Skip to content
Georgia Commons
Menu

Madison · Zoning Ordinance

Article V - GENERAL STANDARDS FOR ALL DISTRICTS

580.3. Commercial and Industrial Districts – P-1, P-2, C-1, C-2, C-3, C-4, I, I-1, I-2.

About this text

  • As posted on the city's website, retrieved 2026-11-14

(1) Noise. Sound levels will be measured with a sound level meter and associated band filter manufactured according to standards prescribed by the American Standards Association, or its successors. Measurements will be made using the flat network of the sound level meter. Impulse type noises will be subject to the performance standards prescribed herein, provided that such noises are capable of being accurately measured, and will be those noises which cause rapid fluctuations of the needle of the sound level meter with a variation of no more than plus or minus two (2) decibels. Noises incapable of being so measured such as those of an irregular and intermittent nature, must be controlled so as not to become a nuisance to adjacent uses.

The sound pressure level of any use, activity, process or operation, other than background noises, such as the operation of motor vehicles or other transportation facilities, must not exceed the decibel limits set forth below when measured at the property line of the lot on which it is located:

Read this code where it is posted (city website) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:madison/zoning/580.3@2026-11-14-8df97cb2ba

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Madison Zoning Ordinance, 580.3. Commercial and Industrial Districts – P-1, P-2, C-1, C-2, C-3, C-4, I, I-1, I-2 | Georgia Commons