Macon County · Zoning Ordinance
Appendix A - ZONING / Article XVIII - NONCONFORMING USES
Sec. 9. Nonconforming Salvage Yards—Expansion and Screening.
About this text
- As published by Municode, current through 2020-08-20
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
All nonconforming salvage yards shall be made to conform with the general provisions of this ordinance within a two-year period of ordinance adoption. Salvage yard expansion and screening requirements follow:
1. A buffer eight (8) feet high and eight (8) feet deep is required along the full perimeter of the salvage yard. If constructed, the buffer must be of wood, concrete or other materials approved by the Zoning Commission. If planted, the vegetation selected must be of a species and variety which, with the required proper maintenance, will reach a minimum height of eight feet within five years of planting. Both types of buffer must be maintained so as to block the view of the salvage yard, and help deflect, muffle or absorb noise generated by activities in the salvage yard.
2. Screening is intended to shield the view and reduce audible noise levels of salvage yards from surrounding properties and roadways, and to protect surrounding properties from fire. Modification of these requirements may be granted at the discretion of the Zoning Commission when the requested modification does not contravene the intent of these regulations. Requests for modification must be filed with the Zoning Officer and require a public hearing.
3. No salvage yard existing at the time this ordinance is adopted shall be expanded unless it meets requirements for screening.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.