--- title: Leesburg Zoning Ordinance, Sec. 7.31. Inspections to ensure plan compliance during construction collection: local-codes id: local-code:leesburg/zoning/7.31 cite_as: Leesburg, Ga., Zoning Ordinance ยง 7.31 canonical_url: https://georgiacommons.org/code/local/leesburg/zoning/7.31 md_url: https://georgiacommons.org/code/local/leesburg/zoning/7.31.md text_url: https://georgiacommons.org/code/local/leesburg/zoning/7.31/text source_url: https://library.municode.com/ga/leesburg/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:leesburg jurisdiction_name: Leesburg place_fips: "1345768" corpus_version: local-codes-leesburg-12e648c39c4a publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/leesburg/zoning/~appendix-c/~article-vii/~division-4.md previous: https://georgiacommons.org/code/local/leesburg/zoning/7.30.md next: https://georgiacommons.org/code/local/leesburg/zoning/7.32.md index: https://georgiacommons.org/code/local/leesburg.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:leesburg/zoning/7.31@2026-11-11-6bf543c8df --- # Leesburg Zoning Ordinance, Sec. 7.31. Inspections to ensure plan compliance during construction > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix C - LAND DEVELOPMENT REGULATIONS / Article VII - STORM DRAINAGE SYSTEMS / Division 4 - CONSTRUCTION INSPECTIONS OF POST-DEVELOPMENT STORMWATER MANAGEMENT SYSTEM Periodic inspections of the stormwater management system construction shall be conducted by the development services director or his designee or conducted and certified by a professional engineer who has been approved by the development services director or his designee. Construction inspections shall utilize the approved stormwater management plan for establishing compliance. All inspections shall be documented with written reports submitted to the development services director's office and shall contain, at a minimum, the following information: (1) The date and location of the inspection; (2) Whether construction is in compliance with the approved stormwater management plan; (3) Variations from the approved construction specifications; and (4) Any other variations or violations of the conditions of the approved stormwater management plan. If any violations are found, the applicant shall be notified in writing of the nature of the violation and the required corrective actions. Such corrective action shall be taken by the party responsible therefore within a reasonable time as required by the development services director.