The city may require on-site storm drainage and detention facilities for any subdivision, or commercial or industrial development project. The rate of run-off from any development shall not exceed the rate that existed prior to the development. On-site detention facilities shall be constructed for a 100-year storm, and may include permanent retention basins, underground storage of storm water, roof system retention, parking lot design for controlled release of storm water, or other structures approved by the city engineer. Plans for storm water detention facilities shall be accompanied with storm water runoff calculations based on recognized formulas, and shall conform to the requirements of generally accepted engineers practice.