Every pipe or conduit for water, sewage, gas, drainage, communication or any other use that may be encountered in trenching shall be carefully protected from injury or displacement and all damage caused, as follows: (1) Use all means necessary to protect all materials and existing utilities before, during and after installation and to protect all objects designated to remain. (2) In the event of damage, immediately make all repairs and replacements necessary to the approval of the owner of the structure. All costs associated with repairing the structure shall be paid by the party causing the damage. a. Existing underground facilities. 1. Underground structures and utilities, as indicated, are located according to best available information. 2. Locate all underground facilities in advance of excavation to avoid conflicts with new construction. b. Conflicts. 1. Perform work in such a manner as to cause a minimum of interference with the service rendered by the facility disturbed. 2. Immediately repair or replace structures or facilities damaged. Such structures shall be completely repaired to the satisfaction of the owner of the structure. (3) Restore to condition existing prior to damage in accordance with best standard practices as approved by the property owner, the owner of the structure or the manager of development services. (4) Protect improvements, trees and vegetation on adjoining property as well as those on property requiring route clearing work. (5) Execute work so as not to create a nuisance to persons utilizing adjacent property. (6) Use work methods and provide temporary facilities as necessary to prevent washing, erosion, sedimentation or dust damage, or hazard to persons and property, within and off the work area.