Sec. 7.12. Stormwater concept plan and consultation meeting.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Before any stormwater management permit application is submitted, the land owner or developer shall meet with the development services director or his designee for a consultation meeting on a concept plan for the post-development stormwater management system to be utilized in the proposed land development project. This consultation meeting shall take place at the time of the preliminary planning of the subdivision. The purpose of this meeting is to discuss the post-development stormwater management measures necessary for the proposed project, as well as to discuss and assess constraints, opportunities and potential ideas for stormwater management designs before the formal site design engineering is commenced.

To accomplish this goal the following information shall be included in the concept plan, which shall be submitted in advance of the meeting:

(1) Existing conditions/proposed site plans. Existing conditions and proposed site layout sketch plans, which illustrate at a minimum the following: existing and proposed topography, including all closed contours within the watershed basin that are immediately adjacent to or contained within the development site; perennial and intermittent streams; mapping of predominant soils from soil surveys (when available); boundaries

of existing predominant vegetation and proposed limits of clearing and grading; and location of existing and proposed roads, buildings, parking areas and other impervious surfaces.

(2) Natural resources inventory. A written or graphic inventory of the natural resources at the site and surrounding area, as it exists prior to the commencement of the project.

This description should include a discussion of soil conditions including the (wet) seasonal high water table, forest cover, topography, wetlands, and other native vegetative areas on the site, as well as the location and boundaries of other natural feature protection and conservation areas such as wetlands, lakes, ponds, floodplains, stream

buffers and other setbacks (e.g., drinking water well setbacks, septic setbacks, etc.).

Particular attention should be paid to environmentally sensitive features that provide particular opportunities or constraints for development.

(3) Stormwater management system concept plan. A written or graphic concept plan of the proposed post-development stormwater management system including the following:

preliminary selection and location of proposed structural stormwater controls; location of existing and proposed conveyance systems such as grass channels, swales, and storm drains; flow paths; location of floodplain/floodway limits; relationship of site to

upstream and downstream properties and drainages; and preliminary location of proposed stream channel modifications, such as bridge or culvert crossings.

Local watershed plans, the Lee County Greenspace Protection Plan and map, and any relevant resource protection plans will be consulted in the discussion of the concept plan.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:leesburg/zoning/7.12@2026-11-11-4d98795db1

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Leesburg Zoning Ordinance, Sec. 7.12. Stormwater concept plan and consultation meeting | Georgia Commons