Skip to content
Georgia Commons
Menu

Lilburn · Zoning Ordinance

Lilburn Zoning Ordinance

This document is shown whole, as one text: its source does not cut it into sections.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
  • Read by OCR from a scanned page: a character, a name, or a number may be misread.

Part 3 of 7. This text is long, so its page prints it in parts, in the source's order. A link to one of its paragraphs leads to the part that holds it.

Easement: A non-possessory interest in land; a grant by a property owner for the use by the public, a corporation or persons, of a portion of land for a specified purpose or purposes.

Easement, access: An easement devoted to vehicular access which affords a principal means of access to abutting property or properties, but which is not necessarily open to the general public and which is not necessarily improved to standards of the city.

Elevation drawing: An architectural drawing of a building or building façade, intended to illustrate its design, characteristics and

major features.

Esthetician: Defined as any licensed individual who performs any one of the following: massages the face or the neck, massages the arms or the décolletage, trims/ tweezes the eyebrows, dyes eyelashes or eyebrows, applies eyelash extensions, or waxes the face, neck, arms, torso, or legs of an individual.

Exterminator: An establishment engaged in pest control for businesses, institutions, residences, or industries. Such a use is a business service establishment.

Extractive industry: Removal or recovery by any means whatsoever of sand, gravel, soil, rock, minerals, mineral substances or organic substances other than vegetation, from water or land on or beneath the surface thereof, exposed or submerged. This term includes gravel pits, mines, quarries, and similar operations.

Façade: The face (exterior elevation) of a building, especially the face parallel to or most nearly parallel to a public street.

Family: One or more persons related by blood, marriage, adoption, or guardianship;

or not more than four persons not so related who live together in a dwelling unit as a single housekeeping unit under a common housekeeping management plan based on an intentionally structured relationship providing organization and stability; or not more than two unrelated persons and any minor children related to either of them.

Family day care home: A private residence in which a business, registered by the State of Georgia, is operated by any person who receives therein (for pay) for supervision and care for fewer than 24 hours per day, not more than six persons who are not residents in the same private residence. For purposes of this Zoning Ordinance, a family day care home may be operated as a home occupation, subject to the requirements of this Zoning Ordinance.

Fee simple: A form of ownership where the owner is entitled to the entire property with unconditional power of disposition during End Elevation - Unit his or her life and which descends to his or her heirs and legal representatives upon his or her death intestate.

Fence: An enclosure or barrier, composed of wood, masonry, stone, wire, iron, or other materials or combination of materials used as a boundary, means of protection, privacy screening, or confinement, including brick or concrete walls but not including hedges, shrubs, trees, or other natural growth.

Fence, barbed wire: One or more strands of wire or other material having intermittent sharp points of wire or metal that may puncture, cut, tear, or snag persons, clothing, or animals, including vertical supports.

Fence, chain-link: An open mesh fence made entirely of wire woven in squares of approximately 1.5 inches with vertical supports.

Fence, decorative: An ornamental fence made of materials that are decorative in nature. Decorative materials include, but may not be limited to brick, stone, stucco, wood, picket, split rail, wrought iron, or similar materials.

Fence, solid: A fence, including entrance and exit gates where access openings appear, through which no visual images can be seen.

Finance, insurance, and real estate establishment: Such uses include but are not limited to banks, savings and loan institutions and credit unions, security and commodity exchanges, insurance agents, brokers, and service, real estate brokers, agents,

managers, and developers, trusts, and holding and investment companies.

Flea market: The use of land, structures or buildings for the sale of produce or goods, usually second-hand or cut-rate. A flea market is considered an open air business.

Forestry: An operation involved in the growing, conserving, and managing of forests and forest lands. Forestry operations or practices include the raising and harvesting of timber, pulp woods and other forestry products for commercial purposes, the construction of roads, insect and disease control, fire protection, and may include the temporary operation of a sawmill and/or chipper to process the timber cut from the parcel or parcels. This term does not include the cutting of timber associated with approved land development.

Funeral home: A building used for human funeral services. Such building contains a chapel and may include space and facilities for embalming and the performance of other services used in the preparation of the dead for burial or cremation, the performance of autopsies and other surgical procedures, the indoor storage of caskets, funeral urns, and other related funeral supplies, and/or the indoor storage of funeral vehicles.

Gable: The triangular upper portion of an end wall, underneath a peaked roof.

Gas tank sales: The retail sale of bulk storage tanks for flammable and combustible liquids, compressed gases or liquefied petroleum (LP) gas. Gas tank sales are considered open air business uses.

Grade, finished: The final elevation and contour of the ground after cutting or filling and conforming to the proposed design.

Grading: Altering the shape of ground surfaces to a predetermined condition; this includes stripping, cutting, filling, stockpiling and shaping or any combination thereof and shall include the land in its cut or filled

condition.

Greenhouse: A building designed or used for growing or propagating plants, with walls or roof usually designed to transmit light.

Group home: A single housekeeping unit of more than six unrelated persons, whether or not they are developmentally disabled.

See also community living arrangement.

Guest house: A lodging unit for temporary guests in an accessory building. No guest house shall be rented or otherwise used as a separate dwelling.

Harmony: A quality that represents an attractive arrangement and agreement of parts of a composition, as in architectural elements.

Hazardous waste: Any solid waste which has been defined as a hazardous waste in regulations, promulgated by the government of the United States or the State of Georgia.

Health spa: An establishment which for profit or gain provides as one of its primary purposes, services or facilities which are purported to assist patrons improve their physical condition or appearance through change in weight, weight control, treatment, dieting, or exercise. The term includes establishments designated as "reducing salons," "exercise gyms," "health studios," "health clubs," "fitness studios," and other terms of similar import. Not included within this definition are facilities operated by nonprofit organizations, facilities wholly owned and operated by a licensed physician at which such physician is engaged in the practice of medicine, or any establishment operated by a health care facility, hospital, intermediate care facility, or skilled nursing care facility.

Hedge: A row of closely planted shrubs, bushes, or any kind of plant forming a boundary.

Helicopter landing pad: Any structure or area which is designed or constructed for use, or used, as a helicopter landing area or any structure or area which is used as a helicopter landing area.

Home occupation: Any use, occupation or activity conducted on the same site as a dwelling which is clearly incidental and secondary to the use of the dwelling for residence purposes and does not change the character thereof, as may be lawfully established under the terms of this Zoning Ordinance.

Hospital: An institution licensed by the state and providing primary health services and medical or surgical care to persons, primarily in-patients, suffering from illness, disease, injury, deformity or other abnormal physical or mental conditions, and including as an integral part of the institution, such related facilities as laboratories, outpatient facilities, or training facilities.

Hotel: A commercial lodging service with one or more buildings devoted to the temporary shelter for the traveling public, and where entry to individual guest rooms is via a central lobby. A hotel is a lodging service for purposes of this Zoning Ordinance.

Household: A family, as defined herein, or a group of not more than four persons, including developmentally disabled persons and their caretakers, who need not be related by blood, marriage, or guardianship, living together in a dwelling unit as single housekeeping unit.

Impact: The effect of any direct man-made actions or indirect repercussions of manmade actions on existing physical, social, or economic conditions.

Impervious surface: A man-made structure or surface, which prevents the infiltration of water into the ground below the structure or surface. Examples are buildings, structures, roads, driveways, parking lots, decks, swimming pools, and patios.

Improvements: The physical additions and changes to land that may be necessary to produce usable, desirable and acceptable lots or building sites.

Incinerator: A facility with equipment that uses a thermal combustion process to destroy or alter the character or composition of medical waste, sludge, soil, or municipal solid waste, not including animal or human remains.

Institutional residential living and care facilities: An umbrella term that encompasses the following uses as specifically defined in this ordinance: assisted living facility, intermediate care home, nursing home, skilled nursing care facility, and personal care home.

Intermediate care home: A facility which admits residents on medical referral; it maintains the services and facilities for institutional care and has an agreement with a physician and dentist who will provide continuing supervision including emergencies; it complies with rules and regulations of the Georgia Department of Human

Resources or state agency with jurisdiction as may be reorganized. The term "intermediate care" means the provision of food, including special diets when required, shelter, laundry and personal care services, such as

help with dressing, getting in and out of bed, bathing, feeding, medications and similar assistance, such services being under appropriate licensed supervision. Intermediate care does not normally include providing care for bed patients except on an emergency

or temporary basis.

Janitorial/cleaning service establishments means primarily engaged in cleaning building interiors, windows, carpets, and upholstery, and in cleaning and maintaining

factories, offices, apartments, and other business and institutional buildings.

Junk: Scrap or waste material of any kind or nature collected for resale, disposal, or storage, or by accumulation.

Kennel: An establishment in which dogs or domesticated animals are housed, groomed, bred, boarded, trained, or sold, all for a fee or compensation.

Kennel, private: The keeping, breeding, raising, showing, or training of four or more dogs over six months of age for personal enjoyment of the owner or occupant of the property.

Kitchen: Any room or part of a room designed, built, used, or intended to be used for cooking, the preparation of food, or dishwashing. The presence of a range, oven, or dishwasher, or utility connections suitable

for serving a range or oven, shall normally be considered as establishing a kitchen.

Land-disturbing activity: Any activity which may result in soil erosion from water or wind and the movement of sediments into state waters or onto lands within the state, including, but not limited to, clearing, dredging, grading, excavating, transporting, and filling of land but not including practices

specifically exempt from the city's soil erosion, sedimentation, and pollution control ordinance unless the context clearly indicates

otherwise.

Landfill, construction and demolition: A disposal facility accepting waste building materials and rubble resulting from construction, remodeling, repair and demolition operations on pavements, houses, commercial buildings, and other structures. Such wastes

include, but are not limited to, asbestos containing waste, wood, bricks, metal, concrete, wall board, paper, cardboard, inert waste landfill material and other inert wastes which have a low potential for groundwater contamination.

Landfill, inert waste: A disposal facility accepting only wastes that will not or are not likely to cause production of leachate of environmental concern. Such wastes are limited to earth and earth-like products, concrete, cured asphalt, rock, bricks, yard trimmings, stumps, limbs, and leaves, and specifically excluding industrial and demolition waste.

Landfill, sanitary: The burial of nonhazardous waste where such waste is covered on a daily basis, as distinguished from a construction and demolition landfill.

Landscape strip: An area of landscaping of specified width.

Landscaping: The modification of the landscape for an aesthetic or functional purpose. The area within the boundaries of an individual lot that includes the preservation of existing vegetation and the continued maintenance thereof, as well as, the installation of trees, shrubs, ground covers, grass, and flowers. Landscaping areas may also

include decorative rock, bark, mulch and other similar approved materials in addition to vegetation and live plant material.

Landscaping company: A business engaged in the provision of landscaping services and/or the wholesale or retail sale of landscaping products including but not limited to sod, trees, landscaping timbers, and earth covering materials. The processing of wood into timbers, mulch, and/or chips is considered

an incidental use of a landscaping company whose primary purpose is the wholesale or retail sale of landscaping products.

Laundromat: A facility where patrons wash, dry, or dry clean clothing or other fabrics in machines operated by the patron.

A laundromat is considered a personal service establishment.

Lighting, neon outline: Outline lighting formed in whole or part with neon.

Live-work unit: Buildings or spaces within buildings that are used jointly for commercial and residential purposes where the two uses are physically connected in one

unit and residential use of the space is accessory to the primary use as a place of work. This term is distinguished from a home occupation and from a mixed-use building. Live-work units may have larger work spaces than permitted by home occupation,

and live/work units design the floor space for both living and working areas. Livework units are distinguished from mixeduse buildings in that a mixed-use building has residential and nonresidential uses in

the same building, but the residential and nonresidential spaces are not necessarily connected or used by the same person.

Livestock: Cattle, horses, pigs, sheep, goats, llamas, emus, ostriches, donkeys, mules, goats, sheep, chickens, ducks, geese, and other fowl, rabbits, minks, foxes and other fur or hide-bearing animals, customarily bred or raised in captivity, whether owned or board, whether kept for pleasure, utility, or sale.

Lodging service: A facility that offers temporary shelter accommodations, or place for such shelter, open to the public for a fee, including "hotels" and "motels." "Bed and breakfast inn" is defined separately and is not considered a lodging service for purposes of this Zoning Ordinance.

Lot: A parcel of land occupied or capable of being occupied by a use, building or group of buildings devoted to a common use, together with the customary accessories and open spaces belonging to the same. The word "lot" includes the word "plot" or "parcel."

Lot, corner: A lot abutting upon two or more streets at their intersection.

Lot, double frontage: Any lot, other than a corner lot, which has frontage on two streets.

Lot, flag: A tract or lot of land of uneven dimensions in which the portion fronting on a street is less than the required minimum width required for construction of a building or structure on that lot.

Lot area, minimum: Minimum lot area means the smallest permitted total horizontal area within the lot lines of a lot, exclusive of street and alley rights-of-way but inclusive of easements.

Lot depth: The mean horizontal distance between front and rear lot lines.

Lot frontage: The width in linear feet of a lot where it abuts the right-of-way of any street.

Lot width: The distance between side lot lines measured at the front building line.

Lot of record: A lot which is part of a subdivision, a plat of which has been lawfully recorded in the records of the Clerk of Superior Court of Gwinnett County; or a

parcel of land, the deed of which has been lawfully recorded in the same office as of the effective date of this Zoning Ordinance.

Lumber yard: A facility where wood materials such as lumber, plywood, panels or other wood products are processed and sold for

retail sale or wholesale. Such use may involve performing millwork, planing, cutting, and/or other customizing processes.

Manufactured home: Any dwelling unit designed and constructed in compliance with the Georgia State Minimum Standard One and Two Family Dwelling Code which is wholly or in substantial part, made, fabricated, formed, or assembled in a manufacturing facility and cannot be inspected at the installation site without disassembly, damage to, or destruction thereof. Any such structure shall not contain a permanent metal chassis and shall be affixed to a permanent load-bearing foundation. The term shall not include manufactured homes as defined by the National

Manufactured Housing Construction and Safety Standards Act of 1974, 42 U.S.C.

Section 32 5401, et seq.

Types of Lots Lot Definitions Manufacturing, processing, assembling:

The mechanical or chemical transformation of materials or substances into new products.

The land uses engaged in these activities are usually described as plants, factories or mills and characteristically use powerdriven machines and materials handling equipment. Establishments engaged in

assembling component parts of manufactured products are also considered under this definition if the new product is neither a fixed structure nor other fixed improvement. Also

included is the blending of materials such as lubricating oils, plastic resins, or liquors.

Marquee: A roofed structure attached to and supported by a building and projecting over public or private sidewalks or rights-ofway.

Massing: The overall visual impact of a structure's volume; a combination of height and width and the relationship of the heights and widths of the building's components.

Materials recovery facility: A solid waste handling facility that provides for the extraction from solid waste of recoverable material, materials suitable for use as a fuel or soil amendment, or any combination of such

materials.

Metes and bounds: A system of describing and identifying land by a series of lines around the perimeter of an area; "metes" means bearings and distances and "bounds" refers to physical monuments.

Microbrewery: A small, usually independently owned brewery that produces limited quantities of specialized beers, predominantly for localized distribution, often serving them on the premises in association with food services.

Mini-warehouse: (see self-service storage facility).

Mobile food vending: To peddle, vend, sell, display, or offer for sale or give away food and/or non-alcoholic beverages from a mobile food vending unit parked or located on a private parcel of property.

Mobile food vending unit: A motor vehicle, cart, trailer, tent, table, or other temporary structure that is readily moveable and that is designed and equipped to prepare and serve food as designed by state law and in accordance with the rules and regulations for food service of the Gwinnett, Newton, and Rockdale County Board of Health. Food trucks may not exceed 26 inches in length, and pushcarts may not exceed a maximum size of five feet by ten feet.

Mobile home: A structure, transportable in one or more sections, which, in the traveling mode, is eight-body feet or more in width or 40-body feet or more in length, when

erected on site, is 320 or more square feet in floor area, and which is built on a permanent chassis and designed to be used as a dwelling with or without a permanent foundation when connected to the required utilities,

and includes the plumbing, heating, airconditioning, and electrical systems contained therein; and manufactured prior to June 15,

1976. Mobile homes are not allowable as permanent residences in the city.

Model home: A dwelling temporarily used as a sales office or demonstration home for a residential development under construction, said dwelling being used as an example of a product offered for sale to purchasers (by a realtor, building developer, or contractor).

The dwelling may be furnished but is not occupied as a residence while being used as a model home.

Modular building unit: Any building of closed construction, regardless of type of construction or occupancy classification, other than a mobile or manufactured home, constructed off-site in accordance with the current International Building Code Certification and transported to its ultimate site from the factory and assembled on a

permanent foundation. Modular homes may consist of one or more stories. A copy of the Current International Building Code Compliance report must be reviewed before installation.

Motel: A commercial lodging service with one or more buildings devoted to the temporary shelter for the traveling public, and where entry to individual guest rooms is via the exterior of the building rather than through a central lobby.

Museum: A building having public significance by reason of its architecture or former use or occupancy, or a building serving as a repository for a collection of natural, scientific, literary curiosities or objects of

interest, or works of art, and arranged, intended, and designed to be viewed by members of the public with or without an admission fee, and which may include as an accessory use the sale of snacks and goods to the public as gifts or for their own use.

Natural drainage: Channels formed by the existing surface topography of the earth prior to changes made by unnatural causes.

Nonconforming building or structure: A building or structure, which may be principal or accessory, that does not meet one or more applicable setbacks for the zoning district in which said building or structure is located, or a building or structure that exceeds the maximum height or building coverage for the zoning district in which said building or structure is located, or a building or structure that otherwise does not comply with dimensional requirements established by this Zoning Ordinance for the particular principal building or accessory structure or for the zoning district in which the nonconforming building or structure is located.

Nonconforming lot: A lot which does not conform to the minimum lot frontage requirements of this chapter and/or the minimum lot size and minimum lot width requirements of the zoning district in which the lot is located as established by this chapter but

which was a lot of record prior to the effective date of this Zoning Ordinance or its amendment.

Nonconforming situation: Any development, land improvement, or activity, not otherwise included within the definition of

nonconforming lot, nonconforming building or structure, nonconforming use, or nonconforming sign which does not meet the provisions of this chapter at the time of its adoption or amendment. Examples of nonconforming situations include but are not limited to, noncompliance with off-street parking regulations or access requirements, failure to adhere to landscape strip requirements, tree protection, and insufficient landscaping requirements.

Nonconforming use: Any building or use of land or building lawfully existing on or before the effective date of this Zoning Ordinance or as a result of subsequent amendments to this Zoning Ordinance, which does not conform to the use provisions of the zoning district in which it is located.

Nursery or kindergarten school: Any building used routinely for the daytime care or education of preschool age children and

including all normal accessory and play areas. For purpose of this Zoning Ordinance, a nursery or kindergarten school is considered to be a day care center.

Nursing home: A facility which admits patients on medical referral only and for whom arrangements have been made for continuous medical supervision; it maintains the services and facilities for skilled nursing care, rehabilitative nursing care, and has an agreement with a physician and dentist who will be available for any medical and/or dental emergency and who will be responsible for the general medical and dental superviArt. 14 LILBURN CODE sion of the patients; it complies with rules

and regulations of the Georgia Department of Human Resources or state agency with jurisdiction as may be reorganized.

Office: A building or portion thereof wherein services are performed involving predominantly administrative, professional or clerical operations and not involving retail sales or other sales of any kind on the premises.

Office/warehouse: A building that combines office and warehouse or storage functions, where the majority of the area of the building is devoted to warehouse or storage functions, and which does not involve retail sales.

Opaque: Impenetrable to view, or so obscuring to view that features, buildings, structures, and uses become visually

indistinguishable.

