All applications for building permits shall be accompanied by a set of plans, drawn to scale, a copy of the deed and plat showing the actual dimensions of the lot to be built upon, the sizes and locations on the lot of any existing buildings or structures, the shape, size, height, use and location on the lot of the building or structure proposed to be erected or altered, setback distances, any parking spaces, and such other information as may be necessary to provide for the enforcement of the provisions of this ordinance. If no substantial construction progress has been made within six months of the date of the issuance of the building permit, the permit becomes invalid.