(a) Prior to issuance of a building permit, the applicant shall provide written verification from the applicable utility provider confirming that the applicant has calculated the maximum potential electrical consumption of the proposed use and that the utility supply equipment and related electrical infrastructure are sufficiently sized and can safely accommodate the proposed use during peak consumption hours, including redundancy for outages. (b) Prior to issuance of a land disturbance permit or building permit, whichever occurs sooner, a letter of will serve from the utility provider shall be submitted to the county planning department verifying that the owner, operator, or developer is in compliance with all policies, procedures, and guidelines established by the provider and that the necessary energy shall be provided to the development. (c) Applicants shall disclose projected annual energy use and shall commit to renewable energy sourcing strategies (such as power purchase agreements) per applicable industry standards. (d) All equipment shall be housed in electrically grounded structures with fire-rated enclosures having a minimum 30-minute resistance rating, and with automatic fire baffles. (e) Data centers exceeding ten megawatts of power demand shall submit an energy and sustainability plan identifying measures to reduce carbon intensity, improve energy efficiency, and mitigate environmental impacts.