Open air business: Any commercial establishment with the principal use of displaying products in an area exposed to open air on three or more sides, including but not limited to rock yards, nurseries and garden centers and garden supply stores, lumber and building materials yards, flea markets, statuaries and monument sales establishments, liquid petroleum dealers and tank sales. A roadside stand is not considered to be an open air business.

Open space: Land and water areas retained for use as passive recreation areas or for resource protection or conservation in an essentially undeveloped state.

Open space, landscaped: That portion of a given lot, not covered by buildings, parking, access and service areas, that is designed to enhance privacy and the amenity of the development by providing landscaping features, screening and buffering for the benefit of the occupants or those in neighboring areas, or a general appearance of openness. Landscaped open space may include, but need not be limited to, grass lawns,

decorative planting, berms, walls and fences, ornamental objects such as fountains, statues and other similar natural and man-made objects, wooded areas, and water courses, any or all of which are designed and arranged to produce an aesthetically pleasing effect within the development.

Overlay district: A defined geographic area that encompasses one or more underlying zoning districts and that imposes additional requirements above those required by the underlying zoning district. An overlay district can be coterminous with existing zoning districts or contain only parts of one or more such districts.

Outdoor storage: The keeping of any goods, junk, material, merchandise or commercial vehicles in the same outdoor place for more than 24 hours.

Parapet: That portion of a wall which extends above the roof line.

Parking space: An area having dimensions of not less than 300 square feet, including driveway and maneuvering area,

to be used as a temporary storage space for a private motor vehicle.

Parking structure: A structure or portion thereof composed of one or more fully or partially enclosed levels or floors used for the parking or storage of motor vehicles.

This definition includes parking garages, deck parking, and underground parking areas under buildings.

Pedestrian-scale development: Development designed with an emphasis primarily on the street sidewalk and on pedestrian

access to the site and building, rather than auto access and parking areas. The building is generally placed close to the street and the main entrance is oriented to the street sidewalk. In the case of pedestrian retail districts, there are generally windows or display cases along building façades which face the street.

Permit: The authorization necessary to conduct an activity under the provisions of this Zoning Ordinance.

Permit, development: An official authorization issued by the department in accordance with this Zoning Ordinance to proceed with

land disturbance and grading and site development, as set forth in this Zoning Ordinance. A development permit is separate from, but coordinated with the land disturbance permit required by Lilburn City Code (soil erosion, sediment, and pollution control). A development permit may be required even when a land disturbance permit is not required.

Person: Includes a firm, association, joint venture, organization, partnership, corporation, trust and company as well as an individual.

Personal care home: Any dwelling, whether operated for profit or not, which undertakes through its ownership or management to provide or arrange for the provision of housing, food service, and one or more personal services for two or more adults who are not

related to the owner or administrator by blood or marriage. Personal care tasks include assistance with bathing, toileting, grooming, shaving, dental care, dressing, and eating.

Personal/in-home care: Refers to services provided in a residence, to an adult who needs assistance with essential activities of daily living, such as eating, bathing, grooming, dressing, toileting, ambulation, transferring, and supervision or assistance with self-administered medication. These services

are non-medical and do not include medical or nursing care, except as authorized by waivers in state regulations.

Personal service establishment: A facility engaged in the provision of services to persons and their apparel, including but not limited to barber and beauty shops, coin-operated laundromats, full service laundries, dry cleaners, photographic studios, shoe repair and shoeshine shops, travel agencies, massage

parlors, escort services, fortune-telling, psychics, clothing or costume rental, dating service, hair removal or replacement, or tanning salon.

Pervious pavers: A range of materials and techniques for paving roads and parking lots that which allow the movement of water and air around the paving material.

Pet, household: Any animal other than livestock or wild animals, which is kept for pleasure and not sale, which is an animal of a species customarily bred and raised to live in the habitat of residential dwellings or on the premises thereof and is dependent upon residents of the dwelling for food and shelter.

Household pets include but are not limited to dogs, cats, rodents, common cage birds, aquarium-kept fish, Purebred Vietnamese Pot Bellied pigs, and small amphibians and reptiles.

Plan, concept: A graphic drawn to an engineering scale and submitted with an application for a rezoning, zoning amendment, annexation, or other type of application upon which the applicant has shown the intended development and its design.

Approval of such an application containing a concept plan does not constitute approval of the concept plan in terms of authorizing development or building, which is subject to development and building permitting.

Plan, site: A drawing of a residential, institutional, office, commercial, or industrial development, showing the general layout of a proposed development including, among other features, the location of existing streams, existing and proposed roads and driveways, buildings, parking areas, and open spaces or landscaped open spaces. The site plan is the basis for the approval or disapproval of the general layout of a development in the case of a multiple-family residential, institutional, office, commercial,

or industrial development. The site plan drawn to an engineering scale and is distinguished from a concept plan which is submitted with zoning and special use applications.

Planning commission: The City of Lilburn Planning Commission.

Planning director: See "Director".

Porch: A projection from a building wall which is covered but enclosed on all sides by a vertical wall.

Portico: An exterior appendage to a building, normally at the entry, usually roofed.

Recreational vehicle: A vehicular type unit primarily designed as temporary living quarters for recreational, camping or travel use, which either has its own motive power or is mounted or drawn by another vehicle.

This term includes motorized homes, motorized campers, pick-up campers, travel trailers, camping trailers, and tent trailers, among others.

Recovered materials: Materials which have known use, reuse, or recycling potential; can be feasibly used, reused or recycled; and have been diverted or removed from the solid waste stream for sale, use, reuse, or recycling, whether or not requiring subsequent separation and processing.

Recovered materials processing: Any lot, land, structure, or facility, or part thereof, utilized for the purpose of collecting, sorting, processing for resale, and transport of materials to be recycled or reused, including:

plastics, glass, paper, aluminum and scrap metals. Recovered materials processing does not include any operation which includes dismantling, or changes the nature of a material, its chemical composition or its physical qualities.

Relocated residential structure: A detached, single-family dwelling, site-built (i.e., excluding a manufactured home or mobile home) that is moved or disassembled into more

than one structure and moved to another site, whether temporarily or permanently.

Religious assemblies: A site or facility maintained by a bona fide religious group for the primary purposes of religious worship, study, prayer, or other religious practices of such religious group. Religious assemblies

include but are not limited to churches, temples, mosques, synagogues, and retreat centers.

Research laboratory: A facility for scientific laboratory research in technology-intensive fields, including but not limited to biotechnology, pharmaceuticals, genetics, plastics, polymers, resins, coatings, fibers, fabrics,

films, heat transfer, and radiation research facilities, computer software, information systems, communication systems, transportation, geographic information systems, multimedia and video technology. Also included in this definition are facilities devoted to the

analysis of natural resources, medical resources, and manufactured materials, including environmental laboratories for the analysis of air, water, and soil; medical or veterinary laboratories for the analysis of blood, tissue, or other human medical or animal products; and forensic laboratories for analysis of evidence in support of law enforcement agencies.

Restaurant: Any establishment in which the principal business is the sale of foods and beverages to customers in a ready-toconsume state, and in which customers are served their food and/or beverages by a

restaurant employee at the same table or counter at which the items are consumed, or customers are served their food and/or beverages by means of a cafeteria-type operation where the food or beverages are consumed

within the restaurant building. This term includes taverns, bars, pubs, and sidewalk cafes.

Restaurant, drive-through: Any establishment in which the principal business is the sale of foods and beverages to customers in a

ready-to-consume state and in which the principal or accessory method of operation of all or any portion of the business is to allow food or beverages to be served directly to the customer in a motor vehicle without the need for the customer to exit the motor vehicle.

Retail trade establishment, enclosed: Any business offering goods and products for sale to the public, which may include the incidental repair of such goods and products, that operates entirely within a structure containing a roof and walls on all sides, except for outdoor display or other use during business hours and accessory storage in enclosed, subordinate buildings. These include but are not limited to the following:

convenience stores including the sale of gasoline, hardware, paint, glass and wallpaper stores, grocery and miscellaneous food stores including retail bakeries, apparel, shoe, and accessory clothing stores, furniture, upholstery, floor covering, household appliance and home furnishing stores, musical instrument stores, radio, television, and

computer stores, record, tape, and compact disc stores, eating and drinking places not involving drive-in or drive-through facilities, drug stores, apothecaries and proprietary stores, liquor stores and bottle shops, used

merchandise stores and pawn shops, sporting goods stores and bicycle shops, art and stationery stores, hobby, toy, and game shops,

jewelry, gift, novelty, souvenir and antique shops, camera and photographic supply stores, luggage and leather goods stores, sewing, needlework, and piece goods stores, catalogue and mail order stores, news stands, florists, tobacco shops, automotive parts stores not involving repair, video rental and sales stores, and watch and clock sales and repair shops.

Retaining wall: A wall or similar structure used at a grade change to hold soil on the up-hillside from slumping, sliding, or falling.

Retention: The permanent maintenance of storm water on-site.

Retention pond: A pond or pool used for the permanent storage of storm water runoff.

Rezoning: An amendment to the official zoning map, or an amendment to an overlay zone boundary, that changes the zoning district or overlay zone of one or more properties specified in an application.

Right-of-way, public: That area, distinguished from an easement or private road right-of-way, which is owned in feesimple title by the city or other government, for the present or future use of alleys, roads

and highways, together with any drainage facilities and other improved ancillary structures.

Road: A state highway, a county road, a road adopted as a county-owned right-ofway approved for county maintenance, a street owned and/or maintained by a

municipality, a street approved for city maintenance, or where permitted, a private road. Roads afford the principal means of access to abutting property or properties.

The term includes "street" but does not include "access easement."

Road, private: An improved road, distinguished from a public road in that the right-of-way which affords a principal means of access to abutting property or properties is privately owned and maintained.

Roadside stand: A use offering either farm-grown, prepared food products such as fruits, vegetables, canned foods, or similar agricultural products for sale on the premises within or without a temporary structure on the premises with no space for customers within the structure itself. Term includes produce stands.

Roof: The cover of a building, including the eaves and similar projections.

Roof, flat: A roof having no pitch or a pitch of not more than 2:12 (one foot of rise for each six feet of horizontal distance.

Roof, pitched: A shed, gabled, or hipped roof having a slope or pitch greater than 2:12.

Salvage yard: A place of business primarily engaged in the storage, sale, dismantling or other processing of uses or waste materials which are not intended for reuse in their original forms. Typical uses include paper

and metal salvage yards, used tire storage yards, or retail and/or wholesale sales of used automobile parts and supplies. This term includes junk yards.

Sidewalk: A hard-surfaced pedestrian access area adjacent to or within the rightof-way of a public road or private road.

Sawmill: A facility where logs or partially processed wood are sawn, split, shaved, stripped, chipped, or otherwise processed to produce wood products. This term does not apply to the processing of timber for use on the same lot by the owner or occupant of that lot.

School for the arts: An educational use not operated by the Gwinnett County Board of Education that offers or provides instruction to more than two students at a time in dance, singing, music, painting, sculpting, fine arts, or martial arts.

School, private, elementary, middle, or high: An educational use for students in grades one through 12 or for only certain ranges of grades one through 12, not operated by the Gwinnett County Board of Education, which has a curriculum at least equal to a public school with regard to the branches

of learning and study required to be taught in the public schools of the state of Georgia.

School, public: An educational use for students in grades one through 12 or for only certain ranges of grades one through 12, operated by the Gwinnett County Board of Education.

School, special: An educational use not operated by the Gwinnett County Board of Education that provides special education to more than two students at a time, including but not limited to the training of gifted, learning disabled, and mentally or physically handicapped persons.

School, trade: An educational use not operated by the Gwinnett County Board of Education and having a curriculum devoted primarily to business (including barbers and beauticians), industry, trade, or other vocational-technical instruction.

Self-service storage facility: Miniwarehouse; A structure, building or group of buildings divided into separate compartments, spaces, or stalls, which may be of different sizes and which may or may not be

climate controlled, and which are leased or rented on an individual basis to businesses and residents for temporary storage needs, but where no commercial transactions or activities take place other than the rental of the storage units for exclusively storage purposes.

Service and fuel filling station: Any building, structure or land use for the retail sale of motor vehicle fuel and oil accessories, and

which may include the servicing of motor vehicle, except that major repairs, body repairs and painting of motor vehicles shall not be considered servicing of motor vehicles.

Short-Term Rental: An accommodation for transient guests where, in exchange for compensation, a residential dwelling is rented in whole or in part for lodging for a period of time not to exceed 30 consecutive days. Such use may or may not include an on-site manager. For purposes of this definition, a residential dwelling shall include all housing types and shall not include group living or other lodging uses.

Showroom: A principal or accessory use where wholesale or retail goods are displayed.

Sight visibility triangle: The areas at the corners of an intersection of two streets, or at an intersection of a street and driveway, that must be kept free of shrubs, ground covers, berms, fences, structures, or other materials or items that would obstruct views at heights between 30 inches to 12 feet as measured from the ground.

Slaughterhouse: A facility for the slaughtering and processing of animals and the refinement of their byproducts. This term includes rendering plants.

Skilled nursing care facility: A facility which admits residents on medical referral;

it maintains the services and facilities for skilled nursing care and has an agreement with a physician and dentist who will provide continuing supervision including emergencies; it complies with rules and regulations of the Georgia Department of Human

Resources or state agency with jurisdiction as may be reorganized. The term "skilled nursing care" means the application of recognized nursing methods, procedures, and actions directed toward implementation of the physician's therapeutic and diagnostic plan, detection of changes in the human body's regulatory system, preservation of such body defenses, prevention of complications and emotional well-being.

Solid waste transfer facility: A fixed facility where solid waste from collection vehicles is consolidated and temporarily stored for

subsequent transport to a permanent disposal site.

Special event facility: A facility or assembly hall available for lease by private parties or special events such as weddings. This term includes wedding chapels.

Street furniture: Those features associated with a street that are intended to enhance the street's physical character and

use by pedestrians, such as benches, trash receptacles, planting containers, pedestrian lighting, kiosks, etc.

Streetscape: An area that may either abut or be contained within a public or private street right-of-way or access way that may contain sidewalks, street furniture, trees and landscaping, and similar features.

Streetscape also includes the visual image of a street, including the combination of buildings, parking, signs, and hardscapes.

Structure: Anything built, constructed or erected, or established or composed of parts joined together in some definite manner, the use of which requires location on the ground or which is attached to something having permanent location on the ground. For purposes of this Zoning Ordinance, swimming pools, and tennis courts, are considered structures. Tents, vehicles, trailers, and play

equipment attached to the ground in some permanent or temporary way shall be considered structures. A structure may or may not be easily moved from a given location on the ground. Walls and fences are considered structures.

Subdivision: The division of a tract or parcel of land into two or more lots, building sites, lease lots, or other divisions for the purpose, whether immediate or future, of sale, lease, legacy, or building development.

The term shall include the opening of a new road, a change in existing roads, or divisions of land involving the extension of water, sewer, or gas lines. The term includes resubdivision and, where appropriate to the context, relates to the process of subdivision

or to the land or area subdivided.

Substantial accordance: Strong, yet not precise, conformity such that an ordinary person would conclude that all essential elements are met.

Taxi-cab or limousine service: Any place used to dispatch motor vehicles with drivers for hire.

Tow service: An establishment that dispatches towing vehicles and which provides for the temporary storage of vehicles but does not include disposal, disassembly, salvage, or accessory storage of inoperable vehicles. This term is distinguished from "wrecked motor vehicle compound" and "salvage yard" as defined herein.

Townhouse: One of a group of three or more single-family, attached dwelling units under fee simple ownership.

Trail: A way designed for and used by equestrians, pedestrians, and/or cyclists using non-motorized bicycles.

Trash enclosure: An accessory use of a site where trash and/or recyclable material containers, or any other type of waste or refuse container is stored.

Truck stop: An establishment engaged primarily in the fueling, servicing, repair, or parking of tractor trucks or similar heavy commercial vehicles, including the sale of accessories and equipment for such vehicles.

A truck stop may also include overnight accommodations, showers, or restaurant facilities primarily for the use of truck drivers.

Use, accessory: A use of land subordinate to the principal building or use on a lot for purposes incidental and related to the principal building or use and located on the same lot therewith.

Use, conditional: A use that would not be appropriate generally or without restriction throughout a particular zoning district and is not automatically permitted by right within said zoning district, but which, if controlled as to number, area, location, relation to the neighborhood or other pertinent considerations, may be found to be compatible and approved by the Lilburn City Council after review and recommendation by the

Lilburn Planning Commission within that particular zoning district as provided in certain instances by this Zoning Ordinance.

An approved conditional use runs with the property.

Use, permitted: A use by right which is specifically authorized in a particular zoning district.

Use, public: Any building, structure, or use owned and/or operated by the federal government, state of Georgia, Gwinnett County or other County, a municipality or any authority, agency, board, or commission of the above governments, that is necessary to serve a public purpose, such as but not limited to the following: government administrative buildings, post offices, police and fire stations, libraries and publicly operated museums, public health facilities and public hospitals, public works camps, parks

Townhouses (Attached SingleFamily Fee Simple) and community centers, public roads and streets, water and sanitary sewerage intake, collection, pumping, treatment, and storage facilities, emergency medical facilities, and jails and correctional facilities.

Use, temporary: A use or structure is in place for only a short period of time.

Used: The word "used" as applied to any land or building shall be construed to include the words "intended, arranged, or designed to be used or occupied."

Variance: A grant of relief from the requirements of this Zoning Ordinance which permits construction or use in a matter otherwise

prohibited by this Zoning Ordinance; A minimal relaxation or modification of the strict terms of the height, area, placement, setback, yard, buffer, landscape strip, parking and loading, or other regulations which are dimensional in nature as applied to

specific property when, because of particular physical surroundings, shape, or topographical condition of the property, compliance would result in a particular hardship or

practical difficulty upon the owner, as distinguished from a mere inconvenience or a desire to make a profit.

Variance, administrative: A variance which is authorized to be approved by the director the terms of this Zoning Ordinance.

Vehicle emission testing facility: A building, structure, or use which is specifically designed to test the vehicle emissions of

vehicles for compliance with air quality standards.

Veterinary clinic: A facility for the outpatient treatment of small domestic animals, staffed by at least one doctor of veterinary

medicine, with no outdoor dog runs or play areas, and no indoor or outdoor boarding except for indoor boarding directly related to medical treatment and observation. May include ancillary grooming services.

Warehouse: A use involving the storage of products, supplies, and equipment, and which typically involve truck transportation to and from the site.

Wetlands: Those areas that are inundated or saturated by surface or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions.

Wastewater treatment plant: A facility or group of units used for the treatment of industrial or domestic wastewater for sewer systems and for the reduction and handling of solids and gasses removed from such waste, whether or not such facility is discharging into state waters.

Wholesale trade establishment: An establishment engaged in the selling or distribution of merchandise to retailers, to industrial, commercial, institutional or professional business users, or to other wholesalers.

Wine shop: A licensed location at which a licensee may sell wine by the drink for consumption on-site and also by the package, but which earns a minimum of 70 percent of its annual gross revenue from

package sales of wine unless the Wine Shop is an accessory use to a restaurant.

Wireless telecommunication equipment: Any equipment used to provide wireless telecommunication service, but which is not affixed to or contained within a wireless telecommunication facility, but is instead affixed to or mounted on an existing building or

structure that is used for some other purpose.

Wireless telecommunication equipment also includes a ground mounted base station used as an accessory structure that is connected to an antenna mounted on or affixed to an existing building.

Wireless telecommunication facility: Any freestanding facility, building, pole, tower, or structure used to provide wireless telecommunication services, and which consists of, without limitation, antennae, equipment and

storage and other accessory structures used to provide wireless telecommunication services.

