A building permit, or a sign permit in case of a sign, issued by the zoning administrator, is required in advance of the initiation of construction, erection, moving, or alteration of any building or structure, including manufactured housing, or sign. No building permit or sign permit shall be issued except in conformity with the provisions of this ordinance; however, a building permit issued before the adoption of this ordinance shall remain valid with the same qualifications as issued under this ordinance.