--- title: Leesburg Zoning Ordinance, Sec. 3.03 (Appendix C, Article III, Division 1). Activities that require permits collection: local-codes id: local-code:leesburg/zoning/appendix-c-article-iii-division-1-3.03 cite_as: Leesburg, Ga., Zoning Ordinance, Appendix C, Article III, Division 1, ยง 3.03 canonical_url: https://georgiacommons.org/code/local/leesburg/zoning/appendix-c-article-iii-division-1-3.03 md_url: https://georgiacommons.org/code/local/leesburg/zoning/appendix-c-article-iii-division-1-3.03.md text_url: https://georgiacommons.org/code/local/leesburg/zoning/appendix-c-article-iii-division-1-3.03/text source_url: https://library.municode.com/ga/leesburg/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:leesburg jurisdiction_name: Leesburg place_fips: "1345768" corpus_version: local-codes-leesburg-12e648c39c4a publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/leesburg/zoning/~appendix-c/~article-iii/~division-1.md previous: https://georgiacommons.org/code/local/leesburg/zoning/appendix-c-article-iii-division-1-3.02.md next: https://georgiacommons.org/code/local/leesburg/zoning/appendix-c-article-iii-division-1-3.04.md index: https://georgiacommons.org/code/local/leesburg.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:leesburg/zoning/appendix-c-article-iii-division-1-3.03@2026-11-11-79035a1211 --- # Leesburg Zoning Ordinance, Sec. 3.03 (Appendix C, Article III, Division 1). Activities that require permits > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix C - LAND DEVELOPMENT REGULATIONS / Article III - LAND DEVELOPMENT PERMITS / Division 1 - GENERALLY (a) A land development permit shall be required prior to the commencement of any construction for the purpose of residential, commercial, industrial or institutional uses or for major subdivisions, as defined in section 1.08 of the subdivision regulations that have been granted preliminary approval by the planning commission. All persons proposing development and/or construction in the city for a major subdivision, as part of a larger plan of development or sale shall submit a stormwater plan to the city for approval. The stormwater plan may consist of a combination of storage and/or controlled release of stormwater runoff in accordance with article VII of this ordinance. On-site detention or retention shall be required when the proposed development will increase the peak rate of runoff by more than one cubic foot per second (CFS) for a ten-year frequency storm. A proposed development shall include any and all phases of a plan or general development plan under the same name or ownership. (b) An individual site development permit shall be acquired prior to the beginning of any construction for the purpose of commercial, industrial, institutional or residential developments requiring site construction improvements on already subdivided parcels of property. (c) An erosion and sedimentation control permit shall be acquired prior to the beginning of any land disturbing activities that are not exempt under this ordinance. This permit is included in subsections (a) and (b) of this section. (d) A right-of-way/easement permit shall be required for the use [of] city rights-of-way or easements for the construction, installation, or maintenance of any public or private utility, any other facility approved by the city council, any structure, driveway, culvert, pavement or object in the right-of-way or easements other than those constructed or maintained by the city council. (1) Exemptions. No right-of-way/easement permits shall be required for the following: a. Construction of water, sewer, power, telephone or other utilities in subdivisions in accordance with plans approved by the planning and development department where such construction will be completed prior to the acceptance of the rightsof-way and easements by the city council and done as part of the permitted subdivision site improvement. b. Repairs of previously permitted utilities in the right-of-way; provided, however, such repairs do not require cutting of any pavement, including curbs and sidewalks.