Downstream overbank flood and property protection shall be provided by controlling (attenuating) the post-development peak discharge rate to the pre-development rate for the 25-year, 24-hour return frequency storm event. If control of the one-year, 24-hour storm under section 4.02 is exempted, then peak discharge rate attenuation of the two-year through the 25-year return frequency storm event must be provided. (1) This requirement may be adjusted or waived by the development services director or his designee for sites where the post-development downstream analysis shows that uncontrolled post-development conditions will not increase downstream peak flows, or that meeting the requirement will cause greater peak flow downstream impacts than the uncontrolled post-development conditions.