Wrecked motor vehicle compound: An area used to store disabled or impounded motor vehicles until such time as their disposition (either by junk, salvage, repair, etc.) has been determined by the insurance company, the owner of the vehicle, or his legal representative.

Xeriscaping: Landscaping characterized by the use of vegetation that is droughttolerant or a low water use in character.

Yard: A space on the same lot with a principal building, open unoccupied and unobstructed by buildings or structures from ground to sky except where encroachments and accessory buildings are expressly permitted.

Yard, front: An open, unoccupied space on the same lot with a principal building, extending the full width of the lot, and situated between the street right-of-way and the

front line of the building projected to the side lines of the lot. For corner and double frontage lots, front yard requirements apply to all road frontages. Where "build to" line requirements are specified in this Zoning Ordinance, they supersede front yard requirements.

Yard, side: An open, unoccupied space on the same lot with the principal building, situated between the building and the side line of the lot and extending from the rear line of the front yard to the front line of the rear yard.

Yard, rear: An open, unoccupied space on the same lot with a principal building, extending the full width of the lot and situated between the rear line of the lot and the rear

line of the building projected to the side lines of the lot.

Yard sale: The temporary sale of home furniture, appliances, clothing and/or domestic items owned by an occupant of a residential dwelling and taking place on the premises on which such occupant resides, whether in the yard or in a carport or garage. Yard sales which do not take place on the premises on which such occupant resides are considered open-air businesses, except that this shall not be construed to prevent the sale of such items by another family or household in connection with an event where such items are sold by the occupant of a residence on the premises where the yard sale occurs. This term includes garage sales.

Zoning map: The Official Zoning Map of the City of Lilburn.

Note: Except as specifically defined herein, all words used in this resolution [ordinance] shall be defined in The Latest Illustrated Book of Development Definitions (2004, Rutgers) or its successor. Words not defined herein or in the above book shall be construed to have the meaning given by common and ordinary use, and shall be interpreted within the context of the sentence, section and article in which they occur.

(Ord. No. 2016-503, Exh. A, 6-13-2016; Ord.

No. 2020-553, 9-14-2020; Ord. No. 2021- 569, Pt. I, 7-12-2021; Ord. No. 2022-587, § III, 6-13-2022; Ord. No. 2023-597, Att. 1, 2-23-2023; Ord. No. 2023-603, Exh. A, 6-12- 2023; Ord. No. 2023-618, Exh. A, 10-9-2023;

Ord. No. 2024-630, Exh. A, 6-10-2024; Ord.

No. 2025-657, Exh. A, 10-13-2025)

APPENDIX B

DEVELOPMENT REGULATIONS*

THE

DEVELOPMENT REGULATIONS

OF THE

CITY OF LILBURN, GEORGIA

ADOPTED

MARCH 14, 1988

APPENDIX B—DEVELOPMENT REGULATIONS

ARTICLE 1. AUTHORITY, TITLE,

PURPOSE AND INTENT

Sec. 1.1. Authority And Title.

1.1.1 These rules and regulations are adopted under the authority of the Constitution of the State of Georgia and laws enacted pursuant thereto.

1.1.2 These regulations shall be known as "The Development Regulations of the City of Lilburn, Georgia," and may be referred to generally as "The Development Regulations," or, as used herein, "these Regulations."

(Ord. No. 2020-557, Att. A, 11-9-2020) Sec. 1.2 Purpose.

1.2.1 These regulations are intended to serve the following purposes:

a. To protect and promote the public health, safety, and general welfare.

b. To provide a system for the subdividing of lands and the accurate recording of land titles.

c. To provide assurance that lots shown on recorded subdivision plats are usable by the purchasers for their intended and permitted functions.

d. To encourage economically sound and orderly land development in accordance with the policies and objectives of the Comprehensive Plan of the City of Lilburn.

e. To assure the provision of required streets, utilities, and other facilities and services to new land developments in conformance with public improvement policies of the city.

f. To assure adequate provision of safe and convenient traffic access and circulation, both vehicular and pedestrian, in new land developments.

g. To assure the provision of needed open spaces and public facility sites in new land developments through the dedication or reservation for purchase of land for public purposes.

h. To assure equitable review and approval of all subdivision and site plans by providing uniform procedures and standards for the developer.

(Ord. No. 2020-557, Att. A, 11-9-2020) Sec. 1.3. Intent And Application.

It is the intent of these regulations that they apply to and provide guidance for the development of any lands within incorporated area of City of Lilburn, whether the development involves the subdivision of the land for sale to individual users or pertains only to

the construction of buildings or other improvements on a single parcel.

(Ord. No. 2020-557, Att. A, 11-9-2020) Sec. 1.4. Agricultural exemption.

Clearly agricultural uses, limited to the cultivation of the land, dairying or animal husbandry, are not intended to be governed by these regulations, provided that land proposed to be converted to a new agricultural use must be zoned RA-200 to be exempt from the provisions herein.

ARTICLE 2. DEFINITIONS

Sec. 2.1. Use Of Words And Interpretation.

2.1.1 For the purposes of these Regulations, the following shall apply to the use of all words:

a. When appropriate to the context, words used in the singular shall include the plural, and the plural the singular; words used in the present tense shall include the future tense, and vice versa.

b. Words in the masculine gender shall include the feminine.

c. The word "shall" is mandatory and not discretionary.

d. The word "may" is permissive.

e. Use of the word "and" is inclusive and requires that all of the component phrases so connected must be present or fulfilled for sufficiency.

f. Use of the word "or" is not exclusive (as in "either or"), and requires that at least one of the component phrases so connected must be present or fulfilled for sufficiency. The word "or" may allow more than one

component phrase to be present or fulfilled, as is implied by the common term "and/or."

2.1.2 The following shall control the interpretation of words and phrases as used in these Regulations:

a. Words and phrases defined in this Article shall be interpreted as defined herein without regard to other meanings in common or ordinary use, unless the context of the word indicates

otherwise.

b. Words or phrases not defined herein shall be interpreted as defined in the Zoning Resolution of the City of Lilburn, or as defined in the City's Soil Erosion, Sedimentation and Pollution Control Ordinance, Buffers, Landscaping and Vegetation

Ordinance, as applicable to the use of the word within the context of these Regulations.

c. Words not defined herein or in the Zoning Resolution or any other applicable code, regulation, or ordinance of City of Lilburn shall be construed to have the meaning given by common and ordinary use, and shall be interpreted within the context of the sentence, section, and article in which they occur.

(Ord. No. 2020-557, Att. A, 11-9-2020) Sec. 2.2. Definitions Of Words And Phrases.

Certain words or phrases in these Regulations are defined for their use herein as follows:

Alley or Service Drive. A minor, permanent, public service-way which is used primarily for vehicular service access to the back or the side for properties otherwise abutting on a street.

Administrator. The person appointed to administer and implement Article 8 for PostConstruction Stormwater Management for New Development and Redevelopment in

accordance with Section 8.2.3.

Applicant. A person, either the owner or the bona fide representative of the owner of land or structures governed by these regulations, who seeks authority to use, develop, construct upon or otherwise enjoy the use of

property through any of the procedures established under these regulations.

Arterial. A Principal Arterial, Major Arterial, or Minor Arterial street as defined and designated in the Comprehensive Plan of

City of Lilburn or Long Range Road Classification Map of Gwinnett County.

As-Built Survey. See Record Drawing.

Authorized Registered Professional.

(1) A landscape architect who possesses a current certificate of registration issued by the State of Georgia in accordance with Georgia Law; or,

(2) A land surveyor who possesses a current certificate of registration issued by the State of Georgia in accordance with Georgia Law; or,

(3) A professional engineer who possesses a current certificate of registration issued by the State of Georgia in accordance with Georgia Law.

Base flood. The flood having a one percent or greater chance of being equaled or exceeded in any given year, also known as the 100- year flood.

Base flood elevation. The highest water surface elevation anticipated at any given point during the base flood.

Block. A piece or parcel of land entirely surrounded by public streets, other than alleys.

BMP or best management practice.

Structural devices to store or treat stormwater runoff and non-structural programs or practices which are designed to prevent or

reduce the pollution of the waters of the State of Georgia.

BMP landscaping plan. A design for vegetation and landscaping that is critical to the performance and function of the BMP including how the BMP will be stabilized and established with vegetation. It shall include

a layout of plants and plant names (local and scientific).

Buildable Lot of Record. A lot or parcel of land which existed as a single parcel of ownership, recorded as such in its entirety and present boundaries with the Clerk to Superior Court prior to June 2, 1970, or which is shown in its entirety and present boundaries on a Final Plat or Exemption Plat duly approved under these or any previously applicable regulations providing for the subdivision of land in City of Lilburn

and recorded with the Clerk to Superior Court of Gwinnett County..

Building Setback Line. A line across a lot parallel to a street right-of-way or other property line establishing the minimum open space to be provided between any principal building and the street or other property line. All building setback lines shall be at least as restrictive as the corresponding minimum yard setbacks required in the Zoning Resolution. On corner lots, the minimum required front yard setback shall be provided along all abutting streets.

Certificate of Development Conformance.

Final approval issued by the Department for completion of land development activities for a subdivision or project for which a Development Permit was issued.

Certificate of Occupancy. Final approval by the Department for the use or occupancy of a structure for which a Building Permit was issued.

Channel. A natural or artificial watercourse with a definite bed and banks that conveys continuously or periodically flowing water.

City. City of Lilburn, Georgia City Council. The Mayor and City Council of City of Lilburn, Georgia.

Clearing. The removal of trees or other vegetation, but not including grubbing activities.

Comprehensive Plan. A plan summarizing and illustrating the adopted goals and objectives of the City Council regarding the future location and character of anticipated land

uses, transportation, and other public facilities in City of Lilburn. The term "Comprehensive Plan" includes component

or functional plans for the city, including but not limited to a plan for land use (i.e., Land Use Plan) or a plan for transportation facilities, and includes the classification of streets and thoroughfares as shown on the Gwinnett County adopted Long Range Road Classification Map.

Concept Plan. A drawing which shows the overall concept (e.g. a concept plan) of a proposed development, and which may include lots and streets in a subdivision or the general location of buildings and improvements for a multi-family or non-residential project, and which may be drawn to

approximate dimensions in a freehand style.

Condominium. A form of property ownership in which the buildings or portions of the buildings, whether residential or nonresidential in use, are owned by individuals separate from the lands which surround the

buildings, said lands held in common ownership by the owners of the several buildings.

County. Gwinnett County, Georgia.

Cul-De-Sac. A street having one end open to traffic and being permanently terminated within the development by a vehicular turnaround. For the purpose of designation, a cul-de-sac street shall be interpreted to begin at the intersection of two or more streets nearest to the vehicular turnaround.

Department. The Department of Planning and Economic Development of the City of Lilburn, Georgia.

Detention. The temporary storage of stormwater runoff in a stormwater detention facility for the purpose of controlling the peak discharge.

Detention facility. A structure designed for the storage and gradual release of stormwater runoff at controlled rates.

Developer. Any person, individual, firm, partnership, association, corporation, estate, trust, or any other group or combination acting as a unit who directs the undertaking or proposes to undertake development activities as herein defined, whether the development involves the subdivision of the land for sale to individual users, the construction of

buildings or other improvements on a single land ownership, or both.

Development. 1. (verb) All activities associated with the conversion of land or the expansion or replacement of an existing use

to any new use intended for human operation, occupancy or habitation, other than for agricultural purposes devoted strictly to the

cultivation of the land, dairying or animal husbandry. Such activities include land disturbance (clearing and grubbing the land of vegetation and stumps, and grading) and the construction of improvements such as but not limited to streets, driveways or parking areas, water or sewer mains, storm water drainage facilities, sidewalks or other structures permanently placed on or in the property. 2. (noun) Where appropriate to the context, the term "development" also may be used to denote a specific subdivision or project which is a single entity or intended to be constructed as an interrelated whole, whether simultaneously or in phases.

Development Permit. An official authorization issued by the Department permitting clearing, grubbing, grading, or construction

of storm drainage facilities, utilities, access drives, streets, parking or other improvements exclusive of buildings.

Development Plans. Those detailed and professional plans showing the layout and design, site work and construction activities proposed for a project (other than architectural building plans) and including the Preliminary Plat or Site Plan (as applicable), Grading Plan, Tree Protection Plan, Erosion and Sediment Control Plan, Buffer and Landscape Plan, and construction drawings for streets, storm water drainage facilities, sanitary sewers, water supply facilities, and other site improvements.

Diameter Breast Height (DBH). The diameter of a tree measured at a point four and one-half feet above the ground.

Director. The Director of the Department of Planning or his/her designee.

Drainage Improvements. Those facilities and structures intended to control and direct the passage of storm waters and other surface water flows from and across a property;

including, but not limited to, swales and ditches, cross drains and other piping systems, catch basins, detention ponds, and velocity dissipation devices.

Dripline. A line on the ground established by a vertical plane extending from a tree's outermost branch tips down to the ground;

i.e., the line enclosing the area directly beneath the tree's crown from which rainfall would drip.

Driveway. A vehicular access way in private ownership, other than a Private Street, which provides access primarily to only one property, or to no more than two single-family detached residences.

Easement. Recorded authorization for a specified purpose by a property owner for the use of any designated part of the real property by another entity.

Engineering Department. The City of Lilburn or Gwinnett County Department of Engineering.

Erosion Control Regulations. The City of Lilburn Soil Erosion and Sedimentation and Pollution Control Ordinance.

Exemption Plat. A subdivision plat drawn to Final Plat standards, as contained herein, prepared in accordance with one of the exemptions provided under Article 3 of these Regulations.

Extended Detention. The storage of stormwater runoff for an extended period of time.

Extreme Flood Protection. Measures taken to prevent adverse impacts from large lowfrequency storm events with a return frequency of 100 years or more.

Fee Simple. A form of property ownership in which the buildings and surrounding lands are owned by the same person.

Federal Emergency Management Agency (FEMA). The Federal Agency which administers the National Flood Insurance Program. This Agency prepares, revises and distributes the maps and studies referenced in these Regulations.

Final Plat. A finished drawing of a subdivision showing completely and accurately all legal and boundary information and certification required by these Regulations.

Fire Services Division. A division of the Gwinnett County Department of Public Safety charged with the responsibility of enforcing the County's Fire Prevention and Life Safety Codes, and Gwinnett Handicap Ordinance.

Flood or Flooding. A general and temporary condition of partial or complete inundation of normally dry land areas resulting from (1) The overflow of inland waters; or (2) The unusual and rapid accumulation or runoff of surface waters from any source.

Flood Boundary and Floodway Map. The official map issued by the Federal Emergency Management Agency, where the boundaries of the floodways are shown and the areas of Special Flood Hazard have been defined as Zone "A".

Flood Insurance Rate Map (FIRM). An official map on which the Federal Emergency Management Agency has delineated both the areas of Special Flood Hazard and the applicable risk premium zones.

Flood Insurance Study. The official report provided by the Federal Emergency Management Agency. The report contains flood profiles, as well as the Flood Boundary and

Floodway Map and the water surface elevation of the base flood.

Floodway. The channel of a river or other watercourse and the adjacent and areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than one foot.

Flood prone area. See the Floodplain Management Ordinance of City of Lilburn.

Flood Hazard Area. See Floodplain Floodplain. Those lands subject to flooding, which have at least a one percent probability of a flooding occurrence in any

calendar year based on the basin being fully developed as shown on the current land use plan,: i.e., the regulatory flood. See Floodplain Management Ordinance for ancillary terms.

Flood Related Definitions. See the Floodplain Management Ordinance, for specific definitions of terms used in relation to flooding, alteration of floodplains, construction of structures in or adjacent to floodplains, etc.,

Freeboard. The distance between the maximum water surface elevation and the top of a storm water detention structure.

GCSMM. The latest edition of the Gwinnett County Stormwater Management Manual, Volume 2: Technical Handbook,

and its Appendices, and all amendments Georgia DOT. The Department of Transportation of the State of Georgia.

Grading. The movement, removal or addition of earth on a site by the use of mechanical equipment.

Grading Permit. An official authorization issued by the Department permitting grading of a site, and may include installation of attendant storm water drainage facilities.

Green Infrastructure. An interconnected natural system and/or engineered system that strengthens and mimics natural hydrologic functions and processes through the use of plants and soil to slow, filter, evapotranspire, and infiltrate stormwater runoff close to its source; or the capture and reuse of stormwater runoff.

Grubbing. The removal of stumps or roots from a property.

Health Department. The Gwinnett, Newton, and Rockdale County Health Department.

Hotspot. A land use or activity on a site that has the potential to produce higher than normally found levels of pollutants in stormwater runoff. As defined by the administrator, hotspot land use may include gasoline stations, vehicle service and maintenance areas, industrial facilities (both permitted under the Industrial Stormwater General Permit and others), material storage sites, garbage transfer facilities, and commercial parking lots with high-intensity

use.

House Location Plan (HLP). A drawing showing lot information and all improvements, as outlined in Article 10, Section 10.4.

Impervious surface. A surface composed of any material that significantly impedes or prevents the natural infiltration of water into the soil.

Industrial Stormwater General Permit. The National Pollutant Discharge Elimination System (NPDES) permit issued by Georgia Environmental Protection Division to an industry for stormwater discharges associated with industrial activity. The permit regulates pollutant levels associated with

industrial stormwater discharges or specifies on-site pollution control strategies based on Standard Industrial Classification (SIC)

Code.

Infiltration. The process of percolating stormwater runoff into the subsoil.

Inspection and maintenance agreement. A written agreement providing for the long- term inspection, operation, and maintenance of the stormwater management system(s) and its components on a site.

Land Disturbance Application. The application for a land development permit on a form provided by city of Lilburn along with the

supporting documentation required in Section 8.2.9.

Land Disturbing Activity. Any activity which may result in soil erosion from water or wind and the movement of sediments into state water or onto lands within the state, including but not limited to clearing, dredging, grading, excavating, and filling of land.

Land disturbing activity does not include agricultural practices as described O.C.G.A.

12-7-17(5) or silvicultural land management activities as described O.C.G.A. 12-7-17(6) within areas zoned for these activities.

Land Disturbance Permit. Any permit other than a Building Permit issued by the City of Lilburn that authorizes clearing or grading activities on a site or portion of a site. Said permit may be a Clearing, Clearing and Grubbing, Grading, or Development Permit as defined and authorized herein.

Linear Feasibility Program. A feasibility program developed by the city and submitted to the Georgia Environmental Protection Division, which sets reasonable criteria for determining when implementation of

stormwater management standards for linear transportation projects being constructed by the city is infeasible.

Linear Transportation Projects. Construction projects on traveled ways including but not limited to roads, sidewalks, multi-use

paths and trails, and airport runways and taxiways.

Lot. A portion of a subdivision, or any other parcel of land, intended as a unit for transfer of ownership or for development or both. In determining the area and dimensions of a lot, no part of the right-of-way of a road or crosswalk may be included.

Lot, Corner. A lot abutting upon two or more streets at their intersection.

Lot, Double Frontage. A lot other than a corner lot abutting upon two or more streets.

MS4 Permit. The NPDES permit issued by Georgia Environmental Protection Division for discharges from the City of Lilburn's municipal separate storm sewer system.

Major Thoroughfare. Any public street, existing or proposed, which is shown on the Gwinnett County Long Range Road Classification Map.

Mean Sea Level. The average height of the sea for all stages of the tide. It is used as a reference for establishing various elevations within the floodplain. For purposes of this Ordinance, the term is synonymous with National Geodetic Vertical Datum (NGVD) and/or North American Vertical Datum (NAVD) of 1988.

