A. [Easements.] All lots within a subdivision shall provide easements for stormwater drainage and detention systems, sanitary sewers, and, for gas, electric, and telephone utilities. B. Rear lot line easements. Easements along all rear lot lines shall be a minimum of 20 feet wide. Ten feet shall be provided on the final plat from each adjoining lot. Wider easements may be required depending on the size, location, and depth of proposed or existing sewers. C. Side lot easements. Easements along side lot lines shall be a minimum of 20 feet wide, ten feet along each adjoining lot. Wider easements may be required depending on the size and depth of proposed or existing sewers. D. Easements along streams and drainage ways. Where a watercourse, drainage way, channel or stream traverses a subdivision, there shall be provided a storm water drainage easement or drainage right-of-way along each side of the watercourse for the purpose of widening, deepening, relocating, improving, or protecting such easement. The easement shall not be less than 25 feet wide. A wider easement may be required for large streams and drainage ways. The easement shall extend from the top of the stream bank at least 12.5 feet away from the stream. (Note: State law prohibits any land-disturbing activity within 24 horizontal feet from the banks of any state waters, as measured from the point where vegetation has been wrested by normal stream flow or wave action.) E. Minimum lot area and easements. Proposed subdivision lots that are traversed by utility easements for gas, electric, telephone, and water and sewer utilities shall contain the minimum buildable area defined by the zoning district, exclusive of outside of areas occupied by these easements. F. Stormwater detention facility easements. All stormwater detention facilities shall be accessible from a public street by a minimum 20-foot wide easement and there shall be an easement for the detention facility including a minimum of 20 feet around the outside perimeter of the facility.