Sec. 114-66. Utility installations.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Easements and widths.
(1) Generally. All lots within a subdivision shall provide temporary and permanent easements for stormwater drainage and detention systems; for sanitary sewer installations; for water line installations; and for gas, electric, and telephone utilities.
(2) Rear lot line easements.
a. A permanent easement of not less than 20 feet in width shall be reserved for the uses described in this section along the length of all rear lot lines. Said easements shall be shown on the final plat together with a short and plain statement that the easements shown are reserved to the city for utility purposes including stormwater drainage and detention system and sewer and water installation purposes.
b. An additional easement of not less than 20 feet in width adjacent to the permanent easement shall be reserved during the period of construction or as is reasonably necessary for the proper installation, maintenance and repair of the improvements.
(3) Side lot line easements.
a. A permanent easement of not less than ten feet in width shall be reserved for the uses described in this section parallel to and along the length of all side lot lines.
Said easements shall be shown on the final plat together with a short and plain statement that the easements shown are reserved to the city for utility purposes including stormwater drainage and detention systems.
b. An additional easement of not less than 20 feet in width adjacent to the permanent easement shall be reserved during the period of construction or as is reasonably necessary for the proper installation, maintenance and repair of the improvements.
(4) Easements along streams and drainageways.
a. Where a subdivision is traversed by a watercourse, drainageway, channel, or stream, on each lot through which said watercourse, drainageway, channel, or stream traverses, there shall be provided an easement of undisturbed buffer, in addition to any other easement provided for in this section, of not less than 25 feet measured from the outermost edge of the bank of the watercourse, drainageway, channel, or stream contained within the lot for which the easement is required.
A wider easement may be required for large streams and drainageways and for future sanitary sewer installations as provided for in this section.
b. In a subdivision lot in which a watercourse, drainageway, channel, or stream forms the rear or side lot line, the easement provided for in subsections (a)(2) and
(3) of this section shall be in addition to, and shall be measured from the termination of, the undisturbed buffer easement provided for in subsection (a)(4)a of this section.
(5) Sanitary sewer line easements.
a. A permanent easement of not less than 20 feet in width shall be provided over, across, under and through each subdivision lot. The easement shall be located to follow the natural contour of the lot so as to obtain maximum gravity flow from the adjacent property across the easement property to the next property.
However, this requirement shall not be interpreted to affect residential, commercial, or industrial structures that are placed on the property in the course of development.
b. An additional easement of not less than 20 feet in width adjacent to the permanent easement shall be reserved during the period of construction or as is reasonably necessary for the proper installation, maintenance and repair of the sanitary sewer line.
(6) Stormwater detention facility easements. All stormwater detention facilities shall be accessible from a public street by an easement of not less than 20 feet in width, and there shall be an additional easement for each detention facility itself, including an area of not less than 20 feet around the outside perimeter of the facility.
(b) Installation of utilities. After grading is completed and approved and before any base is applied, all of the underground work within the street right-of-way, water mains, gas mains, etc., must be installed completely and approved throughout the length of the road and across the flat section. At the same time, all service connections must be stubbed out to each lot.
(c) Water supply systems; public water system. When a public water supply is available through the city within one mile of a proposed subdivision, and this supply is of sufficient pressure to adequately provide for the needs of the proposed subdivision, and connection to it is permitted, the subdivider is required to connect to said city public water supply and all mains, fire hydrants, and stub connections to each lot within the subdivision must be provided as shown on approved construction plans and must meet the requirements and development standards of the city.
(d) Sanitary sewer disposal systems; public sewerage system. When the city public sewerage system is available within one mile of a proposed subdivision and is of sufficient capacity to adequately provide for the needs of the proposed subdivision, and connection to it is permitted, the subdivider is required to connect to said public sewer system. Sewage mains, and stub connections to each lot within the subdivision must be provided as shown on approved construction plans and must meet the requirements and development standards of the city.
History
(Res. of 6-15-2004, § 1(app. A, § 504))
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.