Minor Collector. A through street having the primary function of connecting subdivisions or other areas to Major Collector streets or other major thoroughfares, or functioning

as a central route within a subdivision channeling traffic from the local streets to an abutting major thoroughfare or another Minor Collector street. For the purposes of these Regulations, a central but non-through route within a subdivision or other project will be considered as a Minor Collector, only if the Average Daily Traffic generated by the development on the route will exceed 2000 trips.

New Development. Land disturbing activities, structural development (construction, installation or expansion of a building or

other structure), and/or creation of impervious surfaces on a previously undeveloped site.

Nonpoint Source Pollution. A form of water pollution that does not originate from a discrete point such as a wastewater treatment facility or industrial discharge, but involves the transport of pollutants such as

sediment, fertilizers, pesticides, heavy metals, oil, grease, bacteria, organic materials and other contaminants from land to surface water or groundwater via mechanisms such as precipitation, stormwater runoff, and leaching. Nonpoint source pollution is a by-product of land use practices such as agricultural, silvicultural, mining, construction, subsurface disposal and urban runoff sources.

Overbank Flood Protection. Measures taken to prevent an increase in the frequency and magnitude of out-of-bank flooding (i.e. flow events that exceed the capacity of the channel and enter the floodplain).

Owner. The legal or beneficial owner of a site, including but not limited to, a mortgagee or vendee in possession, receiver, executor, trustee, lessee or other person, firm or corporation in control of the site Pedestrian Way. A right-of-way within a block dedicated to public use, intended primarily for pedestrians and from which motor propelled vehicles are excluded.

Person. An individual, firm, partnership, corporation, joint venture, association, social club, fraternal organization, estate, trust, business trust, receiver, syndicate, or other group or combination acting singly or collectively for a common purpose, and the duly authorized agents thereof.

Planning Commission. The City of Lilburn Planning Commission.

Plat. A map indicating the subdivision, resubdivision, or recombination of land.

Post-construction Stormwater Management. Stormwater best management practices that are used on a permanent basis to

control and treat runoff once construction has been completed in accordance with a stormwater management plan.

Post-development. The conditions anticipated to exist on site immediately after completion of the proposed development.

Practicability Policy. The latest edition of the Metropolitan North Georgia Water Planning District's Policy on Practicability Analysis for Runoff Reduction.

Pre-development. The conditions that exist on a site immediately before the implementation of the proposed development. Where phased development or plan approval occurs

(preliminary grading, roads and utilities, etc.), the existing conditions at the time before the first item being approved or permitted shall establish pre-development conditions.

Pre-development Hydrology. (a) for new development, the runoff curve number determined using natural conditions hydrologic analysis based on the natural, undisturbed condition of the site immediately before implementation of the proposed development; and (b) for redevelopment, the existing conditions hydrograph may take into account the existing development when defining the runoff curve number and calculating existing runoff, unless the existing development causes a negative impact on downstream property.

Preliminary Plat. A drawing which shows the perimeter boundary, topography, lotting arrangements, street layout, and other features of a proposed subdivision, as specified in these Regulations.

Previously Developed Site. A site that has been altered by paving, construction, and/or land disturbing activity.

Project. A principal building or structure, or group of buildings or structures, planned and designed as an interdependent unit together with all accessory uses or structures, utilities, drainage, access, and circulation facilities, whether built in whole or in phases.

Examples include: a principal building on a lot, a residential subdivision, a multi-family development, a shopping center or an office park.

Public Utilities Department. The Gwinnett County Department of Water Resources.

Record Drawing. A survey or other drawing based on a field survey which shows existing features or components and

horizontal or vertical information (grades or location of improvements).

Redevelopment. Development on a previously developed site; but excludes ordinary/ routine maintenance activities.

Redevelopment includes construction, installation, or expansion of a building or other structure), creation or addition of impervious surfaces, replacement of impervious surfaces not as part of routine maintenance,

and land disturbing activities associated with structural or impervious development on a previously developed site.

Responsible Party. In the context of enforcement procedures, a person (as defined above) who is alleged to have committed, caused,

continued or created a violation of the terms, requirements, regulations, or provisions of these Regulations whether as a direct act, through lack of action or neglect, or at the direction of or on behalf of others. A responsible party may be the owner of a premises where a violation has occurred; an occupant whether through ownership, lease or other tenancy; a contractor, builder or developer; an agent of or person otherwise acting on behalf of the aforementioned parties; or other person acting in violation of these regulations.

Road. See "Street, Public."

Roadway. The paved portion of a street from back of curb to back of curb (or edge to edge of pavement for streets not having curbs) but excluding driveway aprons, bridges, and large single and multi-cell culverts which in an hydrologic sense can be considered to function as a bridge.

Routine Maintenance. Activities to keep an impervious surface as near as possible to its constructed condition. This includes ordinary maintenance activities, resurfacing paved areas, and exterior building changes or improvements which do not

materially increase or concentrate stormwater runoff, or cause additional nonpoint source pollution.

Runoff. Stormwater runoff.

Runoff Reduction. The interception, evapotranspiration, infiltration or capture and reuse of stormwater runoff.

Sheet Flow. Diffused water running overland to a defined watercourse.

Site. An area of land where development is planned, which may include all or portions of one or more parcels of land. For subdivisions and other common plans of

development, the site includes all areas of land covered under an applicable land development permit.

Site Work. Development activity to prepare a property for construction of buildings or finished structures, including clearing, grubbing, grading, and installation of soil sedimentation and erosion control facilities.

Sketch Plan. See Concept Plan.

Street, Private. An access way similar to and having the same function as a public street, providing access to more than one property, but held in private ownership (as distinct from a "driveway").

Street, Public. A right-of-way dedicated to and accepted by the City of Lilburn and/or Gwinnett County for vehicular traffic or over which the City of Lilburn and/or Gwinnett County may hold a prescriptive easement for public access, and including designated and numbered U.S. and State

Highways. For the purposes of these Regulations, the term "public street" shall be limited to those which afford or could afford a direct

means of vehicular access to abutting property, and exclude limited access roadways which abut a property but from which direct access may not be allowed under any circumstances.

Street, Local Nonresidential. A surface street intended primarily to provide local access to adjacent existing or planned commercial or industrial development and not for through traffic.

Street, Local Residential. A surface street intended primarily to provide local access to adjacent residential development and not for through traffic.

Street, Marginal Access. A local street which is parallel to and adjacent to a major thoroughfare and which provides access to adjacent properties and protection from through traffic.

Stormwater Concept Plan. An initial plan for post-construction stormwater management at the site that provides the groundwork for the stormwater management plan including the natural resources inventory, site layout concept, initial runoff characterization, and first round stormwater management system design.

Stormwater Management Plan. A plan for post-construction stormwater management at the site that meets the requirements of

8.2.7 and is included as part of the land development application.

Stormwater Management Standards. Those standards set forth in Section 8.2.6.

Stormwater Management System. The entire set of non-structural site design features and structural BMPs for collection, conveyance, storage, infiltration, treatment, and disposal of stormwater runoff in a manner designed to prevent increased flood damage, streambank channel erosion, habitat degradation and water quality degradation, and to enhance and promote the public health,

safety and general welfare.

Stormwater Runoff. The flow on the surface of the ground, resulting from precipitation.

Structure. Anything constructed or erected on the ground or attached to something on the ground.

Subdivider. Any person, individual, firm, partnership, association, corporation, estate, trust, or any other group or combination acting as a unit dividing or proposing to divide land so as to constitute a subdivision as herein defined, including an agent of the subdivider.

Subdivision. 1. (verb) Any division or redivision of a lot, tract or parcel, regardless of its existing or future use, into two or more lots, tracts or parcels. The term, "subdivision" shall mean the act or process of dividing property. 2. (noun) Where appropriate to the context, the term "subdivision" also may

be used in reference to the aggregate of all lots held in common ownership at the time of division.

Tie Point. The point of reference for a boundary survey. Said point of reference shall be an established, monumented position which can be identified or relocated from maps, plats, or other documents on

public record.

Traffic Engineer. The City Director of Planning or designated head of the Gwinnett County Department of Transportation, or his designee.

Tree. Any self-supporting woody perennial plant, usually having a main stem or trunk and many branches, and at maturity

normally attaining a trunk diameter greater than three inches at any point and a height of over ten feet.

Tree Diameter. The widest cross-sectional dimension of a tree trunk measured at diameter breast height (DBH) or at any point below DBH for new trees or multitrunked species, but in no case less than 6 inches from the ground.

Tree Protection Area. Any portion of a site wherein are located existing trees which are proposed to be retained in order to comply with the buffer requirements of the Zoning Resolution or the requirements of the Tree Protection Ordinance.

Tree Protection Plan. A plan that identifies tree protection areas, existing trees to be retained and proposed trees to be planted

on a property to meet minimum requirements of the Tree Protection Ordinance, as well as methods of tree preservation to be

undertaken on the site and other pertinent information.

Watercourse. A channel with a defined bed and banks, including lakes, ponds, and marshes.

Zoning Resolution. The adopted Zoning Resolution of the City of Lilburn, Georgia, as amended from time to time.

(Ord. No. 012-01, 12-10-2001; Ord. No. 113- 04, 3-8-2004; Ord. No. 2020-557, Att. A, 11-9-2020)

ARTICLE 3. APPLICATION OF THE

REGULATIONS

Sec. 3.1. Application.

Any land disturbance activity or any development activity must first comply with these Regulations.

Sec. 3.2. Dedication Of Public Lands And Facilities.

3.2.1 No land dedicated as a public street or other public purpose shall be opened or accepted as a public street or for any other public purpose, and no subdivision of land shall be made, nor subdivision plat, nor part thereof, shall be recorded before obtaining final approval from the Gwinnett County Department of Planning and Development.

Said approval shall be entered in writing on the Final Plat by the Director of the Department of Planning and Development. Said Director is hereby authorized to accept such

dedications of lands and public facilities on behalf of Gwinnett County and to cause such dedications to be recorded by the Clerk to Superior Court of Gwinnett County, subject to ratification by the Board of Commissioners.

Sec. 3.3. Transfer Of Land Ownership.

3.3.1 No person, firm, partnership, association, corporation, estate, trust, developer, subdivider or any other owner or agent shall

transfer title or attempt to record the title to any land in unincorporated Gwinnett County, and no building permit may be issued on said land, unless:

a. Said land existed as a single parcel of ownership, recorded as such in its entirety and present boundaries with the Clerk to Superior Court of Gwinnett County prior to the 1970 Subdivision Regulations; or,

b. Said land is shown in its entirety and present boundaries on a Final Plat as approved (under these or any previous applicable regulations) and duly recorded with the Clerk to Superior

Court of Gwinnett County; or,

c. Said land is shown in its entirety and present boundaries on a plat authorized by the Director and recorded with the Clerk to Superior Court of

Gwinnett County pursuant to the regulations governing Subdivision Exemptions contained herein; or,

d. Said land is an aggregation of properties for land assembly purposes, and no building permit will be requested

prior to the filing of an application for and issuance of a development permit, pursuant to these Regulations.

3.3.2 No person, firm, partnership, association, corporation, estate, trust, developer, subdivider or any other owner or agent shall

transfer title to any property by reference to, exhibition of, or any other use of any map or plat illustrating the subdivision of land without a Final Plat of said land showing said property first having been duly approved

under the procedures of these Regulations or any previously applicable regulations and recorded with the Clerk to Superior Court of Gwinnett County.

Sec. 3.4. Subdivision Exemptions.

3.4.1 General Requirements For the purpose of these Regulations the types of activities contained in this Section shall be considered subdivisions but exempt from the "procedures" and "required public improvements" portions of these Regulations, except that sidewalks shall be required on streets as described in Sec. 6.13.1(b) of

these Regulations. Each such subdivision shall be drawn as an Exemption Plat in accordance with Final Plat standards (except Sections 3.4.4b and 3.4.6) pursuant to the requirements of these Regulations and shall be submitted in five copies together with the appropriate fees to the City of Lilburn for review and approval. Upon approval, the city shall

authorize the recording of the Exemption Plat with the Clerk of Superior Court of Gwinnett County and grant the issuance of building permits pursuant to the Codes and Ordinances of the City of Lilburn.

(Res. of 6-10-1996)

3.4.2 Recombinations The combination or recombination of all of two or more buildable lots of record, where the total number of lots is not increased and the resultant lots or parcels are in compliance with the Zoning Resolution. An Exemption Plat shall not be required for aggregations of properties for land assembly purposes where no building permit will be requested

prior to issuance of a development permit.

3.4.3 Minor Subdivisions The division of a buildable lot of record into five or fewer lots, provided:

a. Each proposed lot complies with all requirements of the Zoning Resolution and is limited to single-family detached residential use.

b. Each proposed lot fronts on an existing public street.

c. All slope and utility easements as well as necessary street right-of-way as determined by the Department based on the Comprehensive Plan are provided at no cost to the County.

d. Each lot thus created may not be resubdivided pursuant to the provisions of this subparagraph. Such resubdivisions shall be accomplished

only through the procedures contained in Article 11 of these Regulations.

e. Each proposed lot shall comply with the requirements of the Public Utilities Department and the Health Department, as appropriate, whose certification of approval shall be required prior to approval of the Exemption

Plat by the Department.

3.4.4 Estate Subdivisions

a. The division of land in any single family detached residential zoning district into lots having a minimum lot area of at least five acres, provided:

(1) Each proposed lot fronts on an existing public street which contains or shall contain the necessary right-of-way width required by these Regulations as determined by the Comprehensive Plan.

(2) Each proposed lot shall provide at least 100 feet of frontage upon the street, shall provide at least 200 feet of lot width measured in accordance with the requirements of the Zoning Resolution, and shall meet or exceed all other minimum requirements of the applicable single family detached residential zoning district.

(3) All slope and utility easements shall be provided at no cost to the County as determined by the Department.

(4) No lot thus created may be resubdivided to less than five acres as an exemption to these Regulations.

(5) Each proposed lot shall comply with the requirements of the Public Utilities Department and the Health Department, as appropriate, whose certification of approval shall be required prior to approval of the Exemption Plat

by the Department.

b. The division of land in any single family detached residential zoning district into lots having a minimum lot area of at least ten acres, provided:

(1) Each proposed lot fronts on an existing public street.

(2) Each proposed lot shall provide at least 100 feet of frontage upon the street, shall provide at least 200 feet of lot width measured in accordance with the requirements of the Zoning Resolution, and shall meet or exceed all other minimum requirements of the applicable single family detached residential zoning district.

(3) No lot thus created may be resubdivided to less than 5 acres as an exemption to these Regulations.

(4) A Record Survey certified by a Land Surveyor currently registered in the State of Georgia shall be submitted to and approved by

the Department showing all lots.

3.4.5 Nonresidential Project Management The creation of a lot for recording within an overall nonresidential development, provided:

a. The overall nonresidential development is being undertaken as a single multi-phase or multi-use project under the unified control of a single developer, is zoned for such use or

development, and an overall Sketch Plan for the entire project has been approved by the Director.

b. The proposed subdivision is clearly intended to transfer title for financing or building management purposes and not for the sale of the property for future development, to the satisfaction of the Director.

c. The proposed lot has been approved by the Department to be provided permanent vehicular access by private drive. Said access shall be established by easement or acceptable covenant prior to or concurrently with recording of the Exemption Plat.

d. The proposed lot must encompass a principal structure which has been granted a building permit and which is under construction or has been completed.

e. The Exemption Plat shall be drawn to include the entirety of the overall development and shall clearly identify those lots to be recorded, those lots

previously recorded and the remainder of the development which shall be labeled "not included." All easements,

dedications, etc., shall be shown as appropriate or required. Each lot shall be consistent with the zoning approved for the overall development and the applicable requirements of

the Gwinnett County Zoning Resolution.

3.4.6 Amnesty Lots The designation of a lot as a buildable lot of record if the lot was recorded between June 2, 1970, and the effective date of these Regulations but not reviewed and approved under the provisions of the Subdivision Regulations in effect at that time, provided:

a. The Exemption Plat is limited to one individual lot and no property which adjoins the lot is or has been owned by the applicant in whole or in part.

b. The lot meets all requirements of the Zoning Resolution, and the applicant demonstrates to the satisfaction of the Director that approval of the lot will not create nonconformity to the requirements of the Zoning Resolution on any other portion of the original

property from which the lot was subdivided.

c. The lot fronts on an existing public street.

d. All slope and utility easements as well as necessary street right-of-way as determined by the Director based on the Comprehensive Plan is provided at no cost to the County.

e. The lot shall comply with the requirements of the Public Utilities Department and the Health Department, as appropriate, whose certification of approval shall be required prior to approval of the Exemption Plat by the Director.

f. A Record Survey certified by a Land Surveyor currently registered in the State of Georgia shall be submitted to and approved by the Department showing the lot.

ARTICLE 4. PERMITS REQUIRED

FOR DEVELOPMENT OR

CONSTRUCTION

4.1.1 Permit Required; Exemptions No disturbance of the land, including clearing, grubbing, or grading activities, shall commence or proceed except in accordance

with the provisions of these Development Regulations, unless the activity is exempt as an agricultural activity in the RA-200 zoning district, or is for the construction of an individual single-family detached or duplex residence on a buildable lot of record.

4.1.2 Plan Review and Approval Any developer of land within unincorporated Gwinnett County shall first submit to the Department such plans, plats, or construction drawings as may be required by these Regulations and shall have been granted a

permit consistent with these Regulations and approved by the Department prior to the initiation of development activities. Approval of plans by Gwinnett County officials or employees shall not imply nor transfer acceptance of responsibility for the application of the principles of engineering, architecture,

landscape architecture, or any other profession, from the professional corporation or individual under whose hand or supervision

the plans were prepared and sealed. Article 10 of these Regulations details the elements of the required plans.

4.1.3 Chattachoochee River Corridor Certificate If any portion of a property included within a proposed project is located within 2,000 feet of the bank of the Chattachoochee River, the project shall first obtain a Certificate authorizing the development under the provisions of the Metropolitan River Protection Act before any clearing, grading, or construction activity may be granted a permit by the

Department or any other agency. All permits issued by Gwinnett County pursuant to such authorization shall be consistent with the requirements and provisions of the Certificate. Any violation of the provisions of the Metropolitan River Protection Act Certificate

shall be considered as though a violation of these Development Regulations, and shall be subject to the enforcement and penalty provisions hereunder.

4.1.4 Interdepartmental Review and Approval The Department shall not issue a permit for any development activities until the plans, plats, or construction drawings, as applicable, have been approved by such other departments or agencies as may have authority or jurisdiction over said activities in whole or in

part.

4.1.5 Activities Limited to Permit Authorization Development activities shall be limited to those as authorized by the applicable permit and as may be further restricted by conditions of approval pertaining thereto attached by the Department or other department or

agency as may have authority or jurisdiction over said activities in whole or in part.

4.1.6 Developer's Responsibility for Compliance No permit shall be interpreted to relieve any developer or subdivider of the responsibility of maintaining full compliance with all codes, ordinances, and other regulations of

Gwinnett County except as amended by an approved Waiver, Variance, or other relief granted through applicable formal appeal procedures for a specific property or application. Any permit issued in error or in contradiction to the provisions of an adopted code, ordinance, or regulation of Gwinnett County

shall be considered to have been null and void upon its issuance.

Sec. 4.2. Land Disturbance Permits.

