--- title: Leesburg Zoning Ordinance, Sec. 5.05 (Appendix C, Article V, Division 1). Interruption of service collection: local-codes id: local-code:leesburg/zoning/appendix-c-article-v-division-1-5.05 cite_as: Leesburg, Ga., Zoning Ordinance, Appendix C, Article V, Division 1, ยง 5.05 canonical_url: https://georgiacommons.org/code/local/leesburg/zoning/appendix-c-article-v-division-1-5.05 md_url: https://georgiacommons.org/code/local/leesburg/zoning/appendix-c-article-v-division-1-5.05.md text_url: https://georgiacommons.org/code/local/leesburg/zoning/appendix-c-article-v-division-1-5.05/text source_url: https://library.municode.com/ga/leesburg/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:leesburg jurisdiction_name: Leesburg place_fips: "1345768" corpus_version: local-codes-leesburg-12e648c39c4a publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/leesburg/zoning/~appendix-c/~article-v/~division-1.md previous: https://georgiacommons.org/code/local/leesburg/zoning/appendix-c-article-v-division-1-5.04.md next: https://georgiacommons.org/code/local/leesburg/zoning/appendix-c-article-v-division-1-5.06.md index: https://georgiacommons.org/code/local/leesburg.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:leesburg/zoning/appendix-c-article-v-division-1-5.05@2026-11-11-6020a201e8 --- # Leesburg Zoning Ordinance, Sec. 5.05 (Appendix C, Article V, Division 1). Interruption of service > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix C - LAND DEVELOPMENT REGULATIONS / Article V - GENERAL CONSTRUCTION; WORK CONDITIONS / Division 1 - GENERALLY (a) Flow of storm drains maintained. Adequate provisions shall be made for the flow of drains and watercourses encountered during construction, and the structures that may have been disturbed shall be satisfactorily restored upon completion of the work. (b) Interruption of water or sewer service. No valve or other control on the existing system shall be operated for any purpose by the permit holder without approval of the utilities authority. All consumers affected by such operation and the utilities authority shall be notified at least six hours before the operation and advised of the probable time the service will be restored. (c) Utilities and service connection. All existing utilities and service connections shall be protected, maintained and kept in service during construction operations. Any existing utilities cut or damaged shall be repaired immediately and the service restored on the existing lines.