Manchester · Zoning Ordinance

Appendix A - ZONING / Article 5B - TELECOMMUNICATION TOWER REGULATION

Sec. 505B. Requirements.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) At the time of filing the application for a tower, the applicant shall provide a site plan and information regarding topography, coverage zone, and tower height requirements.

(b) Shared usage of towers and antenna facilities is encouraged, and towers shall be designed to accommodate such uses. Applicants are

required to explore and fully utilize existing tower and antenna space.

(c) All towers and antennas must meet or exceed current standards and regulations of the Federal Aviation Administration, the Federal Communications Commission, or such governing agency guidelines as may be established by named agencies.

(d) Lighting. No illumination is permitted on telecommunications facilities unless required by the FCC, FAA or other state or federal agency of competent jurisdiction or unless necessary for the air traffic safety. If lighting is required or necessary, the city council may review the available lighting alternatives and approve the design that would cause the least disturbance to the

surrounding uses and views.

(e) Advertising. No advertising or signage is permitted on telecommunications facilities.

(f) Visual effects. If an antenna is installed on a structure other than a tower, the antenna and associated electrical and mechanical equipment must be of neutral color that is identical to, or closely compatible with, the color of the supporting structure so as to make the antenna and related equipment as visually unobtrusive as

possible.

(g) Accessory uses. Accessory structures used in direct support of a telecommunications facility shall be allowed but shall not be used for offices, vehicle storage or other outdoor storage. Mobile or immobile equipment not used in direct support of a telecommunications facility shall not be stored or parked on the site of the telecommunications facility.

(h) Lot size and setbacks. Telecommunications facilities must be set back from any property line a sufficient distance to protect adjoining

property from the potential impact of telecommunications facility failure by being sufficiently distant to accommodate such failure of the site.

Such setback distance shall in no event be less than the calculated distance covered by the telecommunications facility should such fail, plus an additional ten feet.

(i) On-site vegetation. Existing on-site vegetation shall be preserved or improved, and disturbance of the existing topography shall be

minimized, unless such disturbance would result in less visual impact of the site to the surrounding area.

(j) Buffer strip and fence. Any tower site (including the entire "guyed" area) shall be surrounded by a buffer strip and fence as approved by the city council based on applicable regulations of the UDO for buffers and fencing.

History

The history line the source prints at the end of the section.

(Ord. of 6-16-2022)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:manchester/zoning/505b@2026-11-11-3a6c57924e