In the case of a primary structure being built on an infill lot, the front setback shall be based on the average of the front setbacks of the adjacent primary structure on the left and right sides of the infill lot. If the abutting property is an empty lot(s), the front setback of the nearest adjacent primary structure shall be used. Additional methods of averaging the front setback of an infill structure shall be approved by the director.