--- title: Leesburg Zoning Ordinance, Sec. 7.26. Extreme flooding protection collection: local-codes id: local-code:leesburg/zoning/7.26 cite_as: Leesburg, Ga., Zoning Ordinance ยง 7.26 canonical_url: https://georgiacommons.org/code/local/leesburg/zoning/7.26 md_url: https://georgiacommons.org/code/local/leesburg/zoning/7.26.md text_url: https://georgiacommons.org/code/local/leesburg/zoning/7.26/text source_url: https://library.municode.com/ga/leesburg/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:leesburg jurisdiction_name: Leesburg place_fips: "1345768" corpus_version: local-codes-leesburg-12e648c39c4a publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/leesburg/zoning/~appendix-c/~article-vii/~division-3.md previous: https://georgiacommons.org/code/local/leesburg/zoning/7.25.md next: https://georgiacommons.org/code/local/leesburg/zoning/7.27.md index: https://georgiacommons.org/code/local/leesburg.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:leesburg/zoning/7.26@2026-11-11-ae1140be58 --- # Leesburg Zoning Ordinance, Sec. 7.26. Extreme flooding protection > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix C - LAND DEVELOPMENT REGULATIONS / Article VII - STORM DRAINAGE SYSTEMS / Division 3 - POST-DEVELOPMENT STORMWATER MANAGEMENT Extreme flood and public safety protection shall be provided by controlling and safely conveying the 100-year, 24-hour return frequency storm event such that flooding is not exacerbated. (1) This requirement may be adjusted or waived by the development services director or his designee for sites where the post-development downstream analysis shows that uncontrolled post-development conditions will not increase downstream peak flows, or that meeting the requirement will cause greater peak flow downstream impacts than the uncontrolled post-development conditions.