Skip to content
Georgia Commons
Menu

Leesburg · Zoning Ordinance

Appendix C - LAND DEVELOPMENT REGULATIONS / Article VII - STORM DRAINAGE SYSTEMS / Division 1 - GENERALLY

Sec. 7.08. General criteria.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) A development's storm drainage facilities shall be designed so that there is no increase in the flooding of property upstream or downstream of the development without all the affected landowner's consent in the form of recorded drainage easements.

(b) A system emphasizing a natural as opposed to an engineered drainage strategy shall be encouraged.

(c) The storm drainage facilities shall have the hydraulic characteristics to accommodate the expected design flow of stormwaters, which consists of the:

(1) Off-site and on-site stormwater, including stormwater coming into a tract from upstream;

(2) Discharge of water into a natural drainageway; and

(3) Means to convey water to a point where it will flow downstream into a stream, water channel or drainageway, or where it can be connected into an adequate existing or proposed facility.

(d) Storm drainage facilities shall be designed on the basis of ultimate known or projected developments (proposed by the developer) for the tributary watershed. If a stormwater management basin (holding, detention or retention pond) is to be constructed, only the storage volume required for the immediate proposed construction is required to be constructed. As additional areas are developed, the additional storage volume is required to be constructed.

Even though only what is required at the time of construction is to be built, the ultimate known development shall be totally designed for at the time of first proposed phase of development.

(e) In no circumstances shall runoff be diverted to public or private property or public or private rights-of-way without recorded easements from the property owner.

(f) No storm drainage shall empty into a sanitary sewer line or system.

(g) Special consideration shall be given to innovative drainage designs that would not adversely affect the quality of development in a particular area.

(h) No damming or ponding of water in gutters, public streets or other waterways shall be permitted except to a very limited extent where the manager of development services shall consider it necessary.

(i) Flow or storage of water across, over, or on public streets or parking lots intended for use by the public, except through approved, properly constructed drainage systems, shall not be allowed during the storm event.

(j) The 100-year flow pattern (overland and collection system) shall be defined, and any existing or future structures located in the overland flow path shall be elevated or constructed to above the defined flooding level. Final subdivision plats shall state which structures have minimum floor elevations.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:leesburg/zoning/7.08@2026-11-11-e213b8cfab

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Leesburg Zoning Ordinance, Sec. 7.08. General criteria | Georgia Commons