--- title: Lovejoy Zoning Ordinance, 802.7. Special administrative permitted structures and uses for RA district collection: local-codes id: local-code:lovejoy/zoning/802.7 cite_as: Lovejoy, Ga., Zoning Ordinance § 802.7 canonical_url: https://georgiacommons.org/code/local/lovejoy/zoning/802.7 md_url: https://georgiacommons.org/code/local/lovejoy/zoning/802.7.md text_url: https://georgiacommons.org/code/local/lovejoy/zoning/802.7/text source_url: https://library.municode.com/ga/lovejoy/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:lovejoy jurisdiction_name: Lovejoy place_fips: "1347616" corpus_version: local-codes-lovejoy-af944e75bb6f publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/lovejoy/zoning/~appendix-a/~article-viii.md previous: https://georgiacommons.org/code/local/lovejoy/zoning/802.4.md next: https://georgiacommons.org/code/local/lovejoy/zoning/803.md index: https://georgiacommons.org/code/local/lovejoy.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:lovejoy/zoning/802.7@2026-11-11-88e61a95e5 --- # Lovejoy Zoning Ordinance, 802.7. Special administrative permitted structures and uses for RA district > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - ZONING / Article VIII - SCHEDULE OF DISTRICT REGULATIONS Upon application to and favorable decision thereon by the city manager as provided for in this subsection and article XVIII of this appendix, the following special administrative permitted structures ad uses specified below are permitted, provided that their establishment promotes the health, safety, morals and general welfare of the city. A) Technology uses, including data centers, network operations centers, and utility substations supporting data centers subject to the following: Dimensional Standards Minimum Acreage 325 acres Minimum Lot Width 150 feet Minimum Setbacks Front: 50 feet Side: 0 feet Dimensional Standards Rear: 0 feet Maximum Height 120 feet Minimum Parking n/a Maximum Parking 4 per 1,000 square feet Parking for Data Centers shall be calculated only on interior floor area designated as office space and shall not include floor area used for server storage and operation. Minimum Green Space 10 percent of gross site area Stream Buffers All buffers and setbacks shall be measured horizontally from the edge of the stream channel. 25 feet State Buffer 25 feet Undisturbed Buffer 50 feet Impervious Buffer Impervious Stream Setback 100 feet No buildings, pavement, or other impervious surfaces shall be located within 100 feet of the stream bank. This setback includes the 25 feet undisturbed buffer. Impervious Lake Buffer All buffers shall be measured horizontally from the edge of any lake. 25 feet Outdoor Storage Screening shall be required for the keeping outdoors of any goods, materials, merchandise, or equipment for more than 24 hours whether for storage, display, processing, or sale, and may include support materials for a Data Center including, but not limited to, air handlers, power generators, water cooling and storage facilities, utility substations, transformers, and other associated utility infrastructure to support Data Center operations. Architectural Standards Exterior Walls All exterior walls of buildings shall be constructed of durable materials such as tilt-up concrete, precast concrete, architectural concrete block, brick, or metal panels with architectural treatment. No plain, unadorned metal or unpainted concrete panels shall be permitted on elevations visible from a public right-of-way. 1) Additional standards. In addition to the dimensional and architectural standards, the following standards shall also apply to data centers, network operations centers, and utility substations supporting data centers: a. Phasing of development for data centers is permitted provided that the data center project cannot be built in more than 15 phases. b. A 50 foot graded and replanted buffer is to be maintained between any data center on the subject property and any residentially-zoned properties in the city. c. The data center shall be enclosed by a freestanding fence with a minimum height of six feet along any public street right-of-way. d. Any and all substations shall be at least 25 feet from any public street right-of-way and shall be screened with a six foot high privacy fence with a double row of six foot tall evergreen trees. e. All electric generators, natural gas/electric turbines, transformers and/or related equipment providing primary power (including on-site generation) for the benefit of the data center affixed to the ground but not housed inside a building or structure may operate 24/7/365 and shall be at least 25 feet from any public street right-of-way and enclosed behind a solid wall made of a sound absorbing material and must be a minimum of one foot higher than the highest point on the enclosed equipment. The wall shall be painted or finished with decorative or artistic material. f. Prior to the issuance of the first building permit, a noise study shall be provided to the city demonstrating that the operation of the data center will comply with the following standards: i. The data center shall not generate noise in excess of 95dB(A) or 20dB(A) above ambient levels (whichever is greater), when measured at the common property boundary line shared with a residential use. g. Fiber and broadband infrastructure must be accessible to surrounding residential and commercial users. h. All external dumpsters and trash compactors shall be located to the rear of buildings or located within a building or parking structure. i. Lighting shall be downward and not interfere with the night sky. j. Parcel frontage along public right-of-way shall be fenced with sturdy fencing material, industrial security fence. No barbed wire fencing. k. A letter indicating the availability of water/sewer and electricity shall be delivered to the city before being issued a land disturbance permit. l. The entire parcel shall be landscaped in accordance with article IX, section 901. m. A site plan shall be submitted in accordance with article XI, section 1102. n. There shall be a maximum of 15 buildings on the entire parcel. B) High density dwellings. High density dwellings include live/work dwellings, multifamily, cottage units, single-family dwellings, and townhome dwellings and when developed according to the dimensional standards and architectural standards listed in the following table: Dimensional Standards Minimum Lot Width 12.5 feet Minimum Setbacks Front: 15 feet Side: 0-10 feet Attached single-family and multi-family residences may have a side yard setback of zero feet between dwelling units. Detached single-family residences may have a building separation of no less than three feet between dwelling units. Rear: 15 feet Maximum Height 40 feet Minimum Dwelling Size 450 square feet heated space Maximum FAR 10.0 Maximum Density 15 units per acre Minimum Green Space 15 percent of gross site area Minimum Parking One per bedroom Maximum Parking Two per bedroom Minimum Garage Requirement No garage Maximum Garage Requirement Two car garage Stream Buffers All buffers and setbacks shall be measured horizontally from the edge of the stream channel. 25 feet State Buffer 25 feet Undisturbed Buffer 50 feet Impervious Buffer Impervious Stream Setback 100 feet No buildings, pavement, or other impervious surfaces shall be located within 100 feet of the stream bank. This setback includes the 25 feet undisturbed buffer. Impervious Lake Buffer All buffers shall be measured horizontally from the edge of any lake. 25 feet Architectural Standards Front Facade Elevations Mixture of brick, shake, board & batten, stacked stone, vinyl siding and/or fiber cement siding Side and Rear Facade Elevations Fiber-cement siding or vinyl siding 1) Additional standards. In addition to the dimensional and architectural standards, the following standards shall also apply to high density dwellings: a. A letter indicating the availability of water/sewer and electricity shall be delivered to the city before being issued a land disturbance permit. b. The entire parcel shall be landscaped in accordance with article IX, section 901. c. A site plan shall be submitted in accordance with article XI, section 1102. ## History (Ord. No. 2018-01, § 1(802), 1-8-2018; Ord. No. 2025-05, §§ 3, 4, 11-17-2025)