Skip to content
Georgia Commons
Menu

Leesburg · Zoning Ordinance

Appendix C - LAND DEVELOPMENT REGULATIONS / Article III - LAND DEVELOPMENT PERMITS / Division 1 - GENERALLY

Sec. 3.16. Permit work inspections.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) The manager of development services or his designee will periodically inspect the sites for which permits have been issued to determine if the activities are being conducted in accordance with the plan and if the measures required in the plan are effective in controlling erosion and sedimentation.

(b) The manager of development services or his designee shall have access to any permitted work for inspections at any time. When inspection for approval is required, the permit holder shall notify the manager of development services 48 hours in advance. After notification to the manager of development services and expiration of the 48-hour period the work, may proceed with or without inspection. The city reserves the right to require modifications or corrections if the work does not meet the requirements of this ordinance. The following inspections are required:

(1) Any specific items additionally noted at the time the permit is issued;

(2) Potable water construction to include:

a. Flushing;

b. Waterline pressure testing;

c. Chlorination; and

d. Bacteriological water sampling.

(3) Sanitary sewer construction;

(4) Pavement base construction;

(5) Any storm drainage construction underneath a proposed city road; and/or proposed easements.

(6) Any construction in existing city rights-of-way or easements.

(c) The permit holder shall be fully responsible for any construction work. The manager of development services may require any uninspected work required to be inspected to be uncovered for inspection at the sole expense of the applicant. The manager of development services or city council shall in no way be liable for any cost or damages arising from or in any way associated with any delay or inconvenience associated with any work, delay or inconvenience caused by uncovering uninspected work that is required by this ordinance to be inspected.

(d) A request by phone call or letter may schedule a visit to the site by the manager of development services or his designee. The permit holder is responsible for contacting the manager of development services or his designee 48 hours in advance for all required inspections.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:leesburg/zoning/appendix-c-article-iii-division-1-3.16@2026-11-11-9961a92221

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Leesburg Zoning Ordinance, Sec. 3.16 (Appendix C, Article III, Division 1). Permit work inspections | Georgia Commons