Skip to content
Georgia Commons
Menu

Leesburg · Zoning Ordinance

Appendix C - LAND DEVELOPMENT REGULATIONS / Article III - LAND DEVELOPMENT PERMITS / Division 1 - GENERALLY

Sec. 3.05. Documentation and/or conditions required for all land development permits.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

The following minimum document information (plan) may be combined on to the same sheet provided the plan shows all the minimal required information on that sheet for each plan and all information that would be necessary to present a clear unquestionable picture of the site when being reviewed. The information must not create an overly detailed plan making it illegible:

(1) Title area to contain the following:

a. Name of development;

b. Title of plan;

c. Engineering firm name;

d. Date drawn;

e. Numerical scale;

f. Sheet number in set of plans;

g. Revision block area; and

h. Seal and signature of the engineer or surveyor except where a stated exception occurs;

(2) Erosion and sedimentation control plan, the applicant may be exempted from this plan requirement if development is specifically exempted in this ordinance;

(3) Utility plan to include all public water and sewage systems;

(4) Plan and profile of roadways;

(5) Plan and profile of sanitary sewer;

(6) Construction details;

(7) Stormwater management plan;

(8) State DOT permit, if applicable;

(9) Overall watershed drainage;

(10) Approval from the city utilities authority for water and sewer, if applicable; and

(11) Any specifics required for design that are stated elsewhere in this ordinance.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:leesburg/zoning/appendix-c-article-iii-division-1-3.05@2026-11-11-7718d8157e

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Leesburg Zoning Ordinance, Sec. 3.05 (Appendix C, Article III, Division 1). Documentation and/or conditions required for all land development permits | Georgia Commons