4.2.1 Clearing Permit, Clearing and Grubbing Permit, and Grading Permit.

The following permits covering portions of the land development process may be issued in accordance with the requirements of these Regulations and the provisions of any Metropolitan River Protection Act Certificate, if applicable:

a. Clearing Permit:

(1) A permit limited to clearing only with no grubbing or other land disturbance (as defined in the Georgia Soil Erosion and Sedimentation Act) may be issued upon identification of the property, the limits of the area to be cleared and the type of activities

to be undertaken, and approval of a Tree Protection Plan as may be required under the Tree Protection Ordinance. All clearing activities are to be consistent with

the provisions of these Regulations, the Soil Erosion and Sediment Control Ordinance, the Zoning Resolution and any conditions of zoning approval.

(2) A clearing permit shall expire unless activities are commenced within 60 consecutive calendar days of issuance of the permit or if activities lapse and are abandoned for a period exceeding 30 consecutive calendar days.

(3) A clearing permit shall not be construed as approval of or authorization to construct any improvements, buildings, or other structures on the property.

b. Clearing and Grubbing Permit:

(1) A clearing and grubbing permit may be approved based on approval of a Concept Plan and Tree Preservation and/or Replacement

Plan (if required) for the development. Appropriate soil erosion and sedimentation controls and tree

protection measures shall be placed and maintained as required.

(2) A permit for clearing and grubbing shall expire unless activities are commenced within 60 consecutive calendar days of issuance of the permit or if activities lapse

and the project is abandoned for a period exceeding 30 consecutive calendar days.

(3) A clearing and grubbing permit shall be limited to the removal of vegetation and stumps and the placement of required tree protection measures and soil erosion and sedimentation facilities, and

may authorize the removal of existing structures on the property at the option of the developer. No

grading or construction activities may be started under a clearing and grubbing permit. The approval of a clearing and grubbing permit shall not imply the approval of or authorization to construct any improvements, buildings, or other structures on the property.

c. Grading Permit:

(1) A grading permit, which may include clearing and grubbing, may be issued prior to approval of a

development permit, as provided under Article 10 of these Regulations. A grading permit may also be issued for earth borrow or storage, where no development or construction is proposed or imminent, based on approval of a grading plan, soil erosion and sediment control plan, and hydrology study, consistent with the requirements of the Buffer, Landscape, and Tree Ordinance, the zoning

category of the site, and the provisions of the Comprehensive plan (as applicable).

(2) A permit authorizing but limited to grading (and clearing and grubbing) shall expire unless activities are commenced within 60 consecutive calendar days of issuance of the permit or if activities lapse and the project is abandoned for a period exceeding 30 consecutive calendar days. Any

site for which the grading permit expires shall immediately be stabilized to prevent erosion.

(3) A grading permit shall be limited in its authorization to land grading activities along with associated tree protection, clearing and grubbing, and demolition activities, and may authorize the construction of storm drainage improvements and soil erosion and sedimentation facilities as allowed by the permit itself.

(Ord. No. 113-04, 3-8-2004)

4.2.2 Development Permit

a. Development Activities Authorized A Development Permit shall be issued to authorize all activities associated with the land development process, including clearing and grubbing, grading, and the construction of such improvements as streets, surface parking areas and drives, sewer systems, storm water drainage facilities, sidewalks, or other structures permanently placed on or in the property except for buildings or other structures requiring the issuance of a building permit. Water system improvements shall be authorized solely by the Public Utilities Department.

b. Development Permit Approval A development permit (which may include grading, clearing, and grubbing) shall be issued at the developer's request following approval of a Metropolitan River Protection Act Certificate, if applicable, and upon approval of a Preliminary Plat for a subdivision

or a Site Plan for a non-subdivision project, along with approval of all other development plans and documents required to be submitted under Article 5 of these Regulations. All plans approved for a development permit shall expire after six months if no permit is

issued within said time period.

c. Expiration of Development Permits A development permit shall expire 12 months after issuance unless development activity as authorized by the permit is initiated within the

twelve-month period or if such authorized activities lapse and the project is abandoned for a period exceeding 30

calendar days. Provided, however, that the Director may approve one extension not exceeding three months within which time development activity must

commence or the permit shall expire.

Said extension shall be applied for within the first twelve consecutive calendar months after the permit's issuance.

A development permit shall expire 12 consecutive calendar months after issuance unless development activity as authorized by the permit is initiated within the twelve-month period or if such authorized activities lapse

and the project is abandoned for a period exceeding 60 consecutive calendar days. The Director or designee may approve one extension not exceeding three consecutive calendar months within which time development activity must commence or the permit shall expire. Said extension shall be applied for within the first twelve consecutive calendar months after the permit's issuance.

d. Lapse in Construction Activity For the purposes of these Regulations, a lapse in or suspension of development activity as authorized by a development permit, as a direct result

of action or inaction on the part of Gwinnett County completely beyond the control of the developer, shall not be considered as a lapse in activity causing the development permit to expire. The 12 months within which development activity must begin shall exclude any such time period during which the activity is prohibited or has been caused to lapse by said County action or inaction.

(Ord. No. 113-04, 3-8-2004) Sec. 4.3. Building Permits.

4.3.1 Applicable Codes Building permits for all structures or interior finishes are issued after meeting the applicable requirements of the fire prevention and life safety codes, and the various health, water, sewer, and building codes of

Gwinnett County, as well as the provisions of any Certificate approved under the Metropolitan River Protection Act, if applicable.

4.3.2 Health Department: On-Site Sewage Disposal For any structure for which on-site sewage disposal will be provided, a permit issued by the Health Department shall be required prior to issuance of a building permit. Said permit may first require approval by the Health Department of a plan showing the location of the sewage disposal system and other site improvements, in accordance with their regulations.

4.3.3 Single-Family and Duplex Residences

a. A building permit for a single or twofamily residence may be issued after the recording of a Final Plat or after

the lot upon which the building is to be located has otherwise become a buildable lot of record.

b. The approval by the Department of a House Location Plan (HLP), Residential Drainage Plan (RDP), or Residential Drainage Study (RDS), may be required prior to issuance of the building permit, as noted and conditioned on the Final Plat or as may be required for compliance with the Georgia Metropolitan River Protection Act.

For such lots, a Certificate of Occupancy shall not be issued until conformance to the HLP, RDP, or RDS has been field verified by the Department or shown on a certified foundation survey prepared by a Registered Land Surveyor. (See Article 6 for plan

and study specifications.)

4.3.4 Swimming Pools Issuance of a building permit for a swimming pool as an accessory use to a single or two-family residence, whether to be issued at

the same time as or subsequent to the permitting or construction of the house or duplex, shall first require approval of a Swimming Pool Location Plan (see example in Appendix A). The plan shall show the proposed location of the swimming pool and enclosing fence relative to the residence, the

property boundaries, setback lines, septic tank and septic tank drain field (if any), and any easements on the site, and shall comply with all requirements of the Zoning Resolution and Swimming Pool Code. Based on site conditions, a Residential Drainage Study (RDS) may also be required prior to issuance of the building permit. A Certificate of Occupancy shall not be issued until conformance to the Swimming Pool Location Plan (and to

provisions of the RDS, if applicable) has been field verified by the Department.

4.3.5 Multi-Family and Nonresidential Structures

a. Issuance of a building permit for any principal building other than a singlefamily detached or duplex residence (and associated accessory structures)

shall first require issuance of a Development Permit for the building site, and the building permit shall be consistent with said Development Permit.

b. Building plans must be reviewed and approved by the Fire Services Division, Development, and Public Utilities Departments prior to permitting for all structures, except for one and

two-family residences or accessory structures. Building Plan approval shall expire after one year, after which review and approval by the Department shall be required prior to issuance of a building permit for the building or additional buildings.

4.3.6 Issuance on Buildable Lots of Record;

Exceptions Building permits shall only be issued on buildable lots of record, as defined in these Regulations, except under special circumstances limited to and as specifically described in this Section, below.

a. In single-family detached and duplex residential subdivisions, building permits for no more than two model home buildings on specific lots may be issued by the Department on the basis of an approved Preliminary Plat after

the approval of the Fire Services Division, and the Health Department or Water Pollution Control Division, as

appropriate, and subject to all limitations or requirements as may be established by the Director. No Certificate of Occupancy shall be issued for the model home until the Final Plat

including the model building lots has been approved and recorded.

b. In nonresidential subdivisions, building permits may be issued by the Department on the basis of an approved Preliminary Plat and after a Development Permit has been approved reflecting the site plan and construction drawings for specific buildings and associated site improvements. Issuance of the building permits shall be conditioned on the following:

(1) A performance bond or other approved surety shall have been received in a form acceptable to

the County Attorney, drawn in favor of Gwinnett County and in an amount not less than 110 percent of the cost of completing all public improvements as authorized and required by the Preliminary Plat.

(2) The performance bond or other approved surety shall not exceed an aggregate total for all required public improvements of $12,000.00 per acre for the total

acreage included within the subdivision or portion of the subdivision wherein the improvements are proposed, except by approval

of the Board of Commissioners.

(3) Fire Services Division approval shall be required prior to issuance of any building permit, which may include approval of acceptable access and water under pressure for combustible construction.

(4) Approval of the Health Department for on-site sewage disposal or by the Water Pollution Control

Division for a building to be served by public sewer shall be required prior to issuance of any building permit.

(5) Construction of the required public improvements shall proceed concurrently with construction of

the buildings.

(6) No Certificate of Occupancy shall be approved for any structure within the subdivision prior to recording of the Final Plat without the express approval of the Director.

(7) The Director shall have found that the public interest is best served and that a public purpose is involved in the acceptance of the performance bond.

c. In fee-simple townhouse subdivisions, a building permit may be issued on a buildable lot of record established for each building (containing any number of townhouse dwelling units) through recording of a Final Plat following completion of all required public improvements. Upon completion of the buildings, the Final Plat shall be rerecorded to establish individual lots for the townhouse units, based on

their actual locations, prior to issuance of Certificates of Occupancy.

ARTICLE 5. GENERAL

REQUIREMENTS

5.1.1 Land subject to flooding, improper drainage or erosion, and any land deemed to be unsuitable for development due to steep slope, unsuitable soils or subsurface conditions, etc., shall not be subjected to development for any uses as may continue such conditions or increase danger to health, safety,

life, or property, unless steps are taken to eliminate or abate these conditions.

5.1.2 Land within a proposed subdivision or development which is unsuitable for development shall be incorporated into the buildable lots as excess land. Lots which do not comply with the requirements of the Zoning

Resolution are prohibited.

Sec. 5.2. Conformance To The Comprehensive Plan.

5.2.1 Where features of the Comprehensive Plan such as school sites, parks, streets other than local streets, or other public spaces

are located in whole or in part in a proposed development, or when these features have not been anticipated by the Comprehensive Plan and planning policy, but are considered essential by the Board of Commissioners, land for such features shall be dedicated. The developer may request the Board of Commissioners to approve a reservation instead of dedication. In such cases, the Board of Commissioners shall consider the request in its normal course of business and shall approve

or deny the request within 90 days. (See Article 13)

5.2.2 The Director may waive the dedication and reservation requirements of Article

5.2.1 above whenever the public body responsible for land acquisition executes a written release stating that such a planned feature is

not being acquired.

5.2.3 The Director shall disapprove projects when such planned features, as specified by the Comprehensive Plan, are not incorporated therein.

5.2.4 Whenever the development proposes the dedication of land to public use and the Director or the appropriate agency finds that such land is not required or suitable for public use, the Director may require the rearrangement of lots to include such land in private ownership.

Sec. 5.3. Zoning And Other Regulations.

5.3.1 Whenever there is a discrepancy between minimum standards or dimensions required herein and those contained in zoning regulations, building codes, or other official regulations or resolutions, the most restrictive shall apply. In those instances where the required right-of-way width or roadway

improvements for a specific project have been established as a condition of zoning approval, the requirements of the zoning condition shall control, whether more or less restrictive than the requirements of these Regulations.

5.3.2 Building setback lines shall at least conform to the minimum yard requirements of the Gwinnett County Zoning Resolution.

Building setback lines along all public streets shall be no less than the front yard setback required on the property by the applicable zoning district in the Zoning Resolution.

Sec. 5.4. Required Public Improvements.

5.4.1 General Requirements Every developer of lands within the jurisdiction of these Regulations shall provide the public improvements included in these Regulations as shall be appropriate to serve the project, in accordance with these Development Regulations and other pertinent Codes, Ordinances, and regulations of Gwinnett

County. Said improvements and associated lands shall be provided at no cost to Gwinnett County, and shall be dedicated or otherwise transferred, as required, to the public in perpetuity and without covenant or reservation, except as otherwise provided herein.

Sec. 5.5. Lots.

5.5.1 Lots shall at least conform to requirements of the Gwinnett County Zoning Resolution.

5.5.2 Double frontage and reverse frontage lots shall be required for residential subdivisions along major thoroughfares where

internal access can be provided. A no-access easement of at least ten feet in width, across which there shall be no right of access, shall be provided along the line of lots abutting such a traffic artery. When located along a major thoroughfare, the no-access easement shall be planted with a single line of shrubs or trees, or contain a solid or decorative fence, or contain such other landscaping treatments or grade changes which will produce a partial screening effect, as may be proposed

by the developer. In no-access easements along minor collectors or local streets, planting or other screening treatments shall be at the sole option of the developer.

Sec. 5.6. Survey Monuments.

5.6.1 All corners shall be marked with an iron rebar or pin, at least one-half inch in diameter and 18 inches long and driven so as to extend no less than one inch above the finished grade.

5.6.2 On subdivisions containing floodplains, flood elevation references shall be set in accordance with the requirements of the Floodplain Management Ordinance.

Sec. 5.7. Standard Drawings.

5.7.1 The Department shall maintain on file for consultation and distribution a set of Standard Drawings illustrating details of construction and design of streets, storm water drainage facilities, site improvements and

other elements related to the development of land in accordance with these Regulations and under the jurisdiction of the Department.

5.7.2 The Standard Drawings shall illustrate minimum acceptable standards for land development activities authorized under these Regulations, but shall not supersede more restrictive prudent design requirements or good engineering practice as applied to specific situations on a case-bycase basis.

5.7.3 The Standard Drawings shall be treated as though a part of these Regulations for application to the minimum standards for design and construction of

improvements required herein and subject to the modification and appeal provisions of Article 13.

Sec. 5.8. Buffers, Landscaping, And Tree Preservation.

5.8.1 General Applicability The standards and requirements contained in this Section shall apply only to tree protection and replanting, landscaping, buffers, and landscape areas specifically required by County code, ordinance or resolution, and

shall not apply to general or voluntary landscaping or to open space otherwise provided on a property.

5.8.2 General Requirements Any property required by the Zoning Resolution or conditions of zoning approval to provide buffers or other specific landscaping shall do so in compliance with the standards included in the Zoning Resolution

and this Section.

a. For any such property, a Buffer and Landscape Plan shall be prepared by a Registered Landscape Architect, Urban Forester, or Arborist, and shall be approved by the Department prior to issuance of a Development Permit on the subject site.

b. At the discretion and option of the applicant, a required Buffer and Landscape Plan and a required Tree Protection Plan may be combined into a single document, as long as the details and elements of the plans can be clearly and easily identified.

c. Buffer areas or portions of buffer areas where natural vegetation provides an adequate visual screen as required by the Zoning Resolution, may remain natural and undisturbed by any clearing, grading or other construction activity except as allowed by the Development Permit.

d. In buffer areas where natural vegetation is non-existent or inadequate to provide a visual screen as required

by the Zoning Resolution, replanting or supplemental planting shall be required. The Department may also approve additional or alternative screening elements such as planted earthen berms or solid fences where appropriate to the intent of the requirements of the Zoning Resolution.

e. Planted buffers, and buffers provided with supplemental plantings, may contain any combination of evergreen plant materials having a natural survival expectancy for the Gwinnett County environment, and meeting the screening standards established in the Zoning Resolution.

f. Landscape areas or strips shall include trees to the extent required by the Zoning Resolution or conditions of zoning approval. Plant materials may be grouped to achieve aesthetic results following professional landscaping standards, provided sight distances as required by these Regulations are preserved.

g. Tree plantings required by the Zoning Resolution for parking lots shall provide a minimum landscape area of 64 square feet for each tree. However, the trees themselves may be grouped or arranged so as to achieve aesthetic results following professional landscaping standards, or may be located in landscape islands within the parking lot having an area less than 64 square feet (but being of adequate size for the tree proposed).

The total landscape area provided shall equal the number of trees multiplied by 64 square feet, shall be located in conjunction with the parking lot, and shall meet the standards of paragraph f., preceding.

5.8.3 Tree Protection Ordinance Requirements

a. Any property required to retain and protect existing trees or to plant new trees under the provisions of the Gwinnett County Tree Protection Ordinance shall do so in compliance with said Ordinance.

b. Areas set aside for the retention of existing trees or the planting of new trees, in fulfillment of any portion of the tree density standard of a property other than the property upon which the areas are located, shall be established within an easement drawn in favor of the other property, and appropriately recorded.

5.8.4 Landscaping Performance Surety In the event that the requirements of this Section have not been met at the time that a Certificate of Development Conformance otherwise could be approved by the Department, and the Certificate is requested, the Director may approve an agreement with

the owner or his agent that the provisions and requirements of these Regulations shall be met. The owner or his agent shall post a Landscaping Performance Bond or other County approved surety in an amount equal to 110 percent of the cost of materials, labor, and other attendant costs, incidental to the installation of the required landscaping as part of the owner's Development Performance and Maintenance Agreement with the County.

The surety shall:

a. Be drawn in favor of Gwinnett County.

b. Be in a form satisfactory to the County Attorney.

c. Specify the time for the completion of the landscaping, which shall not be longer than three months following Approval of the Certificate of Development Conformance or be in accordance with such other time table for completion acceptable to the Department.

Sec. 5.9. Open Space.

5.9.1 Open Space. Land for use as open space shall be provided in single-family detached subdivisions having a gross area of 25 acres or more and a minimum lot size less than 1 acre; in duplex subdivisions having a gross area of 10 acres or more; in MU developments with a residential component;

or single-family attached, townhouse, and apartment developments having a gross area of 5 acres or more. "Open space" includes pocket parks, commons, plazas, community green or lawn, greenways, and recreation areas (including, but not limited to, pools, playgrounds, and parks with active recreation facilities).

a. For each development, 5% of the gross land area shall be maintained as open space.

b. Prohibited use of open space. The following shall not be considered when calculating required open space:

1) Required setback areas.

2) Required zoning buffers

3) Environmental buffers defined in Chapter 109.

4) Required landscape strips.

5) Drainage easements and facilities, with the exception that detention facilities designed as

an amenity may be included.

6) Private yards.

7) Public street rights-of-way or private street easements, including streetscapes located within those rights-of-way or easements.

8) In addition, structures not intended for landscape or recreational purposes are prohibited to be located in open space areas.

c. In subdivisions the open space shall be deeded to a qualified Property Owner's Association, Homeowner's Association or other legal entity incorporated under the laws of Georgia. The open space shall be deeded to said entity with a restriction that the land shall be used exclusively for recreational purposes

and shall be made available to all residents of the subdivision project on an equal basis. The qualified entity shall provide for the mandatory membership of all the owners of property within the subdivision, and shall be established under the laws of Georgia; it shall be responsible for the perpetuation, maintenance and function of the open space and all uses or facilities therein. All covenants shall be recorded simultaneously with the final subdivision plat.

d. In multi-family rental or condominium projects, land provided for open space use in accordance with these requirements shall be held in the ownership of the owner of the project.

(Ord. No. 2020-551, Exh. B, 7-13-2020)

ARTICLE 6. ACCESS AND

RIGHT-OF-WAY REQUIREMENTS;

AND STREET IMPROVEMENT AND

CONSTRUCTION REQUIREMENTS

Sec. 6.1. Access.

6.1.1 When land is subdivided into larger parcels than ordinary building lots, such parcels shall be arranged and designed so as to allow for the opening of future streets and to provide access to those areas not presently served by streets.

