When a building or structure is proposed on a lot and when on either or both lots which adjoin such lot at the street right-of-way line there exists a principal building which does not conform to the setback requirements of this ordinance, the required setback for such building or structure shall be as follows: (1) where only one said adjoining lot contains a principal building with a non-conforming setback, the setback shall be the computed average of (a) the normal setback requirement with; (b) the nonconforming setback, or (2) where both adjoining lots contain a principal building each with a non-conforming setback, the minimum setback shall be the computed average of the two nonconforming setbacks.