In addition to the requirements of Section 1125.1(1), the application must include: (1) Plans for the mitigation of the excessive use of water and/or wastewater capacity (as defined by the Building & Zoning administrator), if anticipated to use or generate: (a) one hundred thousand (100,000) or more gallons of water per day; and/or (b) one hundred thousand (100,000) or more gallons of wastewater per day. (2) Traffic Study (as defined by the Georgia Department of Transportation’s Design Policy Manual), if anticipated to include or generate sixty-five (65) or more Annual Average Daily Truck Traffic (AADTT) for vehicles in classes 4 through 13 in the Federal Highway Administration’s (FHWA’s) 13-category vehicle classification system. (3) Hazard Mitigation Plan (as defined by the US Environmental Protection Agency), if subject to SARA Title III. (4) Noise Study (as defined by American Association of State Highway and Transportation Officials), if applicable. (5) Plans for the mitigation of any excessive odors and/or light emitted by the use, if applicable. (6) Development of Regional Impact report, if applicable.