--- title: Macon-Bibb County Charter, Sec. 2-501. Definitions collection: local-codes id: local-code:macon-bibb/charter/2-501 cite_as: Macon-Bibb County, Ga., Charter § 2-501 canonical_url: https://georgiacommons.org/code/local/macon-bibb/charter/2-501 md_url: https://georgiacommons.org/code/local/macon-bibb/charter/2-501.md text_url: https://georgiacommons.org/code/local/macon-bibb/charter/2-501/text source_url: https://library.municode.com/ga/macon-bibb_county/codes/code_of_ordinances date: 2026-11-14 status: active jurisdiction: consolidated:macon-bibb jurisdiction_name: Macon-Bibb County place_fips: "1349008" county_fips: "13021" corpus_version: local-codes-macon-bibb-73fe370ed452 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/macon-bibb/charter/~part-i/~chapter-2/~article-v/~division-8.md previous: https://georgiacommons.org/code/local/macon-bibb/charter/2-474-to-2-500.md next: https://georgiacommons.org/code/local/macon-bibb/charter/2-502.md index: https://georgiacommons.org/code/local/macon-bibb.md branch: charter edition: As published by Municode, retrieved 2026-11-14 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:macon-bibb/charter/2-501@2026-11-14-699832c630 --- # Macon-Bibb County Charter, Sec. 2-501. Definitions > As published by Municode, retrieved 2026-11-14 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part I - RELATED LAWS [OF BIBB COUNTY] / Chapter 2 - ADMINISTRATION / Article V - BOARDS, COMMISSIONS AND AUTHORITIES / Division 8 - MACON WATER AUTHORITY As used in this act, the term: (1) Authority shall mean the Macon Water Authority created by section 2-502. (2) Cost of the project shall embrace the cost of construction, the cost of all lands, properties, rights, easements, and franchises acquired, the cost of all machinery and equipment, financing charges, interest prior to and during construction, and for one year after completion of construction, the cost of engineering, architectural, fiscal, and legal expenses, and of plans and specifications, and other expenses necessary or incident to determining the feasibility or practicability of the project, administrative expenses, and such other expenses as may be necessary or incident to the financing authorized in this division, the construction of any project, the placing of the same in operation, and the condemnation of property necessary for such construction and operation. Any obligation or expense incurred for any of the foregoing purposes shall be regarded as a part of the cost of the project and may be paid or reimbursed as such out of the proceeds of revenue bonds issued under the provisions of this division for such project. (3) Project shall mean and include the acquisition and construction of systems, plants, works, instrumentalities, and properties: a. Used or useful in connection with the obtaining of a water supply and the conservation, treatment, distribution, and sale of water for public and private uses; or b. Used or useful in connection with the collection, treatment, and disposal of sewage and like waste water; together with all parts of any such system, plant, work, instrumentality, and property and all appurtenances thereto, including lands, easements, rights in land, water rights, contract rights, franchises, approaches, dams, reservoirs, generating stations, sewage disposal plants, intercepting sewers, trunk, connecting, and other sewers and water mains, filtration works, pumping stations, and equipment. �Project� shall also include all things used or useful in connection with the performance of any of the contracts with respect to industrial development as authorized in [subsection 2-504(19.1)]. (4) Revenue bonds and bonds shall mean revenue bonds authorized to be issued pursuant to this division. (5) Self-liquidating shall mean that the revenues and earnings to be derived by the authority therefrom and all properties used, leased, and sold in connection therewith will be sufficient to pay the cost of operating, maintaining, repairing, improving, and extending the project and to pay the principal and interest of the revenue bonds which may be issued for the cost of such project or projects. ## History (1992 Ga. Laws (Act No. 665), page 4991, § 1(4); 1999 Ga. Laws (Act No. 296), page 4991, § 2)