6.1.2 No subdivision shall be designed so as to completely eliminate street access to adjoining parcels of land. Every development shall be designed to facilitate access to adjoining properties which are developed or

anticipated to be developed in a manner substantially similar to the subject property.

Locations of interparcel access shall be as required by and subject to the approval of the Department.

6.1.3 Any lot required to provide minimum frontage by the zoning district in which the lot is located shall provide vehicular access directly from a public street along the frontage or along any other property line which abuts a public street, except as provided in

Section 6.1.5.

6.1.4 Private streets as may be approved under the provisions of the Zoning Resolution shall be constructed to the roadway construction standards of Gwinnett County,

as contained herein.

6.1.5 Vehicular access easements may be provided from a public street indirectly via easement in any one or more of the following circumstances:

a. The property is not required to provide a minimum frontage by the applicable zoning district, provided that the easement shall be in a location and the access driveway shall have a

width and alignment acceptable to the Fire Services Division and the Department.

b. The property is a buildable lot of record, as defined herein, but does not meet the minimum frontage requirement of the applicable zoning district. The property must be served by an exclusive access easement which shall be limited to the provision of access to only one principal use or structure.

c. The access easement serves a singlefamily residence on a lot which is otherwise a buildable lot of record,

and which is sharing a common driveway with no more than one other single-family residence.

d. The access easement was lawfully established as such under the code, ordinances, or regulations of Gwinnett County prior to the adoption of these Development Regulations.

e. The access easement coincides with a private roadway approved under the code, ordinances, or regulations of Gwinnett County. All new private roadways must be constructed to the roadway standards of these Development Regulations, and their ownership and maintenance responsibility by private party(s) must be clearly

established on the Final Plat of the development.

f. The access easement serves a buildable lot of record which meets the minimum frontage requirements of

the Zoning Resolution, but at which point the access is not achieved.

Sec. 6.2. Streets.

6.2.1 Dedication of Street Right-of-Way Right-of-way for all abutting and internal Public streets, existing and proposed, shall be dedicated in accordance with the street classifications as shown on the Long-Range Road Classification Map of the Comprehensive Plan, or as otherwise required by the Board of Commissioners.

6.2.2 Street Improvements Streets, whether abutting or internal, existing or new, shall be constructed or improved under those circumstances and to the

standards as established in these Regulations. Roadway improvements shall be in accordance with the street classifications as

shown on the Long-Range Road Classification Map of the Comprehensive Plan, or the Zoning Resolution, as applicable, or as

otherwise required by the Board of Commissioners.

Sec. 6.3. Minimum Right-Of-Way And Street Improvements.

6.3.1 Right-of-Way and Pavement Widths Minimum widths for new construction (new streets or Project Access Improvements) shall be as shown on Table 6-A.

(unless a modification is granted by the director).

Exception: new local streets in subdivisions developed in the Conservation Subdivision Overlay District shall be as follows, unless a modification, which proposes more

progressive minimum widths, is granted by the Director:

a. Right-of-Way Width of New Interior Local Streets.

Entrance Streets: at least 46 feet.

Other Interior Streets: at least 44 feet.

Right-of-Way Radii: at least 45 feet for cul-de-sac or eyebrow turnarounds.

Alleys: no minimum if not to be dedicated to the county; at least 15 feet if to be dedicated to the county.

b. Pavement Width of New Interior Local Streets.

Entrance Streets: at least 24 feet (measured to back of curb).

Other Interior Streets: at least 22 feet (measured to back-of-curb).

Curb and Gutter: at least 1.5 feet.

Pavement Radii: at least 40 feet for cul-de-sac or eyebrow turnarounds (measured to back of curb).

Alleys: at least ten feet (concrete or asphalt), with or without curb, if not to be dedicated to the county; at least 12 feet if surfaced with asphalt (which includes 1 foot concrete curbs) and at least ten feet if surfaced with concrete (with or without curb).

(Ord. No. 011-01, 12-10-2001; Ord. No. 2014- 476, Exh. A, 10-13-2014)

6.3.2 Street Rights-of-Way

a. The minimum width of right-of-way shall be dedicated based upon the street categories as shown on the Long-Range Road Classification Map in the Comprehensive Plan and as contained in these Regulations.

b. On any existing street which abuts a property, one-half of the required width of right-of-way shall be dedicated at no cost to Gwinnett County as measured from the centerline of the roadway, along the entire property frontage.

c. Additional street right-of-way width may be required to be dedicated at intersections or other locations fronting the property where turning lanes, storage lanes, medians, or realignments are required for traffic safety and minimum right-of-way standards

would be inadequate to accommodate the improvements.

Table 6-A

MINIMUM RIGHT-OF-WAY AND ROADWAY WIDTHS

FOR NEW STREETS AND WIDENINGS

STREET CATEGORY MINIMUM RIGHT-OF-WAY MINIMUM ROADWAY Principal Arterial

Urban 120' 6 thru lanes Controlled Access 150' 6 thru lanes Major Arterial 100' undivided - 67' 100' divided - 2×29' 120' six lanes Minor Arterial Nonresidential Area 100' 66' Residential Area 80' 52' Major Collector Nonresidential Area 80' 52' Residential Area 80' 52' Minor Collector

STREET CATEGORY MINIMUM RIGHT-OF-WAY MINIMUM ROADWAY Nonresidential Area 60' 32'

Residential Area 60' 28' Local Street Nonresidential Area 60'* 32' Nonresidential Cul-de-sac 60' radius 50' radius Residential Area-Urban 50' 28' Residential Cul-de-sac 50' radius 40' radius Residential-Rural (R-140) 60' 24'** Residential-Rural Cul-de-sac 60' radius 40' radius** *Utility easement shall be provided in a location and size as required by the Gwinnett County Water System.

**Measured to edge of pavement. Curb and gutter not required in the R-140 zoning district.

d. If a new street or thoroughfare is proposed by the Comprehensive Plan or the State of Georgia to adjoin or traverse the property, the proposed road shall be accommodated into the development plans of the property in accordance with Article 5 of these Regulations. These rights-of-way requirements shall govern except where there exist clearly defined plans of the Georgia Department of Transportation or Gwinnett County which require additional rights-ofway. In that case, the greater rightof-way requirements shall govern.

6.3.3 Street Widenings - Single Family Detached Residential Subdivisions

a. When property fronting on an existing or proposed County road is to be veloped or redeveloped as a singlefamily or duplex subdivision and the property provides access to the County

road, roadway improvements (pavement, curb and gutter) are required to bring the County road up to a typical

standard section in accordance with the classification of the road and the standards of these Regulations. Associated drainage improvements as deemed necessary by the Department

shall also be required.

b. Required widening and curb and gutter shall be provided from the centerline of the roadway along the

side of the road upon which the property abuts, and along the entire property frontage.

c. The developer shall be responsible for the relocation of public or private utilities and drainage structures as may be occasioned by the required roadway improvements.

d. Exceptions:

(1) Subdivisions with double frontage lots along an abutting existing major or minor collector or arterial road, and which are limited to interior street access, shall provide a minimum 12 feet of

pavement width from existing centerline, grading for a shoulder of at least 11 feet in width, and to provide the necessary surface drainage facilities flowing to a ditch section along the entire property frontage (See Standard Drawings). It shall further be required to provide a deceleration lane 26

feet from centerline to back of curb for a distance of no less than 200 feet from the centerline of each subdivision ingress/egress along with additional 50 foot taper.

Additional right-of-way as may be necessitated by these improvements shall be acquired by Gwinnett County at the expense of the subdivider.

(2) Any subdivision with property fronting on an existing County road for which there exists clearly defined plans of the Georgia Department of Transportation or Gwinnett County shall be exempt from design and may be exempt from part or all construction of the widening of the County road at the discretion of the Board

of Commissioners. In such cases, the dollar equivalency of improvement requirements (including curbing, utility relocation, and

drainage structures), as estimated by the Director of Engineering, shall be deposited in the Engineering Department's appropriate road construction account prior to the Approval of Development

Conformance or within 30 days of County award of a construction contract, whichever occurs first.

(3) In such other cases as may be required by or acceptable to the Director of Engineering, in lieu of part or all of the required widening, the dollar equivalency of the street improvement requirement

(including curbing, utility relocation, and drainage structures), shall be deposited in the Engineering Department's appropriate road construction account prior to the Approval of Development

Conformance or within 30 days of County award of a construction contract, whichever occurs first.

6.3.4 Street Widenings - Single Family Attached, Multi-Family, and Nonresidential Developments

a. When property fronting on an existing or proposed County road is to be deAPPENDIX B—DEVELOPMENT REGULATIONS § 6.3 veloped or redeveloped for multi-family or nonresidential purposes, if access is gained directly from the street, roadway improvements (pavement and

curb and gutter) are required along the said road across the entire property frontage at least in accordance with the classification of the road and

the standards of these Regulations.

Associated drainage improvements as deemed necessary by the Department shall also be required.

b. Required widening and curb and gutter shall be provided from the centerline of the roadway along the

side of the road upon which the property abuts. (NOTE: If the abutting street is substandard, a drainage swale

ditch, shoulder, and adequate base shall be provided and the roadway paved on the opposite side of the road from the project, 12 feet from centerline to edge of pavement. Please refer to Section 6.3.6, Substandard Streets, for additional information.)

c. The Developer shall be responsible for the relocation of public or private utilities and drainage structures as may be occasioned by the required roadway improvements.

d. Exceptions:

(1) Developments with no access along an abutting street, shall improve the adjacent street 12 feet from the existing centerline, shall provide grading for a shoulder of at least 11 feet in width, and shall provide the necessary

surface drainage facilities flowing to a ditch section (See Standard Drawings).

(2) Any development with property fronting on an existing or proposed County road for which there exists clearly defined plans of the

Georgia Department of Transportation or Gwinnett County shall be exempt from design and may

be exempt from part or all construction of the widening of the County road at the discretion of

the Board of Commissioners. In such cases, the dollar equivalency of improvement requirements (including curbing, utility relocation, drainage structures),

as estimated by the Director of Engineering, shall be deposited in the Engineering Department's appropriate road construction account prior to the Approval of Development Conformance or

within 30 days of County award of a construction contract, whichever occurs first.

(3) In such other cases as may be required by or acceptable to the Director of Engineering, in lieu of part or all of the required widening, the dollar equivalency of the street improvement requirement

(including curbing, utility relocation, and drainage structures) shall be deposited in the Engineering Department's appropriate road construction account prior to the Approval of Development

Conformance or within 30 days of County award of a construction contract, whichever occurs first.

6.3.5 New Streets

a. All new streets proposed to be constructed in a subdivision or other development, whether to be public or private, shall be designed and constructed at least to the standards contained in these Regulations in accordance with the category of said streets.

b. If a new street or thoroughfare is proposed by the Comprehensive Plan or the State of Georgia to traverse the property, the proposed road shall be constructed in accordance with the street category as shown in the Comprehensive Plan and contained in these Regulations, or as shown on plans

proposed by the County or State of Georgia.

c. If the facility is to be a limited or controlled-access roadway and access to the property from the street or thoroughfare will not be allowed by the State or the County, the improvements shall not be required. The specific vertical and horizontal alignment of the proposed roadway shall be as

established or approved by the Engineering Department. Funds may be paid for the improvements in lieu of

actual construction under the same terms as for street widenings (See Sections 6.3.3 or 6.3.4, as applicable).

d. As provided in Article 13 of these Regulations, the developer may file a Waiver application seeking relief from this Section or participation in the costs by the County.

e. In residential subdivisions, a dead end ("stub") street required under Section

6.4.4 to provide access to an abutting property may be exempted from construction of roadway improvements and public utilities under the following circumstances:

(1) No lot within the proposed subdivision will gain access from the "stub" street.

(2) A Concept Plan has not been submitted or approved on the neighboring tract.

(3) The "stub" street shall be fully designed as part of the Development Plans. However, the rightof-way shall only be cleared and rough graded in accordance with

the approved plans, and all disturbed areas grassed.

(4) Connections for future extension of all public utilities shall be constructed as part of the subdivision. Curb returns shall be provided to the future "stub" street roadway location, and curb and

gutter shall be installed across the roadway stub at the right-ofway line (extended).

(5) The right-of-way for the "stub" street shall be dedicated as part of the Final Plat. Slope easements or construction easements, if required by the street design,

shall be shown on the Final Plat.

6.3.6 Substandard Streets

a. In the event that a development has access to a substandard street (i.e., is a dirt or gravel road), the following improvements shall be required:

(1) If the abutting substandard street provides the primary means of access to the development and is dirt or gravel, the street shall be upgraded to a standard paved roadway from the end of the improvements required under a(2), below, to the nearest standard

paved road along the route of primary access.

(2) Along the entire length of the property frontage where the access is other than primary, in addition to the road widening requirements of Section 6.3.3 or 6.3.4, as applicable, along the entire property frontage, a drainage swale ditch, shoulder, and adequate base shall be provided

and the roadway paved on the opposite side of the road from the project, 12 feet from centerline to edge of pavement.

b. Off-site improvements required under a(2), above, shall, at a minimum, result in a full-section roadway meeting the requirements of a Local Residential Rural roadway (24 feet edge to edge of pavement, with drainage swale

ditches as needed). Responsibilities shall be as follows:

(1) The Developer shall design the road and provide the labor, equipment, and materials required for roadway improvements and necessary drainage improvements.

(2) If the County desires the roadway to be improved to a standard greater than that for a Local Residential-Rural roadway, the County shall provide or pay the

cost of the additional materials and labor.

(3) All right-of-way required for these off-site improvements shall be acquired by the County at the expense of the developer.

6.3.7 Improvements Along State Highways For any development which abuts a state highway or other right-of-way controlled by the State of Georgia, improvements to the roadway and the location and design of any street or driveway providing access from the state highway shall comply with the standards and requirements of the Georgia Department of Transportation only when more restrictive than the requirements of these

Regulations. A permit for the proposed access or improvements shall be required to have been approved by the Georgia D.O.T. and incorporated into the construction drawings for the project prior to issuance of a development permit by the Department.

Sec. 6.4. General Layout Requirements.

6.4.1 Conformance The arrangement, character, extent, width, grade, and location of all streets shall conform at a minimum to the Comprehensive Plan and these Regulations.

6.4.2 Local Streets and Minor Collectors Local streets shall be so laid out that their use by through traffic will be discouraged.

Minor collectors shall be provided to channel through traffic movements within a development, where appropriate to the design and a major thoroughfare is not proposed by the

Comprehensive Plan. Minor collectors also may be provided as central routes within large residential subdivisions, where appropriate to the design, based on projected traffic demands exceeding 2000 trips per day

(ADT).

6.4.3 Cul-de-sac Streets

a. Dead end streets designed to have one end permanently closed shall provide a cul-de-sac turnaround and may be no more than 2000' in length. Additional length necessitated by topography or property configuration may be approved by the Director.

b. The length of a cul-de-sac street shall be measured from the center of the cul-de-sac to the center of the intersection with another street, whether a through street or another cul-de-sac

or dead-end street.

c. Eyebrow cul-de-sacs (half cul-de-sacs) will be allowed only at "right-angled" intersections having an interior angle between 80 degrees and 100 degrees.

d. Cul-de-sacs shall conform to the layout and dimensional requirements as shown in the Standard Drawings.

6.4.4 Other Dead End Streets

a. A dead end street shall be provided to the boundary of a subdivision where necessary to provide access to a landlocked abutting property, for planned continuity of future circulation, for

improved access for public safety vehicles, or for the extension of public water or other utilities to neighboring

lands. Such dead end streets shall be designed so as to allow their reasonable extension, and shall be located so as to be reasonably incorporated into

a street design for the neighboring property. The stub street requirement may be waived by the Director, provided the Directors of the Departments of Public Safety and Public Utilities concur.

b. Dead end streets on abutting property shall be extended into a proposed subdivision and incorporated into the street design of the development. This

requirement may be modified by the Director in cases of serious topographical hardship or dissimilar zoning which would create unacceptable land

use conflicts between the two developments. This modification may be conditioned on the provision of easements necessary for the extension of public

utilities, the provision of a cul-de-sac or other permanent turnaround on the dead end street, or the removal of the dead end street back to its nearest intersection.

c. Where a dead-end street (other than a cul-de-sac) serves more than three lots, the developer shall be required to provide a temporary vehicular turnaround within the right-of-way. This requirement may be waived if extension of the dead-end street is approved and

under construction prior to its inclusion in a Final Plat.

d. Where a street dead ends at the property boundary and the street exceeds 1000' in length, a permanent cul-desac shall be required. In this situation, right-of-way to the property boundary shall be required, but the

pavement shall not be extended to the property boundary beyond the edge of the paved cul-de-sac turnaround. In no case shall a dead end street exceed 2000' in length unless approved by the Department due to unusual topographic conditions or property configuration.

6.4.5 Service Roads Where a development borders on or contains a railroad right-of-way, or limited access highway right-of-way or major thoroughfare, a public street may be required to be constructed and dedicated within the development approximately parallel to and on each side of such right-of-way.

6.4.6 Half-Streets Half-streets (new boundary streets having one-half of the minimum required right-ofway or pavement width) shall not be allowed nor access to same be permitted should it

exist.

6.4.7 Reserve Strips Land in private ownership adjacent to public rights-of-way which could control or are intended to control access to streets, alleys,

or public lands shall not be permitted unless their control is given to the County under ownership, dedication, or easement conditions approved by the County Attorney or acceptable to the Director. No development

shall be designed so as to deny access to abutting properties.

6.4.8 Alleys Alleys shall not be provided except where the subdivider produces evidence satisfactory to the Director of the need for same. In the event the Director approves a design

which proposes alleys, the alley shall be constructed as though it were a local street pursuant to the standards contained in these Regulations.

6.4.9 Street Jogs

a. Street jogs shall either directly align or have offsets of a minimum of 125 feet for residential subdivision streets and a minimum of 200 feet for nonresidential subdivision streets, as measured between centerlines of said streets.

b. All major thoroughfares shall provide offsets as required by the Department, where alignment is not desirable or feasible, but in no case be spaced less than 600 feet apart as

measured between centerlines of said streets.

Sec. 6.5. Traffic Control Devices.

6.5.1 Traffic Control Signals Street signs, traffic control signs, and devices such as striping and signalization, shall be provided through payment of fees to the

Engineering Department for the installation thereof.

6.5.2 Street Name Signs Street name signs shall have a green background with white legends mounted on channelized posts. Alternate post material shall be subject to the review and approval of the

Traffic Engineer. The posts and signs will be furnished and installed by the County at all street intersections. The developer (or homeowners association in the event an alternate signpost is chosen at a later date) shall pay the County's costs.

6.5.3 Traffic Signals and Signs All traffic signals and signs shall conform to the Manual on Uniform Traffic Control Devices (no decorative traffic control devices will be allowed).

6.5.4 Striping Requirements All newly constructed streets having 4 or more lanes (including auxiliary lanes) and existing streets being widened with one or more additional lanes shall be striped or the payment of said striping costs shall be required from the Developer by the Engineering Department prior to the Approval of Development Conformance for the project.

Striping shall be accomplished with paint meeting Georgia DOT standards conforming to the Manual on Uniform Traffic Control Devices.

6.5.5 Payment of Fees Payment for materials and installation of street name and traffic control signs in new developments shall be required by the Engineering Department prior to the Approval of Development Conformance.

6.5.6 Street Lights The installation of all street lighting fixtures within County right-of-way must be approved by the Engineering Department

prior to such installation.

Sec. 6.6 Specifications.

Unless otherwise specifically set forth herein, all of the materials, methods of construction, and workmanship for the work covered in reference to street construction

shall conform to the latest specifications of the Georgia Department of Transportation (Georgia DOT).

