(a) If a public stormwater sewer system is reasonably accessible as determined by the manager of development services, the developer shall connect such storm drainage systems and shall do all grading and provide all drainage structures necessary to properly carry the water to the storm drainage system. (b) If a public stormwater sewer system is not accessible as determined by the manager of development services, the developer shall not connect with such storm drainage systems and shall do all grading and provide all drainage structures that are necessary to properly carry water to locations in compliance with this article.