Skip to content
Georgia Commons
Menu

Manchester · Zoning Ordinance

Appendix B - DEVELOPMENT ORDINANCE / Chapter 4 - IMPROVEMENT STANDARDS

Section 4.27. Subdivision access control.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A. Any subdivision that has an entrance onto a state highway, major arterial, minor arterial, or collector road shall provide lanes for acceleration/deceleration, ingress and egress, with the exception of the Mountain Springs zoning district

which shall not be required to provide such lanes unless required by the Georgia Department of Transportation.

B. Acceleration and deceleration lanes.

Acceleration/deceleration lanes are required at all entrances to subdivisions and industrial or commercial developments. Acceleration/deceleration lanes shall be 12 feet in width plus curb and gutter for a minimum distance of 150 feet with a

75-foot taper for the acceleration lane. Intersection radius must be 20 feet to 30 feet.

History

The history line the source prints at the end of the section.

(Ord. of 07-16-2023(1), 7-16-2023)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:manchester/zoning/4.27@2026-11-11-c442f64b52

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Manchester Zoning Ordinance, Section 4.27. Subdivision access control | Georgia Commons