Skip to content
Georgia Commons
Menu

Leesburg · Zoning Ordinance

Appendix C - LAND DEVELOPMENT REGULATIONS / Article VII - STORM DRAINAGE SYSTEMS / Division 3 - POST-DEVELOPMENT STORMWATER MANAGEMENT

Sec. 7.28. Stormwater credits for nonstructural measures.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

The use of one or more site design measures by the applicant may allow for a reduction in the water quality treatment volume required under section 7.20. The applicant may, if approved by the development services director or his designee, take credit for the use of stormwater better site design practices and reduce the water quality volume requirement. For each potential credit, there is a minimum set of criteria and requirements which identify the conditions or circumstances under which the credit may be applied. The site design practices that qualify for this credit and the criteria and procedures for applying and calculating the credits are included in the Georgia Stormwater Management Manual.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:leesburg/zoning/7.28@2026-11-11-4a99e0fb6f

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Leesburg Zoning Ordinance, Sec. 7.28. Stormwater credits for nonstructural measures | Georgia Commons