--- title: Milner Zoning Ordinance, Sec. 118-464. Specifications for construction plans collection: local-codes id: local-code:milner/zoning/118-464 cite_as: Milner, Ga., Zoning Ordinance § 118-464 canonical_url: https://georgiacommons.org/code/local/milner/zoning/118-464 md_url: https://georgiacommons.org/code/local/milner/zoning/118-464.md text_url: https://georgiacommons.org/code/local/milner/zoning/118-464/text source_url: https://library.municode.com/ga/milner date: 2026-11-11 status: active jurisdiction: city:milner jurisdiction_name: Milner place_fips: "1351604" corpus_version: local-codes-milner-69d5170e2358 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/milner/zoning/~part-ii/~part-b/~chapter-118/~article-vi/~division-4.md previous: https://georgiacommons.org/code/local/milner/zoning/118-463.md next: https://georgiacommons.org/code/local/milner/zoning/118-465.md index: https://georgiacommons.org/code/local/milner.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:milner/zoning/118-464@2026-11-11-feeaf0d8f1 --- # Milner Zoning Ordinance, Sec. 118-464. Specifications for construction plans > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Part B - LAND DEVELOPMENT REGULATIONS / Chapter 118 - ZONING / Article VI - COMMERCIAL/INDUSTRIAL DEVELOPMENT ORDINANCE OF THE CITY OF MILNER, GEORGIA / Division 4 - GENERAL PROCEDURES Construction plans must meet the minimum standards of design set forth in this section and must include the following: (1) A letter requesting review and approval of the construction plans, giving the name, address and telephone number of the developer submitting the plan; (2) Name and location of the development; (3) Name, address, telephone number and seal of engineer preparing the plan; (4) Vicinity map; (5) Date, scale, north arrow and number of sheets; (6) Zoning of property; (7) Zoning of adjoining property; (8) Location and dimensions of all existing structures (principal and accessory); (9) Locations and dimensions of all proposed structures (principal and accessory) and proposed uses; (10) Rights-of-way, pavement edges, centerlines of roadways and all easements; (11) Minimum yards and setbacks specified in the zoning ordinance; (12) Exits, entrances, internal circulation patterns showing traffic lanes, fire lanes and acceleration/deceleration lanes, and streets and driveways on both sides of the street within 100 feet of a property line; (13) Parking layout, including handicapped parking and landscaping; (14) Required landscape areas, buffers and screening; (15) Off-street loading; (16) Location of refuse collection and any outside storage and/or service areas, and how such refuse and storage areas will be screened; (17) Signs; (18) Field run or aerial topographic map referenced to a datum of mean sea level with contour intervals not to exceed two feet; (19) Water and sanitary sewer plans (if applicable) which comply with all city sewer system standards; (20) A specification chart on the plans with all pipe gauges and other pertinent specifications; (21) Site grading plan with soil erosion and sedimentation control plan in accordance with the Towaliga Soil and Water Conservation District office standards; (22) The 100-year floodplain must be depicted accurately and bear the certification of a registered professional engineer or professional surveyor and the sources of all data shall be identified on the plan. (23) Hydrology study. a. Hydrology study will be required for storm frequencies of two, five, ten, 25, 50 and 100 years. Studies shall include pertinent hydrographs, drainage maps, and outlet structures (plan and profile views). b. Detention is required for storm frequencies of two, five, ten, 25 and 100 years. No additional runoff will be allowed over the predeveloped rate. All detention facilities shall be fenced with a cyclone fence a minimum of six feet in height. Potential access to detention facilities shall be provided by means of a 15-foot minimum width fence gate, latched and locked five or more feet above grade, a 15-foot minimum width easement to a public right-of-way. c. Detention requirement for any development located adjacent to a watercourse with drainage basin significantly larger than the area proposed for development may include a required "timing study" analysis. If required, such study must comply with the guidelines set forth in the Georgia Stormwater Management Manual utilizing acceptable methods for determining flow path time and hydrographs. HEC-1 models must be utilized to produce hydrographs of the site and basin for use in determining peak flow rates at the study point determined to be the critical point of study. The ten percent rule outlined in the Georgia Stormwater Management Manual should be utilized in studying the downstream impact of development and reported in the study. A predesign meeting will be required before plans or a study is developed and submitted for review. (24) Total area of the property; (25) Area to be developed; (26) Area of impervious surface; (27) Percentage of impervious surface; and (28) Locate all viable trees over eight inches in diameter on the plat. ## History (Ord. No. 2009-3, § 1(405), 11-16-2009)