Prior to the issuance of a Certificate of Occupancy, by the Building Inspector, all manufactured homes shall: 1) Be registered with the Morgan County Tax Commissioner and the Tax Decal be installed on the manufactured home. 2) Receive approval of the septic system by the Morgan County Health Department or be connected to the Madison waste water system. 3) Receive approval for all zoning, construction and setup requirements for the installation of the manufactured home.