(a) Flow of storm drains maintained. Adequate provisions shall be made for the flow of drains and watercourses encountered during construction, and the structures that may have been disturbed shall be satisfactorily restored upon completion of the work. (b) Interruption of water or sewer service. No valve or other control on the existing system shall be operated for any purpose by the permit holder without approval of the utilities authority. All consumers affected by such operation and the utilities authority shall be notified at least six hours before the operation and advised of the probable time the service will be restored. (c) Utilities and service connection. All existing utilities and service connections shall be protected, maintained and kept in service during construction operations. Any existing utilities cut or damaged shall be repaired immediately and the service restored on the existing lines.