As used in this chapter, the following terms shall have the meanings ascribed below. Code enforcement officer means any person contracted with or employed by a state, county, or municipality who has enforcement authority for health, safety, or welfare requirements and is authorized to issue citations or file formal complaints regarding the same, per O.C.G.A. ยง 36-74-21(1). Data center means a facility or group of buildings primarily devoted to the housing, operation, and maintenance of computer servers, storage devices, and related equipment for the electronic storage, processing, management, and dissemination of data, including cloud computing, artificial intelligence training, hyperscale operations, colocation facilities, enterprise IT operations, and high-performance computing (HPC). This definition expressly excludes: cryptocurrency mining operations (governed separately by applicable ordinance); residentialscale server installations; telecommunications facilities; and incidental data processing in non-data-center uses such as offices or warehouses. Server rooms or similar IT operations that are subordinate to a primary use are not included. High-density data center means a data center requiring a high-density load service. High-density load service means any individual service at or above 600 amps in which the energy use intensity (EUI) is calculated as greater than 250 kilowatt-hours per square foot per year in total for all operating square footage. Research and development facility means a facility used for the investigation, design, testing, and refinement of new or improved technologies, involving systematic study and experimentation to create innovative products, enhance existing solutions, or discover new methods and materials. Engineering, healthcare, information technology, and manufacturing users may utilize these facilities. Substation means an electric utility facility that converts higher voltages to generate sufficient power for a data center at maximum efficiency, which may operate independently for a dedicated site once directly connected to a transmission line. Water usage effectiveness (WUE) means the ratio of total annual water consumption to total annual IT equipment energy consumption (in kilowatt-hours), as defined by The Green Grid, with a target of less than 0.476 gallons per kilowatt-hour for compliance.