Sec. 6.7. Subgrade Preparation For All Streets.

6.7.1 Subgrade preparation shall be in accordance with Georgia DOT specifications and these Regulations.

6.7.2 If any sections of the subgrade are composed of topsoil, organic, or other unsuitable or unstable material, such material shall be removed and replaced with suitable

material and then thoroughly compacted as specified for fill or stabilized with stone or a geo-textile or geo-grid.

6.7.3 Fill shall be placed in uniform, horizontal layers not more than eight inches thick (loose measurement). Moisture content shall be adjusted as necessary to compact material to 95 percent of maximum dry density except for the top 12 inches which shall be compacted to 100 percent of maximum dry density.

6.7.4 After the earthwork has been completed, all storm drainage, water, and sanitary sewer utilities have been installed within the right-of-way as appropriate, and the backfill in all such ditches thoroughly compacted, the subgrade shall be brought to the lines, grades, and typical roadway section shown on the plans.

6.7.5 Utility trenches cut in the subgrade shall be backfilled as specified herein.

Compaction tests at the rate of one per 150 feet of trench shall be provided to verify compaction.

6.7.6 The subgrade must pass roll testing prior to placement of the base material.

With the approval of the Department, a geo-textile or grid may be used to stabilized a subgrade that does not pass proof rolling.

6.7.7 When the street is to be used for construction traffic before the paving work is completed, a layer of stone (except crusher run) shall be laid as a traffic surface. This material shall not be used as a part of the base material. It may be worked into the subgrade, or it shall be removed before the base course is set up for paving.

6.7.8 Provisions shall be made to drain low points in the road construction when the final paving is delayed. A break in the berm section is required when the curbing has not been constructed. After installation, drainage under the curb to side slopes is required, using minimum four-inch diameter pipe sections or alternative means or method approved by the Director of Planning and

Economic Development (i.e. vegetated swales).

(Ord. No. 2014-476, Exh. A, 10-13-2014) Sec. 6.8. Road Widening.

6.8.1 For sections wider than four feet, the widening section shall comply with the construction standards for new streets, in accordance with the street's category as shown on the Comprehensive Plan. The base course must pass roll testing prior to paving. If a delay in paving is reasonably expected by the Developer or the Department, the base shall be primed with 0.25 gallon of R.C. 70 per square yard and cured

for seven days before paving.

For road sections less than four feet wide, eight inches of Class A concrete base (5 inches on local and minor collector streets) and one and one-half inches of E or F topping shall be required.

Sec. 6.9. New Local And Minor Collector Streets.

6.9.1 Local and Minor Collector Streets Within a Residential Subdivision.

a. Asphalt Streets - The following types of base materials may be used:

i) Crushed Stone Base

a) Two-Pass Street: The base course shall consist of at § 6.9 least six inches of graded ageregate base. After being thoroughly compacted and brought to proper section two and one-half inches of "B" binder shall be applied.

If a delay in paving is reason- ably excepted by _ the Developer or the City, the base shall be primed with

0.25 gallon of R.C. 70 per square year the same day it is compacted, and cured for seven days prior to paving.

The final one and one-half inches of type "E" or "F" wearing course shall be applied after 90 percent of the houses on the street have been built, or prior to the end of the maintenance period (but after the 11th month), whichever occurs first. Prior to applying wear- ing course, a tack coat shall be applied to the binder course at a rate of no less than 0.05 gallons per square yard. Type of tack shall be approved by the City prior to placement.

6.9.2 Local Residential-Rural Roads Where allowed (in the R-140 zoning district and upgrading off-site substandard streets), local residential-rural roads do not require curb and gutter. The road base shall be extended one foot beyond the edge of pave- ment, and the shoulders shall extend eight feet from edge of pavement to a standard ditch section on each side (see Standard Drawings). Otherwise, the roadway shall comply with the standard for new residential subdivision streets, above.

6.9.3 Nonresidential Development Streets Subdivision or The following standards shall apply to new local and minor collector streets in nonresidential subdivision and _ other nonresidential projects:

a. Asphalt Streets - The following types of base materials may be used:

1) Two-Pass Street (Crushed Stone Base): The base course shall consist of at least seven inches of graded aggregate base. After being thoroughly compacted and brought to proper section two and one-half inches of "B" binder shall be applied. If a delay in paving is reasonably expected by the Developer or the City, the base shall be primed with 0.25 gallon of R.C. 70 per square yard the same day it is compacted, and cured for seven days prior to paving. The final one and one- half inches of type "E" or "F" wearing course shall be applied after 90 percent of the buildings on the street have been built, or prior to the end of the maintenance period (but after the 11th month), whichever occurs first. Prior to applying wearing course, a tack coat shall be applied to the binder course at a rate of no less than 0.05 gallons per square yard. Type of tack shall be approved by the City prior to placement.

Sec. 6.10. New Major Thoroughfares.

6.10.1 Minor collectors abutting a residential or nonresidential project and major thoroughfares shall be constructed in accordance with designs prepared by Gwin- nett County or Georgia DOT, or, if no design has been prepared, to the following standards:

Table 6-B

CONSTRUCTION STANDARDS FOR MAJOR THOROUGHFARES

STREET CATEGORY BASE BINDER TOPPING

Principal Arterial 10" GAB 5"* 1 1/2" E or F Major Arterial 10" GAB 4" B 1 1/2" E or F Minor Arterial 10" GAB 3" B 1 1/2" E or F Major Collector 10" GAB 3" B 1 1/2" E or F Minor Collector 8" GAB 2" B 1 1/2" E or F *2 1/2" type "B" binder and 2 1/2" asphaltic concrete base.

Sec. 6.11. Curb And Gutter.

6.11.1 All new streets or street widening sections shall be provided with curb and gutter except in residential subdivisions zoned R-140, where swale ditches may be provided in lieu of curbing. All gutters shall drain smoothly with no areas of ponding.

b. Typical minimum section shall be six inches × 24 inches × ten inches for roll-back curb and six inches × 24 inches × 12 inches for vertical curb.

6.11.2 RESIDENTIAL CURBING

a) (No change)

b) Typical minimum section shall be six inches × 24 inches × 12 inches

c) Vertical curbing only (Res. of 8-9-1993)

6.11.3 Industrial or Commercial Curbing

a. Concrete shall be Class "A" (as defined by Georgia D.O.T.) and have a minimum strength of 3,000 PSI at 28

days.

b. Typical section shall be eight inches × 24 inches × 14 inches.

c. Vertical curbing only.

6.11.4 Principal Arterial and Major Arterial Curbing

a. Concrete shall be Class "A" (as defined by Georgia D.O.T.) and have a minimum strength of 3,000 PSI at 28

days.

b. Typical section shall be eight inches × 30 inches × 14 inches.

c. Vertical curbing only.

6.11.5 Construction Methods:

a. Curb and gutter shall be set true to line and grade, horizontal be filed staked, and finished to the section shown on the plans. Along the widening section of a road which the Engineering Department has identified for resurfacing within one year of the

construction, the grade of the new gutter shall be placed one inch above the widening pavement grade in areas where drainage will not be adversely affected.

b. Line and grade shall be set by developer's engineer or surveyor on grades less than two percent and over 12 percent, and within 100 feet in both directions from all low points.

c. One-half inch expansion joints or premolded bituminous expansion joint material shall be provided at all structures and radius points and at intervals not to exceed 250 feet in the remainder of the curb and gutter.

d. Inferior workmanship or unprofessional construction methods resulting in unacceptable curb and gutter will

be cause for rejection of the finished work.

e. Disturbed areas along all curbing shall be backfilled, stabilized, and grassed.

Sec. 6.12. Undergound Utilities.

6.12.1 All water and sanitary sewer utilities and storm drain facilities within the curbs shall be installed and the ditches

backfilled and thoroughly compacted before any pavement or base is installed.

6.12.2 Once the base has been placed, all further installation of utilities under the roadway shall be bored or otherwise comply with Section 7.5, Street Cuts.

6.12.3 All utility manholes and valve boxes shall be brought flush to the finished grade within the roadway section.

6.12.4 All utility locations shall adhere to the details found in the Standard Drawings.

Sec. 6.13. Sidewalks.

6.13.1 Where Required

a) (No Change)

b) Sidewalks shall also be required along any developments road frontage in accordance with this Section along the following roads:

1) Arcado Road

2) Beaver Ruin Road

3) Burns Road

4) Camp Creek Road

5) Dickens Road

6) Harbins Road

7) Harmony Grove Road

8) Hillcrest Road

9) Indian Trail - Lilburn Road

10) Killian Hill Road

11) Lawrenceville Highway (U.S.

Highway 29)

12) Lilburn-Stone Mountain Road

13) Luxomni Road

14) Main Street

15) Old Highway 29

16) Pleasant Hill Road

17) Poplar Street

18) Railroad Avenue

19) Rockbridge Road

20) Shady Drive

21) W. Johns Road (Res. of 5-8-1989)

6.13.2 Sidewalk Design and Construction Standards.

a. Location

1. Sidewalks shall be required adjacent to both sides of internal subdivision streets in all subdivisions.

2. Sidewalks shall be located in front of water lines and other easements. Any other arrangement will require a waiver of the Development Regulations from the City Council.

b. Setback.

Sidewalks shall be located at least two feet from the back of curb except in conservation subdivisions or subdivisions in which street trees are provided (bridges excepted). Sidewalks in conservation subdivisions or in subdivisions in which street trees are provided shall be located at least six feet from the back of curb (bridges excepted). The area between the curb and the sidewalk shall consist of grass

or landscaping.

Where no curb exists, or if road improvements are proposed for installation by the county, sidewalks, including appropriate drainage facilities, shall be constructed in a location

acceptable to the Department of Transportation.

(Res. of 2-8-1993; Ord. No. 011-01, 12-10- 2001)

6.13.3 Design Standards

a) Sidewalks shall be located two feet from the back of curb. Where no curbing exists or proposed road improvements are anticipated, sidewalks shall be placed in a location acceptable to the Department of Transportation.

b) All new sidewalks shall match and provide a smooth transition to any existing sidewalks with no steps.

c) Sidewalks shall be constructed of concrete and shall be a minimum of four feet in width (for interior roads) and five feet in width (on other streets) and four inches thick. Concrete shall be Class A (as defined by Georgia DOT) and have a strength of 3,000 PSI at 28 days.

d) Curb ramps shall be provided at all curb termini and shall be a minimum of four feet in width exclusion of flared sides.

e) Expansion joins shall be provided at all property lines (extended) and driveway crossings. Control joint shall be provided every ten feet.

f) Disturbed areas resulting from sidewalk construction shall be backfilled, stabilized, and grassed.

(Res. of 2-8-1993)

6.13.4 Installation Deadlines Sidewalks shall be installed prior to the issuance of a Certificate of Occupancy or Final Plat approval in accordance with this Subsection unless a performance bond is posted. The cost of sidewalk installation may be set aside in escrow where proposed road improvements may impact the location of the sidewalk.

a) Sidewalks required on residential building lots shall be installed prior to issuance of a Certificate of Occupancy for each individual dwelling.

b) Sidewalks required on common or recreation areas shall be installed prior to Final Plant approval.

c) Sidewalks required on other projects shall be installed prior to issuance of a Certificate of Occupancy or Certificate of Completion, as appropriate.

(Res. of 2-8-1993) Sec. 6.14. Street Lights.

Street lights shall be required along all interior streets of residential subdivisions.

Lights shall be located within the rights-ofway and shall be of the type and spacing approved by the utility company of jurisdiction. Type and spacing shall also be approved by Gwinnett County and the city.

(Res. of 7-10-1995)

ARTICLE 7. UTILITIES AND

EASEMENTS

7.1.1 All authorized public underground utilities shall be located within the right-ofway of a public street or within an easement designated for such use. Within public street

rights-of-way, placement of the various authorized utilities (power, gas, cable TV, water and sewer) shall conform to the specific locations designated for such use by Gwinnett County, as illustrated in the Standard Drawings.

7.1.2 No other underground utilities, such as lawn sprinkler systems, private yard lighting, etc., shall be installed within a public right-of-way or easement except by authorization of the Department. Such authorization, if issued, shall require the applicant to assume all repair costs of the applicant's facilities should they be damaged during the course of installation, maintenance or repair of any of the public

utilities authorized to occupy said right-ofway or easement.

Sec. 7.2. Water System And Fire Hydrants.

7.2.1 The developer shall install or have installed a system of water mains connected to a public water supply system in accordance with the requirements of the authority having jurisdiction.

7.2.2 All water mains, fire hydrants and appurtenances shall be designed in accordance with the policies, standards, plans and specifications of the Gwinnett County Fire Prevention Ordinance and the water system having jurisdiction. Where jurisdiction resides with the Gwinnett County Water System, the public water mains and

appurtenances shall be designed by the County Water System upon submittal of the Development Plans for the project.

7.2.3 Within the Gwinnett County Water System jurisdiction, water mains and appurtenances shall be installed after installation of the curbs and gutters and before paving, or after staking of the curb line and

submission to the Water System of an asgraded survey of the street profile accompanied by a certification executed by

the owner as required by the Water System that the subgrade will not change. Water mains shall be relocated as necessary to meet Water System regulations prior to Approval of Development Conformance, if improperly located to final curb line or grade.

Sec. 7.3. Sanitary Sewage Disposal.

7.3.1 A permitted connection to an approved sewage disposal system shall be made, which may require the construction of an on-site system as required by the Gwinnett County Health Department or the extension of public sanitary sewerage and associated appurtenances as required by

Gwinnett County Department of Water Resources (DWR).

7.3.2 All structures shall connect to a public sewer when such sewer is available, in accordance with the Sewer Regulation of Gwinnett County. Sewer availability shall be determined by the Gwinnett County DWR or the Gwinnett County Health Department.

7.3.3 Private Wastewater Disposal.

Approval by Gwinnett County Health Department. Before an individual on-site sewage disposal system is installed, the owner must

first obtain plan approval and permit from the County Health Department.

a) The owner of a private system shall maintain the system in a sanitary manner at all times and in such manner that a nuisance is not created.

7.3.4 The Gwinnett County Health Department may require notation that certain lots must meet additional requirements prior to

issuance of a building permit, or otherwise limit development relative to Health Department regulations.

a) Such lots may include lots upon which adequate depth to water table must be demonstrated during the appropriate season of the year, adequate percolation tests must be performed,

limitations upon the number of bedrooms in a dwelling, etc.

b) No lot shall be included on a Final Plat which the Health Department is not confident will meet all Health Department regulations at a reasonable cost or within a reasonable period of time, except lots proposed to be

served by sanitary sewer in subdivision where dry sewer has been installed. Such lots shall be noted -

Approval by Gwinnett County DWR for connection to sanitary sewer required prior to issuance of a building permit.

7.3.5 New Communal sewage disposal prohibited in the city, notwithstanding any and all provisions of GA state code (Ga.

Comp. R. & Regs., chapter 290-5-26). If a property does not use an individual on-site sewage disposal system, it must be connected to a sewer leading to the POTW.

1. Communal sewage disposal system shall mean any private decentralized wastewater collection, treatment or disposal system that: (1) serves more than one residence or property, or (2) flows between more than one parcel or tract of land. It may consist of collector lines, pumps, sewage tanks and/or soil treatment units.

(Ord. No. 2019-543, 12-9-2019) Sec. 7.4. Easements.

7.4.1 Temporary construction easements and permanent easements for public utilities, drainage or other public facilities shall be dedicated to Gwinnett County in

accordance with County Requirements. All easements shall be grassed as appropriate for soil stabilization.

7.4.2 Drainage easements are required for any part of the drainage system that is designed to carry storm water runoff from more than one parcel, existing or proposed.

Drainage easements for natural drainage features, improved ditches, pipe construction, and detention facilities shall be cleared, opened, and stabilized at the time of development to control surface water run-off (See also Article 8). Run-off slope and sideslopes

shall be specified by the Developer's Engineer, according to good engineering practice. Drainage easements for storm drain pipes that carry water shall be provided according to

the minimum requirements found in Table 7-A below, and shall conform to City Standards. The minimum easement width shall be based on the pipe diameter (span) plus two feet plus two times the pipe invert depth. This value shall be rounded up to the nearest five feet. For pipes exceeding 16 feet in depth, a pre-submittal conference shall be held with the City to determine what additional requirements may be required.

(Ord. No. 2014-476, Exh. A, 10-13-2014)

TABLE 7-A

EASEMENTS FOR STORM DRAIN PIPES

PIPE

SIZE

(FT)

MAXIMUM PIPE INVERT DEPTH (FT)

MINIMUM EASEMENT WIDTH (FT)

4 5 6 7 8 9 10 11 12 13 14 15 16

1.25 20 20 20 20 20 25 25 30 30 30 35 35 40

1.5 20 20 20 20 20 25 25 30 30 30 35 35 40

2.0 20 20 20 20 20 25 25 30 30 30 35 35 40

2.5 20 20 20 20 25 25 25 30 30 35 35 35 40

3.0 20 20 20 20 25 25 25 30 30 35 35 35 40

3.5 20 20 20 25 25 30 30 30 35 35 40 40

4.0 20 20 20 25 25 30 30 30 35 35 40 40

4.5 20 25 25 25 30 30 35 35 35 40 40

5.0 20 25 25 25 30 30 35 35 35 40 40

5.5 25 25 30 30 30 35 35 40 40 40

6.0 25 25 30 30 30 35 35 40 40 40 (Ord. No. 013-01, 12-10-2001)

7.4.3 Permanent sanitary sewer easements shall be no less than 20 feet in width when no other parallel utilities are located

therein. When warranted, temporary construction easement widths shall be determined by the Water Pollution Control Division.

7.4.4 A common 30-foot wide easement for sanitary sewer and drainage purposes may be allowed if the pipes are parallel and at least ten feet is provided between pipes (on center).

7.4.5 Drainage Easements shall be provided where a development is traversed by or contains a water course, impoundment, detention pond, floodplain, natural stream or channel. It shall conform

substantially to the limits of such natural drainage feature, but shall be no less than 20 feet in width.

7.4.6 Drainage Easements off the street right-of-way shall be clearly defined on the Final Plat. The property owner will be required to keep the easement free of obstruction in such a way as to assure the maximum designed flow at all times. The property

owner shall not alter any drainage improvements without the prior written approval from the County.

7.4.7 All drainage, sewer, access or other easements which were required to be cleared shall be fine graded and grassed within ten days of completing construction work. The use of sediment control measures may be required to protect the area until a comprehensive vegetative cover is obtained.

Sec. 7.5. Street Cuts.

7.5.1 All utility construction plans within County right-of-way shall be reviewed and approved by the Department before construction begins. Street cuts shall not be allowed unless deemed absolutely necessary due to

the presence of rock, the need to tap into an existing line beneath the road surface, or other circumstance which makes boring impossible or infeasible.

7.5.2 No street cut shall be authorized until such Street Cut Fees have been paid.

7.5.3 If approved, all trenches shall be backfilled and compacted the same day the trench is opened.

a. Trenches under the paving shall be returned to 95 percent compaction.

b. Trenches elsewhere shall be returned to 90 percent compaction.

c. See Section 6.7 for trench compaction and test requirements.

7.5.4 All trenches under paving shall be concreted with eight inches of Class "A" concrete base and one and one-half inch of type "E" or "F" wearing course asphalt is to be spread.

a. The paving cut shall be widened to a minimum of nine inches beyond the edges of the trench.

b. The edges of the paving cut shall be smooth.

7.5.5 Contact the Department or Department of Public Utilities for public utility extension information from the existing to

the proposed development. Contact the Traffic Engineer at least 24 hours in advance of closure of traffic lanes.

