(a) In conjunction with the city's review the manager of development services shall refer the application and sedimentation and erosion control plan to the Lower Chattahoochee River Soil and Water Conservation District for its review and approval or denial concerning the adequacy of the erosion and sedimentation control plan. The results of this review shall be forwarded to the city. (b) Maintenance of all soil erosion and sedimentation control practices, whether temporary or permanent, shall be at all times the responsibility of the applicant or his representative. (c) No permit shall be issued by the city unless the erosion and sedimentation control plan has been approved by the Lower Chattahoochee River Soil and Water Conservation District and the manager of development services has affirmatively determined that the plan and any additional documentation are in compliance with this ordinance. (d) Soil erosion and sedimentation control plans shall be prepared to meet the minimum requirements contained in chapter 16, article IV. Conformance with the minimum requirements may be attained through this ordinance and the use of design criteria in the current issue of the Manual for Erosion and Sediment Control in Georgia, published by the state soil and water conservation commission as a guide, or through the use of alternate design criteria that conform to sound conservation and engineering practices. The Manual for Erosion and Sediment Control in Georgia is incorporated by reference into this ordinance. (e) The plans for this activity shall consider the interrelationship of the soil types, geological and hydrological characteristics, topography, watershed, vegetation, proposed permanent structures, including roadways, constructed waterways, sediment control and stormwater management facilities, local ordinances and state laws. (f) The following information is to be included on soil sediment and erosion control plans: (1) Narrative or notes, and other information: notes or narrative to be located on the site plan in general notes or in erosion and sediment control notes. (2) Description of existing land use at the project site and description of the proposed project. (3) Name, address and phone number of property owner. (4) Name and phone number of 24-hour local contact who is responsible for erosion and sedimentation controls. (5) Size of project or phase under construction, in acres. (6) Activity schedule showing anticipated starting and completion dates for the project, including the statement in bold letters, that "The escape of sediment from the site shall be prevented by the installation of erosion and sedimentation control measures and practices prior to or concurrent with land disturbing activities." (7) Stormwater and sedimentation management systems-storage capacity, hydrologic study, and calculations, including off-site drainage area. (8) Vegetative plan for all temporary and permanent vegetative practices, including species, planting dates, seeding, fertilizer, lime and mulching rates. This vegetative plan shall be site specific for appropriate time of the year seeding will take place and for the appropriate geographical region of the state. (9) Detail drawings for all structural practices. Specifications shall follow guidelines set forth in the Manual for Erosion and Sediment Control in Georgia. (10) The following maintenance statement: "Erosion and sedimentation control measures will be maintained at all times. If full implementation of the approved plan does not provide for effective erosion and sedimentation control, additional erosion and sedimentation control measures and practices shall be implemented to control or treat the erosion and/or sediment source." (11) Maps, drawings and supportive computations, which shall bear the signature and/or seal of a registered or certified professional in engineering, architecture, landscape architecture, land surveying, or erosion and sedimentation control. (12) Graphic scale and north point or arrow indicating magnetic north. (13) Vicinity maps showing location of project and existing streets. (14) Boundary line survey. (15) Delineation of disturbed area within the project boundary. (16) Existing contours, with contour lines drawn with an interval in accordance with the following: Map Scale Ground Slope Contour Interval (in feet) Minimum scale is 1 inch = 100 ft. Flat 0—8% 1 Minimum scale is 1 inch = 100 ft. Steep 8% or more 2 (17) Planned contours, with contour lines drawn with a one-foot interval. (18) Adjacent areas and features such as streams, lakes, residential areas, etc., that might be affected. (19) Proposed structures or additions to existing structures and paved areas. (20) Delineate the 100-year floodplain and reference the data used in the determination. (21) Delineate the 25-foot undisturbed vegetative buffer adjacent to state waters and the 35-foot buffer in Metropolitan River Protection Act areas. (22) Location of erosion and sedimentation control measures and practices using coding symbols from the Manual for Erosion and Sediment Control in Georgia, chapter 6. (23) Limits of construction and clearing.