--- title: Leesburg Zoning Ordinance, Sec. 7.32. Final inspection and as-built plans collection: local-codes id: local-code:leesburg/zoning/7.32 cite_as: Leesburg, Ga., Zoning Ordinance ยง 7.32 canonical_url: https://georgiacommons.org/code/local/leesburg/zoning/7.32 md_url: https://georgiacommons.org/code/local/leesburg/zoning/7.32.md text_url: https://georgiacommons.org/code/local/leesburg/zoning/7.32/text source_url: https://library.municode.com/ga/leesburg/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:leesburg jurisdiction_name: Leesburg place_fips: "1345768" corpus_version: local-codes-leesburg-12e648c39c4a publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/leesburg/zoning/~appendix-c/~article-vii/~division-4.md previous: https://georgiacommons.org/code/local/leesburg/zoning/7.31.md next: https://georgiacommons.org/code/local/leesburg/zoning/7.33.md index: https://georgiacommons.org/code/local/leesburg.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:leesburg/zoning/7.32@2026-11-11-52b3540525 --- # Leesburg Zoning Ordinance, Sec. 7.32. Final inspection and as-built plans > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix C - LAND DEVELOPMENT REGULATIONS / Article VII - STORM DRAINAGE SYSTEMS / Division 4 - CONSTRUCTION INSPECTIONS OF POST-DEVELOPMENT STORMWATER MANAGEMENT SYSTEM Upon completion of a project, and before a certificate of occupancy or final approval shall be granted, the applicant is responsible for certifying that the completed project is in accordance with the approved stormwater management plan. All applicants are required to submit actual as-built plans for any stormwater management facilities or practices after final construction is completed. The plan must show the final design specifications for all stormwater management facilities and practices and must be certified by a professional engineer. A final inspection by the development services director or his designee is required before the release of any performance bonds or securities can occur.