ground shall be covered with material that is suitable and adequately functional to adequately protect the underside of the modular home and to keep the modular home from being unsightly. The owner of the modular home is responsible for skirting. The skirting shall be installed only after the inspection of the modular home by the County Inspector and a Certificate of Occupancy has been issued. The skirting shall then be installed within thirty (30) days of the issuance of the Certificate of Occupancy. 6.10 All electrical, plumbing, and heating and air connections, improvements and repairs shall be made by an individual licensed by the State of Georgia.