Skip to content
Georgia Commons
Menu

Manchester · Zoning Ordinance

Appendix B - DEVELOPMENT ORDINANCE / Chapter 3 - PROCEDURE

Section 3.05. Construction improvements plan/plat; required information.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A. The plat shall have the following information:

1. Description:

a. Proposed name of subdivision, including unit, phase, and lines separating phases and/or units.

b. Names, addresses, and telephone numbers of subdivider, engineer, landscape architect, and surveyor.

Show 24-hour contact person.

c. Graphic scale, north arrow, and date:

the north point shall be identified as magnetic, true, or grid north.

d. Location map showing the relationship of the subdivision site to the surrounding area, including directions and distances to readily identifiable landmarks in the surrounding area.

e. Acreage to be subdivided.

f. Number of lots.

g. Density in dwellings per acre [gross].

h. Total lineal feet of roads [per phase and total].

i. Zoning district of the property, including all setback provisions, as well as any special conditions of zoning imposed by the city (i.e., lots sizes, number of lots, minimum house size).

2. Existing conditions:

a. Topographic contours and vertical intervals of not more than two feet when a new street is involved in a subdivision including outline of wooded areas, vegetation, and surface drainage.

b. Topographic data shall be based on field survey or aerial survey.

c. Deed record names and addresses of adjoining property owners or subdivision, along with zoning of the adjacent parcels.

d. In case of a re-subdivision, a copy of existing plat with proposed resubdivision imposed thereon.

e. Show whether or not any portion of the project is in a 100-year flood plain or contains known statutory wetlands.

f. Location of existing and platted property lines, location, width, and names of all platted roads, railroads, utility rights-of-way, public areas, existing buildings or structures.

g. Existing sewers, water mains, drains, culverts or other underground facilities within the tract or within the right-of-way of boundary roads with

sizes, grades, and invert elevations from field surveys or other sources.

All sizes and data on all utilities shall be provided.

h. Location of streams, lakes, wetlands, and land subject to a 100-year flood hazard, including contour elevations. State if elevations are taken from a surveyed stream on a FEMA

map or if the elevations are from an independent study (HEX-2, QUICK-2, etc.). Wetland areas shall be field located.

i. Notation that live streams and/or wetlands lie/do not lie within this subdivision, or unit, or phase.

Provide a copy of wetlands delineation report from a registered soil scientist in the State of Georgia.

j. Existing drainage patterns. The boundaries of the pre-developed drainage basins shall be shown on a map. The map shall include the number of acres in each basin, the pre-developed runoff coefficient, and the time of concentration.

3. Proposed conditions:

a. Layout and names of proposed roads, alleys, public walkways/bikeways (i.e., sidewalks, trails, paths, bicycle facilities), with width of pavement and rightsof-way.

b. Lot dimensions, including lot area. Lots with detention ponds must meet minimum zoning area requirements outside the area of the detention pond. Show all existing and proposed easements. Show drainage easements for storm drainage pipes which cross individual lots.

c. Flood elevations on any lots within a 100-year flood hazard area. In addition, the foundation footing elevation that is a minimum of one foot above the established 100-year flood elevation shall be shown.

This data may be shown either on the lot layout or in tabular form.

d. Construction plans of streets including typical cross section and grade profiles.

Show percent of each grade and length of each vertical curve. The minimum centerline stopping sight distance for interior streets is 200 feet.

e. Show the centerline stopping distance for all points of access onto county roads.

Show posted speed limit of existing roads.

f. Construction plans of storm drainage systems with pipe sizes, length, grade, location of outlets, runoff and velocity calculations, etc. All storm drainage systems carrying off-site runoff shall be designed for the 100-years storm event.

All storm pipes within the county rightof-way shall be asphalt coated corrugated metal pipe.

g. Improvements construction plan of water supply system with pipe sizes and location of hydrants, valves, and all appurtenances.

h. Improvement construction plan of sanitary sewers with grades, service, pipe size, and points of discharge and connection to other trunk or lateral sewers.

i. Easements for drainage and future sanitary sewers along all side and rear lot lines.

j. Proposed soil erosion and sedimentation control.

k. Final contours. In some cases, the street profiles will suffice in showing the amount of cut and fill; however, in many cases, final contours need to be shown on the plans.

l. Stormwater management. A hydrological study should be included and the necessary outlet control structures should

be shown on the plan. No increase in runoff or velocity will be permitted. Attach engineer's certification that the improvements will not adversely impact downstream properties.

m. Proposed drainage patterns. The boundaries of the post-developed drainage basins shall be shown on a map. The map shall

include the number of acres in each basin, the post-developed runoff coefficient, and the time of concentration.

n. Show a five-foot high fence on all detention ponds with a 100-year ponding elevation over four feet.

o. Detail drawings. Any structural practice used should be explained and illustrated with detail drawings and must, at a minimum, meet city standards.

p. Show the following notes on all plans:

1) A 20-foot storm sewer and sanitary sewer easement exists along each property line and along each lot line, centered on lot lines, for future drainage lines.

2) All storm drains shall be extended a minimum of 30 feet behind any future residence or building.

3) Grade stakes shall be set on all streets prior to any street grading.

An as-built subgrade centerline profile shall be submitted and approved by city prior to the installation of curb and gutter or waterlines.

4) An as-built detention pond detail and revised hydro study shall be submitted to the city prior to installation of the water line or curb and gutter.

5) All undisturbed buffers shall be field located; staked and flagged or marked with "tenzar" (or similar type fencing); and shall be submitted to the city for approval prior to grading.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:manchester/zoning/3.05@2026-11-11-667a202739

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Manchester Zoning Ordinance, Section 3.05. Construction improvements plan/plat; required information | Georgia Commons