERAL CONSTRUCTION STANDARDS AND SPECIFICATIONS The extent of route clearing required is that minimum degree of clearing necessary to install utilities and appurtenances, and such additional clearing as shown on the drawings. (a) Clearing. (1) Remove above-grade structures only where specifically authorized. (2) Remove abandoned underground facilities such as utilities and structures, walls, footings, basements, wells, septic tanks, tanks, underground pipe, and other items which conflict with construction. (b) Holes and depressions. (1) Fill holes, depressions and voids created or exposed by clearing operations with non-organic soil material, unless further excavation earth work is indicated. (2) Place fill material in horizontal layers not exceeding six inches loose depth and thoroughly compact to a density at least equal to adjacent ground. (c) Disposal of waste material. (1) Dispose of all material in accordance with all local, state and federal laws, rules and regulations. (2) Burning of cleared materials on the work site is only permitted when authorized by the Forestry Service.