(a) All streets, roads, and service drives shall be graded so that the entire right-of-way can be constructed to the required cross section. Before grading is started the entire right-of-way shall first be cleared of stumps, roots, brush and other objectionable materials, along with all trees and other topographical features not intended for preservation. (b) The stumps, holes and trenches shall be carefully backfilled and tamped. Heavy sod and all soft, yielding, or otherwise unsuitable materials shall be removed and replaced with acceptable fill material. (c) All suitable materials from roadway cuts may be used in the construction of fills, approaches, or at other places as needed. The fill shall be spread in layers and compacted. Compacted layers shall not exceed eight inches in thickness. Fills shall be rolled in accordance with state department of transportation standards. The top 12 inches of soil in both cut and fill sections shall have a dry weight density equal to or greater than 95 percent of that obtained by AASHTO designation T-99, method A or C. (d) All compaction testing shall be performed to the satisfaction of the manager of development services and no base materials shall be placed over the subgrade until all test results have been approved by the manager of development services. (e) Grading shall progress so as to ensure good drainage and prevent formation of depressions where water may collect in the right-of-way. (f) When the natural soil cannot be made stable enough to support construction traffic, subgrade modification shall be accomplished by incorporating various standard methods such as placing course, graded, crushed stones or placing geotextile fabric. The method employed shall be approved by the manager of development services before starting work. The subgrade shall have provisions to intercept groundwater from springs and seepage plains that will prevent saturation of the subgrade. The finished subgrade shall be true to grade, free from roots and uniformly firm.