Principal solar energy systems.

(a) Dimensional requirements.

(1) Minimum lot sizes. The minimum lot size needed to place a principal solar energy system is listed in table 4.1 (below):

Table 4.1: Minimum Lot Size in Acres Zoning District Agriculture/Forestry (R-1) Residential Low- Density (R-1) Residential MediumDensity (R-2) Residential HighDensity (R-3)

Commercial/ Business (C-1 & C-2) Industrial/Mining (I-1 & I-2) Office/Institutional (T-1) Ground-mounted solar energy system, principal 3 3 3 3 1 3 1 Ground-mounted with coverage of > 50% of footprint of principal structure on lot 3 3 3 3 1 3 1

(2) Setbacks. Principal solar energy systems shall have a minimum setback of 20 feet in addition to existing setback established in the zoning district. This applies to edge of any solar collectors or mechanical equipment related to solar energy systems. Power inverters, transformers, and other related equipment connected with the inversion of power shall have a setback of 50 feet in addition to existing setback established in the zoning district.

The ideal location for power inverters, transformers and related equipment should be located in the center of the principal solar energy system development. Deviations from this ideal must be requested in the development request.

(3) Height of principal solar energy system collector. Height of ground-mounted or parking-mounted solar collectors and mounts shall not exceed 20 feet in height when oriented to maximum tilt for principal solar energy system collectors.

(4) Maximum lot size. A principal solar energy system shall not be located on lots greater than 25 acres in area.

(5) Contiguous parcels. A principal solar energy system shall be located only upon a contiguous platted parcel.

(b) Relationship to other land uses.

(1) Airports. Any solar energy system proposed within a 20,000-foot radius of an airport runway shall present evidence that they have gone through a review process with the Federal Aviation Administration (FAA). This review from the FAA shall indicate that the proposed solar energy system shall not interfere with normal operation of aircraft in an area. This review must be presented and evaluated by staff prior to any development beginning.

(2) Historic districts. No principal solar energy system shall be located in a designated National Register Historic District. Districts in existence at the time of the adoption of this article are the Boneville District, the Thomas Carr District, the Hayes Line District and the Wrightsboro District. When additional designations are made by the United States Department of the Interior, this location restriction shall apply upon any subsequent location request.

(3) Historic structures. All historic structures as recorded by the Historic Preservation Division of the Georgia Department of Natural Resources located within 1,000 feet of a proposed development must be listed and located in a development application.

(4) Environmentally sensitive areas. Principal solar energy systems proposed for development in an environmentally sensitive area must provide an environmental impact statement for evaluation prior to approval.

(5) Residential land uses. Principal solar energy systems may be allowed in areas in residential zoning districts (or areas in which the primary land use is residential) as long as the minimum lot size is met (table 4.1) and setbacks are met (subsection 44-234(a)(2)).

(c) Buffering and screening.

(1) Fencing. A security fence at a minimum height of eight feet with a gate and locking mechanism shall enclose the perimeter of the principal solar energy system to deny access to any individuals not authorized to be on the property and for public safety.

(2) Buffering and screening. After a review of a proposed solar energy system by the zoning administrator or legislative body, either entity may require a buffer or screening for the proposed solar facility. If it is determined that either a buffer or screening is necessary, one or a combination of the following options may be implemented:

a. On-site mature vegetation exist at a minimum height of ten feet and depth of the building setback for the zoning district plus 20 feet between the security fence and adjacent properties and right-of-way; or

b. A single row of evergreens in combination with mature vegetation installed at a height of five feet achieving opaqueness and a minimum height of ten feet in five years; or

c. A double row of offset evergreens absent mature vegetation, installed at a height of five feet achieving opaqueness and a minimum height of ten feet in five years;

or

d. A berm combined with evergreens vegetation installed at a height of five feet achieving opaqueness and a minimum height of ten feet in five years.

(d) Signage.

(1) Allowed signage. The manufacture's and/or installer's identification and appropriate warning signs shall be posted in a clear and visible manner at the site. This sign must follow the provision of the sign ordinance for the area in which it is located. A warning sign concerning voltage must be placed on the main gate and include the name and contact phone number for the solar energy system operator in case of emergency.

(2) Advertisements. No business signs, billboards, or any other advertising shall be installed on any mechanical equipment or solar panels nor placed on the property on which the solar energy system is the principal use.

(e) Construction and operation.

(1) Transmission lines. All power transmission lines located within the principal solar energy system on a single lot shall be placed underground to the extent possible.

(2) Glint and glare. All solar panels or arrays used for the principal solar energy system shall be located to avoid glint and glare onto upon [sic] adjacent properties and adjacent roadways in a manner that shall not create a safety hazard.

(3) Noise. Noise levels of all mechanical equipment related to principal solar energy systems should not exceed 65 decibels (dB) at the property line on which the PSES is located.

(4) Decommissioning. Applicants proposing a principal solar energy system shall include in its application to develop a principal solar energy system contingency plans for decommissioning the system that shall include plans for disassembly of the system and its removal.

(f) Application required for principal solar energy systems. Principal solar energy systems may be permitted within the boundaries of McDuffie County as a special use. This requires the potential developer of this facility to go through established procedural processes within the article and provide a submittal package as established in subsection 44-234(g). No land disturbance permit may be issued for or principal solar energy system to begin development without approval from the Board of Commissioners of McDuffie County.

(g) Processing applications for principal solar energy systems. A principal solar energy solar system may only be approved as a special use on a lot. A special use application must be submitted as set forth in the article and shall also be subject to and processed in accordance with this section of the article. A special use is not a use by right, and may be subject to approval, approval with conditions, or denial by action of the Board of Commissioners of McDuffie County acting upon a recommendation of the McDuffie County Planning Commission. A submittal package is required for proposed principal solar energy systems which shall include the following:

(1) Application. A special use application shall be submitted by anyone wishing to place a principal solar energy system within the municipal/county boundaries.

(2) Recorded plat or boundary survey.

(3) Site plan. The scaled site plan must show property boundaries, location and size (area) of solar collectors and mechanical equipment related to solar, fencing, and if applicable the location of natural buffering and screening features located on the property.

(4) A description of solar collectors and mechanical equipment related to solar including:

a. UL certification for equipment on site,

b. Written documentation stating that the facility is in compliance with all applicable federal and state regulations.

(5) Other information may be required by the development code administrator.

History

The history line the source prints at the end of the section.

(Ord. of 8-18-15(1), Art. 4)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:mcduffie-county/zoning/44-234@2026-09-15-3935dfdaeb

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

McDuffie County Zoning Ordinance, Sec. 44-234. Regulations for specific land uses or supplemental use requirements— | Georgia Commons