A. Generally. Sanitary sewers shall be installed to serve all lots with connection to the public system. Prior to the submittal of construction plans, the location, size, plans and specifications of the sanitary sewer system shall be approved by appropriate city officials, and the Georgia Environmental Protection Division as required. B. Minimum sewer pipe diameter. All sewer lines within a subdivision shall be at least eight inches in diameter. Larger diameter lines may be required by the water and sewer department where necessary to provide adequate capacity for anticipated development in the immediate area of the subdivision, or to serve the requirements of certain uses within industrial or commercial office subdivision, or within a planned unit development project. C. Sanitary sewer collection system. Lateral sanitary sewer lines within a subdivision shall include a minimum of four-inch diameter sewer service connection installed for each lot. The service connection shall be extended to the rightof-way and clearly marked with the clean out extended four feet above finished grade and capped until the lot is developed. D. Construction drawings. Construction drawings for the sewer system within a subdivision shall be submitted to the water and sewer department and the city engineer for approval. All construction shall be done in accordance with design specifications of the water and sewer department and the city engineer. E. [Certification of drawings.] A professional engineer registered in the State of Georgia shall certify construction drawings. F. Design. A professional engineer registered in the State of Georgia shall design the proposed sewer system. The following specifications shall apply: 1. Sewer pipe shall be PVC or ductile iron pipe as per standards and specifications of the water and sewer department. 2. The minimum sewer pipe size shall be eight inches for mains and minimum four inches for stub outs. Minimum slope. All sewers shall be designed to give mean velocities when flowing full of not less than 2.7 feet per second. All velocity and flow calculations shall be based on the Manning Formula using an N value of 0.013. Exceptions to these minimum slopes shall be made at the upper end of lateral sewers serving under 30 houses. The sewer shall have a minimum slope of 0.70 percent. Where lateral sewers served less than ten houses, the minimum slope shall not be less than one percent. Minimum Slopes for Sewer Size Indicated Sewer Size (Inches) Minimum Slope (Feet per 100 Feet) 8 0.60 10 0.44 12 0.36 15 0.28 18 0.24 21 0.20 24 0.16 3. Ductile iron pipe shall be used as follows: a. Where the sewer line crosses drainage structures or open streams; b. For the influent joint of pipe at all drop manholes; c. For outfall sewers at depths less than four feet; and greater than 16 feet; d. For stub-outs at depths of less than five feet. 4. Sewer lines shall be located along the centerline of the street wherever possible. Wherever sewer lines are located outside the centerline of the street, a minimum 20-foot sanitary sewer easement will be required, with the easement following the centerline of the sewer and designated clearly on the final plat. 5. The minimum depth for sewers located in street shall be seven feet for mains and five feet for stub-outs, or as determined by the water and sewer department. 6. Manholes shall be located not further than 400 feet apart. Manholes shall be constructed at all turns and grade changes. 7. Sewer lines shall be located within a minimum 20-foot easement when not located within a public right-of-way, as provided in subsection F.4. of this section. The water and sewer department may require wider easements depending upon the depth and size of the sewer line. 8. The water and sewer department reserves the right to revise the design [of] any and all sewer lines, and related materials, accessories, and fittings within a subdivision. 9. Where required. Where it is anticipated that the water and sewer department will extend a trunk or interceptor sewer line adjacent to the subdivision, sewer service lines shall be installed within the subdivision and temporarily plugged or capped at the points of service connection in the proposed lateral or trunk sewer line at individual lot lines in accordance with the water and sewer department specifications.