Skip to content
Georgia Commons
Menu

Macon County · Zoning Ordinance

Appendix A - ZONING / Article IV - GENERAL PROVISIONS

Sec. 8. One Principal Building.

About this text

  • As published by Municode, current through 2020-08-20
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Per lot except as otherwise provided herein, only one single-family, detached dwelling and its customary accessory structures shall hereafter be placed or erected on any residential lot. For the purpose of supporting farming operations there shall be permitted in the Agriculture district one (1) secondary residential use per each ten (10) acres on a farm under single ownership (maximum of eight secondary residences) where the following conditions can be met:

1. Each secondary residence can be established only for persons directly supporting farming operations or for siblings and/or their spouses.

2. Each secondary residence shall occupy a land area of not less than one acre reserved for the specific use of said residence.

3. Each such land area shall be identified by permanent, physical markers and assigned an address in accordance with the county's system of addressing rural properties.

4. Each such land area shall receive approval from the county health department as to its suitability as a site for an effective sanitary sewage disposal system designed to accommodate wastes generated by occupants of said site.

5. A domestic water supply which satisfies the rules and regulations administered by the county health department shall be made available to each secondary residence.

6. No commercial use of this special provision shall be permitted.

7. Each secondary residence shall have a minimum road frontage of 100 feet;

have direct access to the public thoroughfare system.

8. Individual power supply sources shall be provided to each secondary residence, and each utility installation shall meet such standards as have been adopted by appropriate, local authorities.

9. Secondary residences shall meet the requirements of local construction codes established by the Macon County Board of Commissioners.

10. Any change in use or occupancy must be approved by the Zoning Administrator.

11. Permits for construction will not be issued prior to approval of each of the aforementioned conditions, as applicable.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:macon-county/zoning/8@2020-08-20-3d30d72cd3

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Macon County Zoning Ordinance, Sec. 8. One Principal Building | Georgia Commons