In any commercial or industrial zoning district, where a commercial or industrial lot abuts any adjacent nonconforming residential use within that district, the required buffer for the commercial or industrial property when acquiring a building permit unless the buffer was preexisting, shall consist of a 50-foot setback from the adjoining property line containing not less than a 20-foot base width consisting of plantings plus a wall (not otherwise part of a structure or accessory building), fence or a berm, or any combination thereof, which meets the screening standards in section 46-187.