McDuffie County · Zoning Ordinance
Part II - CODE OF ORDINANCES / Chapter 44 - LAND DEVELOPMENT CODE / Article XII - DATA CENTERS / Division 3 - OPERATIONAL STANDARDS
Sec. 44-271. Noise standards.
About this text
- As published by Municode, current through 2026-09-15
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Noise level. Operators shall not cause, allow, or permit the operation of any source of sound that creates, at the nearest occupied residential building or defined sensitive receiver, a sound level exceeding:
(1) Sixty dBA during daytime hours (7:00 a.m. to 10:00 p.m.); or
(2) Fifty dBA during nighttime hours (10:00 p.m. to 7:00 a.m.).
Where the applicable zoning ordinance specifies a more restrictive standard, including but not limited to a 70 dB limit measured at the exterior property line, compliance with all applicable standards shall be required.
(b) Pure tone prohibition. No operation shall produce vibration or pure tones where the one-third octave band sound pressure level in the band of interest exceeds the arithmetic average of the sound pressure levels for the two adjacent one-third octave bands by the corresponding values as follows:
(1) Five dB for center frequencies of 500 Hertz and above;
(2) Eight dB for center frequencies between and including 160 and 400 Hertz; and
(3) Fifteen dB for center frequencies less than or equal to 125 Hertz.
(4) A pure tone shall be deemed present upon measurement.
(c) Compliance measurement. For permitting and compliance purposes, measurements shall be performed using a calibrated type 1 sound level meter, configured to log and record one-third-octave flat-weighted equivalent sound pressure levels and A-weighted equivalent level (Leq), slow time weighting, with a 15-minute averaging interval, at no closer than 100 feet from an occupied residential structure or other designated sensitive receiver. Terminology and measurements shall follow American National Standard ANSI S12.9.
(d) Pre-occupancy sound study. With any application for rezoning or special use approval, a sound study of the proposed property shall be submitted showing ambient noise levels at the exterior property line, prepared to industry standards. Prior to the issuance of a certificate of occupancy for each building and with all systems functioning, a sound study showing compliance with this section shall be provided to the county community development department. The expense for all testing and reporting shall be the responsibility of the applicant.
(e) Mitigation. If noise levels exceed the applicable threshold, the developer or property owner shall implement mitigation measures, including, but not limited to, acoustically treated enclosures for generators, cooling systems, and other operational equipment, or other measures designed to direct sound upward or otherwise attenuate sound impacts on adjacent property. A noise reduction barrier or device may also be required at the county's discretion. All costs of compliance and mitigation shall be the responsibility of the applicant.
(f) Generators. All generators shall be located away from any adjacent property zoned for residential or agricultural use, or containing ground-floor residential use, to the interior of the site or proposed building complex to the most practical extent possible, and shall not be placed within a buffer or building setback. Except for generator testing, maintenance, or commissioning activities, generator use is limited to backup and emergency use only. Testing shall be conducted to minimize noise and vibration, remain within allowable sound limits, and minimize traffic impacts on adjacent property.
(g) Nuisance. All facilities shall adhere to all applicable nuisance requirements related to noise as found in this Code.
History
(Ord. No. 26-001, 6-16-26)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.