7.5.6 The 'Standard Detail: Utility CutPaver Street,' dated December 16, 2025, is hereby adopted as a required restoration

standard for any utility trenching or pavement cuts within the Railroad Avenue rightof-way where the existing surface consists of concrete pavers constructed in accordance

with City of Lilburn standards and associated base materials. The purpose of this standard is to ensure that cobblestone and

paver street sections disturbed by utility work are restored with matching pavers, base, bedding, and jointing materials to preserve appearance, ride quality, and longterm pavement performance.

In addition to Railroad Avenue, this standard shall apply to any current or future public street, or portion thereof, constructed with a substantially similar concrete paver street section. including use of removable pavers, setting bed, base, geotextile, trench bedding, and flowable fill, as determined by the City Engineer or their designee. On all such streets, contractors shall comply with the general requirements and layer specifications shown on the 'Standard Detail: Utility Cut-Paver Street,' including manual extraction and reinstallation of pavers, use of flowable fill or approved alternate backfill,

minimum trench widths and depths, and restoration of any disturbed pavement markings or devices.

(Ord. No. 2026-663, 1-12-2026)

ARTICLE 8. SITE GRADING AND

POST CONSTRUCTION

STORMWATER MANAGEMENT*

Sec. 8.1. Site Grading.

8.1.1 Grading shall be done in accordance with the lines and grades shown on the approved Grading Plan.

8.1.2 Grading plans shall show existing and proposed contour lines at an interval of no more than two feet. Grading plans shall outline the areas which are required to remain undisturbed (i.e., Tree Protection Areas, buffers, etc.) and shall indicate protective fencing or staking to be placed surrounding such areas.

8.1.3 Embankment layering shall be consistent with the Gwinnett County Stormwater Management Manual.

8.1.4 The maximum slopes for cut or fill shall be 2:1 (two feet of horizontal run for each foot of rise or fall), except 1) for earthen dam embankments, 2) for rock cuts, 3) where certified by a professional geotechnical engineer or 4) as discussed in Section 8.1.5 below.

8.1.5 Earthen dam embankments shall be 3:1 maximum unless a modification application is approved. The intent of the earthen dam embankment slope regulation is to provide for public safety, soil stability, and dam maintenance considerations. The depth of cut referred to herein shall be the maximum cut or fill that shall be allowed to occur in any one section of cut or fill. The slope of cut or fill shall be uniform throughout for each section of cut or fill unless benching is approved by the city.

8.1.6. A grading plan showing building pad locations shall be submitted for residential subdivisions, unless a modification application is approved. The intent of this regulation is to ensure adequate lot to

lot drainage. Granting a modification will not nullify the intent of these regulations.

The grading plan may be used as a construction document prior to approval of the Final Plat or as a guidance document for individual

lot grading after approval of the Final Plat.

(Ord. No. 2020-557, Att. A, 11-9-2020) Sec. 8.2. Post-Construction Stormwater Management.

8.2.1 Purpose and Intent. The purpose of this Article is to protect, maintain and enhance the public health, safety, environ- ment and general welfare by establishing minimum requirements and procedures to control the adverse effects of increased postconstruction stormwater runoff and nonpoint source pollution associated with new development and redevelopment. Proper

management of post- construction stormwater runoff will minimize damage to public and private property and infrastructure,

safeguard the public health, safety, environment, and general welfare of the public, and protect water and aquatic resources.

Additionally, the City of Lilburn is required to comply with several State and Federal laws, regulations and permits and the requirements of the Metropolitan North Georgia Water Planning District's regional water plan related to managing the water quantity, velocity, and quality of postconstruction stormwater runoff.

8.2.2 Adoption and Implementation of the GCSMM; Conflicts and Inconsistencies.

a. In implementing this Article, the City of Lilburn shall use and require compliance with all relevant design standards, calculations, formulas, methods, and other guidance from the Gwinnett County Stormwater Management Manual (GCSMM) as well as all related appendices.

b. This Article is not intended to modify or repeal any other Section, ordinance, rule, regulation or other provision of law, including but not limited to any applicable stream buffers under state and local laws, and the Georgia Safe Dams Act and Rules for Dam Safety.

In the event of any conflict or inconsistency between any provision in the City of Lilburn's MS4 permit and this Article, the provision from the MS4 permit shall control. In the event of any conflict or inconsistency between any provision of this Article and the GCSMM, the provision from this Article shall control. In the event of any other conflict or inconsistency between any provision of this Article and any other ordinance, rule, regulation or other provision of law, the provision that is more restrictive or

imposes higher protective standards for human health or the environment shall control.

c. If any provision of this Article is invalidated by a court of competent jurisdiction, such judgment shall not affect or invalidate the remainder of this Article.

8.2.3 Designation of Administrator. The City of Lilburn Planning and Development Department (P&D) shall implement this Article but may, from time to time, appoint someone to administer and implement this Article.

8.2.4 Applicability Criteria for Stormwater Management Standards. This Article applies to the following activities:

a. New development that creates or adds 5,000 square feet or greater of new impervious surface area or that involves land disturbing activity of 1 acre of land or greater;

b. Redevelopment (excluding routine maintenance and exterior remodeling) that creates, adds, or replaces 5,000 square feet or greater of new

impervious surface area or that involves land disturbing activity of 1 acre or more;

c. New development and redevelopment if

(i) such new development or redevelopment is part of a subdivision or other common plan of development, and (ii) the sum of all associated impervious surface area or land disturbing activities that are being developed as part of such subdivision or other common plan of development meets or exceeds

the threshold in (a) and (b) above;

d. Any commercial or industrial new development or redevelopment, regardless of size, that is a hotspot land use as defined in this Article;

and

e. Linear transportation projects that exceed the threshold in (a) or (b) above.

8.2.5 Exemptions from Stormwater Management Standards. This Article does not apply to the following activities:

a. Land disturbing activity conducted by local, state, authority, or federal agencies, solely to respond to an emergency need to protect life, limb, or property or conduct emergency repairs;

b. Land disturbing activity conducted by local, state, authority, or federal agencies, whose sole purpose is to implement stormwater management or environmental restoration;

c. Repairs to any stormwater management system deemed necessary by the administrator;

d. Agricultural practices as described O.C.G.A. 12-7-17(5) within areas zoned for these activities with the exception of buildings or permanent structures that exceed the threshold in 8.2.4 (a) or (b);

e. Silvicultural land management activities as described O.C.G.A. 12-7-17(6) within areas zoned for these activities with the exception of buildings or permanent structures that exceed the

threshold in 8.2.4 (a) or (b);

f. Installations or modifications to existing structures solely to implement Americans with Disabilities Act (ADA)

requirements, including but not limited to elevator shafts, handicapped access ramps and parking, and enlarged entrances or exits; and

g. Linear transportation projects being constructed by the City of Lilburn to the extent the Department determines that the stormwater management standards may be infeasible to apply, all or in part, for any portion of the linear transportation project. For this exemption to apply, an infeasibility report shall first be submitted to the Department that contains adequate documentation to support the evaluation for the applicable portion(s) and any resulting infeasibility

determination, if any, by the Department.

8.2.6 Stormwater Management Standards.

Subject to the applicability criteria in Section 8.2.4 and exemptions in Section 8.2.5, the following stormwater management

standards apply.

a. Design of Stormwater Management System: The design of the stormwater management system shall be in accordance with the applicable sections of the GCSMM and/or as directed by the administrator. Any design

which proposes a dam shall comply with the Georgia Safe Dams Act and Rules for Dam Safety as applicable.

b. Natural Resources Inventory: Site reconnaissance and surveying techniques shall be used to complete a thorough assessment of existing natural resources, both terrestrial and aquatic, found on the site. Resources to be identified, mapped, and shown on the Stormwater Management Plan, shall include, at a minimum (as applicable):

(i) Topography (minimum of 2-foot contours) and Steep Slopes (i.e., Areas with Slopes Greater Than 15%), (ii) Natural Drainage Divides and Patterns, (iii) Natural Drainage Features (e.g., swales, basins, depressional areas), (iv) Natural feature protection and conservation areas such as wetlands, lakes, ponds, floodplains, stream buffers, drinking water wellhead protection areas and river corridors,

(v) Predominant soils (including erodible soils and karst areas), and (vi) Existing predominant vegetation including trees, high quality habitat and other existing vegetation.

c. Better Site Design Practices for Stormwater Management: Stormwater management plans shall preserve the

natural drainage and natural treatment systems and reduce the generation of additional stormwater runoff and pollutants to the maximum extent

practicable.

d. Stormwater Runoff Quality/Reduction: Stormwater Runoff Quality/ Reduction: For projects submitted on

or after January 8, 2018, the applicant shall provide runoff reduction in accordance with the requirements of the Gwinnett County Stormwater Management Manual. To the extent Runoff Reduction has been determined to be infeasible for all or a portion of the site using the Planning and Development Practicability Policy, then water quality shall apply for the remaining runoff from a 1.2 inch rainfall event. The design professional shall schedule a meeting with Planning and Development when

requesting removal or reduction of the runoff reduction requirement.

(i) Runoff Reduction - The stormwater management system shall be designed and sized to retain the

first 1.0 inch of rainfall on the site using runoff reduction methods, to the maximum extent practicable. Runoff reduction practices are stormwater best management practices, BMPs, used to disconnect impervious and disturbed pervious surfaces from the stormwater drainage system to reduce the postconstruction stormwater runoff rates, volumes, and pollutant

loads. If the Runoff Reduction cannot be met in whole or in part, then the water quality standards shall be used to treat the remainder.

(ii) Water Quality-The stormwater management system shall be designed to detain or treat the runoff from 85% of the storms that occur in an average year and reduce the average annual post-development total suspended solids (TSS) loadings by 80% in order to meet the water quality requirement. The water quality requirement can be waived if the entire 100% of runoff reduction is provided. Water quality and runoff reduction can also be provided in conjunction in order to meet the water quality requirements outlined in the Gwinnett County Stormwater Management Manual (GCSMM)

(iii) If a site is determined to be a hotspot as detailed in Section 8.2.4, the City of Lilburn may require the use of specific or additional components for the stormwater management system to address pollutants of concern generated by that site.

e. Stream Channel Protection. The increase in the frequency and duration of bankfull conditions in stream channels due to urban development

is the primary cause of stream bank erosion and the widening and downcutting of stream channels. Channel protection is not required if the post

development discharges are less than 2 cfs at each individual discharge location for the 1-yr storm event.

Stream channel protection shall be provided by using all of the following three approaches:

(i) 24-hour extended detention storage of the 1-year, 24-hour return frequency storm event. This standard is intended to reduce the frequency, magnitude, and duration of post-development bankfull conditions.

The volume to be detained is also known as the channel protection volume (CPv).

(ii) Erosion prevention measures, such as energy dissipation and velocity control to prevent downstream erosion and stream bank damage.

(iii) Preservation of any applicable stream buffer.

Stream buffers not only provide channel protections but also water quality benefits and protection of stream side properties from flooding.

f. Overbank Flood Protection:

Downstream overbank flood protection shall be provided by controlling the post-development peak discharge

rate to the pre-development rate for the 25-year, 24-hour storm event.

g. Extreme Flood Protection: Extreme flood protection shall be provided by controlling the 100-year, 24-hour storm event such that flooding is not exacerbated.

h. Downstream Analysis: Due to peak flow timing and runoff volume effects, some structural components of the stormwater management system fail to reduce discharge peaks to predevelopment levels downstream from the site. A downstream peak flow

analysis shall be provided to the point in the watershed downstream of the site or the stormwater management system where the area of the site comprises 10% of the total drainage area in accordance with Section 3.1.9 of the GCSMM. This is to help ensure that there are minimal downstream impacts from development on the site.

The downstream analysis may result in the need to resize structural components of the stormwater management system.

i. Stormwater Management System Inspection and Maintenance: The components of the stormwater management system that will not be dedicated to and accepted by the City of Lilburn, including all drainage facilities, best management practices, credited conservation spaces, and conveyance systems, shall have an inspection and maintenance agreement to ensure that they continue to function as designed. All new development and redevelopment sites are to prepare a comprehensive inspection

and maintenance agreement for the on-site stormwater management system. This plan shall be written in accordance with the requirements in Section 8.2.15.

8.2.7 Pre-Submittal Meeting, Stormwater Concept Plan, and Stormwater Management Plan Requirements.

a. Before a land development permit application is submitted, a pre-submittal meeting with the City of Lilburn Planning Department is required. The

pre-submittal meeting should take place before site analysis and inventory. The purpose of the pre-submittal meeting is to discuss opportunities, constraints, and ideas for the stormwater management system before formal site design engineering.

Applicants must request a pre-submittal meeting with the City of Lilburn when applying for a Determination of

Infeasibility through the Practicability Policy.

b. The stormwater concept plan shall be prepared using the minimum following steps:

(i) Develop the site layout using better site design techniques, as applicable.

(ii) Perform screening and preliminary selection of appropriate best management practices and identification of potential

siting locations.

c. The stormwater concept plan shall contain:

(i) Common address and legal description of the site, (ii) Vicinity map, and Existing conditions and proposed site layout which illustrate at a minimum:

(iii) Existing and proposed topography (minimum of 2-foot contours), (iv) Perennial and intermittent streams,

(v) Mapping of predominant soils from USDA soil surveys, (vi) Boundaries of existing predominant vegetation and proposed limits of clearing and grading, (vii) Approximate location and boundaries of other natural feature protection and conservation areas such as wetlands, lakes, ponds, floodplains, stream

buffers and other setbacks (e.g., drinking water well setbacks, septic setbacks, etc.), (viii) Location of existing and proposed roads, buildings, parking areas and other impervious surfaces,

(ix) Existing and proposed accommodations for utilities (e.g., water, sewer, gas, electric),

(x) Preliminary selection and location, size, and limits of disturbance of proposed BMPs,

(xi) Location of existing and proposed conveyance systems such as grass channels, swales, and storm drains, (xii) Location of the boundaries of the base flood floodplain, futureconditions floodplain, and the floodway (as applicable) and

relationship of site to upstream and downstream properties and drainage, and (xiii) Preliminary location of proposed channel modifications, such as bridge or culvert crossings.

d. The stormwater management plan shall contain the items listed in this part and be prepared and certified by a qualified professional licensed in the State of Georgia. Items (iii), (iv), (v), and (vi) shall be sealed and signed by a registered professional engineer licensed in the state of Georgia. The overall site plan must be stamped by a design professional licensed in the State of Georgia for such purpose.

(i) Natural Resources Inventory.

(ii) Stormwater Concept Plan.

(iii) Existing Conditions Hydrologic Analysis. For any stormwater analysis, the composite "C" (Rational Method) or CN (SCS Method) used for analysis of predevelopment conditions shall be consistent with those shown in

the Gwinnett County Stormwater Management Manual.

(iv) Post-Development Hydrologic Analysis. Analysis of the off-site properties shall anticipate future development in addition to addressing existing conditions.

(v) Stormwater Management System.

(vi) Downstream Analysis. For the purposes of these regulations, the words "downstream" and "analysis" shall have the following meanings. The analysis of downstream conditions in the

report shall address each and every point or area along the project site's boundaries at which runoff will exit the property. The analysis shall focus on the portion of the drainage way "immediately" downstream from

the project. This area shall extend downstream from the project to a point in the drainage basin where the project area is 10 percent of the total basin area. The analysis shall be in accordance

with the Gwinnett County Stormwater Management Manual.

(vii) Erosion and Sedimentation Control Plan. (See Section 109 Article III, Soil Erosion, Sedimentation and Pollution Control ordinance) (viii) BMP Landscaping Plan prepared by a registered professional.

(ix) Inspection and Maintenance Agreement.

(x) Evidence of Acquisition of Applicable Local and Non-Local Permits.

(xi) Determination of Infeasibility (if applicable).

e. For redevelopment and to the extent existing stormwater management structures are being used to meet stormwater management standards, the following must also be included in the stormwater management plan for existing stormwater management structures.

(i) As-built Drawings.

(a) A new survey, drawing and certification showing that the outlet structure is constructed as approved, will function as designed, and the flood storage and water quality volume of the facility is equal to or greater than the volume required

when the facility was approved.

(ii) Hydrology Reports.

(iii) Current inspection of existing stormwater management structures with deficiencies noted.

(iv) BMP Landscaping Plans if required at time of BMP construction.

8.2.8 Application Fee. The fee for review of any land development application shall be based on the fee structure established by the City of Lilburn and payment shall be made at the time of application or building permit for the development.

8.2.9 Application Procedures. Land development applications and permit shall be obtained pursuant to the Zoning Ordinance Article 12 and the Development Regulations, or a building permit shall be obtained per Zoning Ordinance Section 1202, and the

Development Regulations Article 4. Before any person begins development on a site, the owner of the site shall first obtain approval in accordance with the following procedure:

a. Submit a land development permit application to the City of Lilburn on the city's application form with the following supporting materials:

(i) the stormwater management plan prepared in accordance with Section 8.2.7 (d), (ii) a certification that the development will be performed in accordance with the stormwater

management plan once approved, (iii) a Preliminary Determination of Infeasibility, as applicable, prepared in accordance with the practicability policy], and (iv) an acknowledgement that the applicant has reviewed the City of Lilburn's Inspection and Maintenance Agreement and that applicant agrees to sign and record such Inspection and Maintenance Agreement before the Certificate of Occupancy/ Approval.

b. The administrator shall inform the applicant whether the application and supporting materials are complete and approved or incomplete or denied or disapproved.

c. If the application or supporting materials are disapproved, the administrator shall notify the applicant of such fact in writing. The applicant may then revise any item(s) not meeting the requirements hereof and resubmit the same for the administrator to again consider and either approve or disapprove.

d. If the application and supporting materials are approved, the City of Lilburn may issue the associated land disturbance permit or building permit, provided all other legal requirements for the issuance of such permits have been met including acquisition of all applicable non-local permits and Gwinnett County approvals. The stormwater management plan included in such applications becomes the approved stormwater management plan.

8.2.10 Compliance with the Approved Stormwater Management Plan. All development shall be:

a. consistent with the approved stormwater management plan and all applicable land disturbance and building permits, and

b. conducted only within the area specified in the approved stormwater management plan.

No changes may be made to an approved stormwater management plan without review and advanced written approval by the administrator.

8.2.11 Inspections to Ensure Plan Compliance During Construction. Periodic inspections of the stormwater management system during construction shall be conducted by

the staff of the City of Lilburn or conducted and certified by a professional engineer or a Level 2B certified third party inspector who has been approved by the City of Lilburn.

Inspections shall use the approved stormwater management plan for establishing compliAPPENDIX B—DEVELOPMENT REGULATIONS § 8.2 ance. All inspections shall be documented

with written reports that contain the following information:

a. The date and location of the inspection;

b. Whether the stormwater management system is in compliance with the approved stormwater management plan;

c. Variations from the approved stormwater management plan; and

d. Any other variations or violations of the conditions of the approved stormwater management plan.

8.2.12 Final Inspection; As-Built Drawings, Delivery of Inspection and Maintenance Agreement. Upon completion of the development, the applicant is responsible for:

a. Certifying that the stormwater management system is functioning properly and was constructed in conformance with the approved stormwater management plan and associated hydrologic analysis.

The required certification under part

(a) shall include a certification of volume, or other performance test applicable to the type of stormwater management system component, to ensure each component is functioning as designed and built according to the design specifications in the

approved stormwater management plan. This certification and the required performance tests shall be performed by a qualified person and submitted to the City of Lilburn with the request for a final inspection.

The City of Lilburn shall perform a final inspection with applicant to confirm applicant has fulfilled these responsibilities.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:lilburn/zoning/whole@2026-11-11-9dc83d57b4

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.