Meriwether County · Zoning Ordinance
Appendix A - ZONING / Article 8 - BUFFER REQUIREMENTS
Sec. 8.2. Determination of buffer requirements between residential, commercial and industrial zones.
About this text
- As published by Municode, current through 2026-01-12
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
When two adjoining properties are dissimilar residential, commercial or industrial zone districts as indicated in table 8.1, the property within the zone district allowing the most intensive uses is required to provide the buffer when acquiring a building permit, unless the buffer was pre-existing. When two adjoining vacant parcels are in dissimilar zone districts as indicated in table 8.1, no buffer is required when the parcel zoned for the less intensive use acquires a building permit.
(1) Buffer requirement. The required buffer shall consist of plantings or a fence, a wall (not otherwise part of a structure or accessory structure), or a berm which meets the screening standards of section 8.3. If plantings are chosen as the method of screening, the planting area shall have a minimum base width of 12 feet.
(2) Buffer requirement. The required buffer shall not have less than a 20-foot base width and shall consist of plantings, plus a fence, a wall (not otherwise part of a structure or accessory structure), or a berm, or any combination thereof, which meets the screening standards of section 8.3.
(3) Buffer requirement. The required buffer shall consist of a 50-foot setback from the adjoining property line containing not less than a 20-foot base width consisting of plantings, plus a fence, wall (not otherwise part of a structure or accessory structure), berm, or any combination thereof, which meets the screening standards of section 8.3.
(4) Buffer requirement. The required buffer shall consist of a 100-foot setback from the adjoining property line containing not less than a 20-foot base width consisting of plantings, plus a fence, a wall (not otherwise part of a structure or accessory structure), a berm, or any combination thereof, which meets the screening standards of section 8.3.
(5) Buffer requirement. The required buffer shall consist of either a non-vegetated 500-foot setback or 200-foot vegetated setback from the adjoining property line. A 200-foot minimum setback shall consist of 75 feet of vegetated buffer area, measured along the entire portion of the property line abutting said use, and such buffer shall extend an additional 125 feet in each direction along the common property line. The 75-foot vegetated buffer shall meet the planting requirements contained in section 8.3.
History
(Ord. No. 2020-04, § 1(Exh. A), 8-25-2020)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.