(a) Data centers shall be permitted only by special exception under the applicable zoning ordinance of the county, subject to the standards of this chapter. Where a data center requires a conditional or special use permit, the standards herein shall constitute minimum requirements for any such approval. (b) Data centers shall be located only on sites meeting all of the following minimum criteria: (1) Minimum parcel size of 50 acres, unless a variance is granted by the board of commissioners. (2) At least 500 feet from the boundary of any existing residential dwelling or subdivision, measured from the nearest point of the data center building to the residential structure or subdivision boundary. (3) At least 1,000 feet from any school, place of worship, hospital, or public park. (4) Outside any FEMA-designated special flood hazard area (100-year floodplain). (5) With direct access to a state or federal highway or county road capable of accommodating heavy truck traffic, as determined by the community development director. Bonding for the full repair of all local infrastructure used in the construction of the center shall be required. (6) Not within one mile of a municipal boundary unless coordinated with the adjacent municipality.