Skip to content
Georgia Commons
Menu

Leesburg · Zoning Ordinance

Appendix C - LAND DEVELOPMENT REGULATIONS / Article IX - OFF-STREET PARKING, DRIVES, SERVICE AND OUTDOOR STORAGE AREAS / Division 1 - GENERALLY

Sec. 9.03. Pavement design.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Parking and interior drive pavement shall consist of either asphaltic concrete or Portland cement concrete. The methods and standards used can be found in publications by the Asphalt Institute and AASHTO.

(b) The specifications for construction of off-street parking and service areas within the incorporated areas of the city shall include the latest edition of the state department of transportation's standard specifications for roads and bridges with all appendices.

(c) Minimum design standards are as follows:

(1) Pavement design period shall be 15 years;

(2) Minimum ADT for design purposes are to be determined by traffic counts with a four percent annual growth rate;

(3) The applicant shall provide an engineering study certified by an engineer showing the proposed design to be in compliance with the intent of this article. The engineering study shall include a pavement structural design based on the AASHTO Guide for Design of Pavement Structures, or other design methods and specifications approved by the manager of development services for the materials and construction of the proposed design; and

(4) Minimum pavement design shall have either six inches of Portland cement concrete or an inch asphaltic concrete on six inches of soil cement base with seven percent cement.

(d) To provide proper drainage, the minimum slope of a parking lot shall be 0.5 percent and the maximum slope shall be ten percent.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:leesburg/zoning/appendix-c-article-ix-division-1-9.03@2026-11-11-2521a95b86

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Leesburg Zoning Ordinance, Sec. 9.03 (Appendix C, Article IX, Division 1). Pavement design | Georgia Commons