--- title: Leesburg Zoning Ordinance, Sec. 3.19 (Appendix C, Article III, Division 2). Permit submission and approval process collection: local-codes id: local-code:leesburg/zoning/appendix-c-article-iii-division-2-3.19 cite_as: Leesburg, Ga., Zoning Ordinance, Appendix C, Article III, Division 2, ยง 3.19 canonical_url: https://georgiacommons.org/code/local/leesburg/zoning/appendix-c-article-iii-division-2-3.19 md_url: https://georgiacommons.org/code/local/leesburg/zoning/appendix-c-article-iii-division-2-3.19.md text_url: https://georgiacommons.org/code/local/leesburg/zoning/appendix-c-article-iii-division-2-3.19/text source_url: https://library.municode.com/ga/leesburg/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:leesburg jurisdiction_name: Leesburg place_fips: "1345768" corpus_version: local-codes-leesburg-12e648c39c4a publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/leesburg/zoning/~appendix-c/~article-iii/~division-2.md previous: https://georgiacommons.org/code/local/leesburg/zoning/appendix-c-article-iii-division-2-3.18.md next: https://georgiacommons.org/code/local/leesburg/zoning/appendix-c-article-iii-division-2-3.20.md index: https://georgiacommons.org/code/local/leesburg.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:leesburg/zoning/appendix-c-article-iii-division-2-3.19@2026-11-11-3b47b578d0 --- # Leesburg Zoning Ordinance, Sec. 3.19 (Appendix C, Article III, Division 2). Permit submission and approval process > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix C - LAND DEVELOPMENT REGULATIONS / Article III - LAND DEVELOPMENT PERMITS / Division 2 - APPLICATION PROCESS (a) The applicant shall submit the required number of copies of the application and all supporting plans and documentation to the manager of development services. The presence of an engineer's or surveyor's seal and signature on the plans shall certify that the submitted plans meet or exceed the standards and specifications of the city. (b) Such permit and required documentation and plans will be distributed by the manager of development services to the reviewing departments. The reviewing departments and the manager of development services shall review all submitted documentation for compliance with this ordinance and other city ordinances and standards. (c) If the plans conform to all requirements, and all payments for plan processing or any traffic control signage and/or any other required moneys or documentation has been received, the manager of development services shall issue a permit authorizing construction. (d) Permits shall be issued or denied as soon as practical but in any event not later than 45 days after receipt by the manager of development services of a completed application, providing variances and bonding are obtained, where necessary. (e) If it is determined by the manager of development services during review that additional information is required, a new 45-day review period begins after the submittal of the requested information. (f) If a permit is denied, the reasons for denial shall be stated in writing to the applicant who may then take corrective action or submit additional information to meet city requirements. (g) Subdivision development requirements are as follows: (1) If the manager of development services through the permit review process requires changes in the construction plans which require a substantial material change in the approved preliminary plat or if between the approval of the preliminary plat and the land development permit application submittal, the developer makes a substantial material change in the approved preliminary plat, an amended preliminary plat shall be provided by the developer and submitted to the planning commission for their review and approval. If the amended preliminary plat is approved by the planning commission the manager of development services shall approve or deny the permit application. (2) Substantial material change is considered to be on the order of: a. Roadway alignment changed to outside the original right-of-way limits; b. Addition of a new roadway; c. Any expansion outside the boundaries of the original preliminary plat limits; and d. Any change the planning director deems as a substantial material change.